QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION I
B
27.11.08
Ready For Construction
SB
EO
AG
RFC
H
B
24.11.08
Ready For Construction
SB
EO
AG
RFC
G
A
23.10.08
Company Comments Incorporated
SB
EO
AG
CCI
F
A
17.09.08
Issue for Review
SB
EO
AG
IFR
E
A
14.09.08
Issue for Review
SB
EO
AG
IFR
D
A
08.04.08
Ready For Construction
BR
UA
ZG
RFC
C
O
03.12.07
Issued for Company comments
BR
AU/MC
ZG
ICC
B
22.11.07
Issued for Review
BR
AU/MC
ZG
IFR
A
20.11.07
Issued for Internal Review
BR
AU/MC
ZG
IIR
Date
Description
GAMA Rev. No.
Project Rev No.
Prepared Checked Approved By By By ORIGINATOR
Status
Document Title:
LINDEGINEERING AG
ITP FOR STRUCTURAL STEEL PRE-ASSEMBLING AND ERECTION (FSI) Document No.
Contractor
Gama Qatar Co. W. L. L.
LOC470 GAM
ITP
QAC
GTL
026
I
Org. Code
Doc. Type
Disc. Code
Geogr. Area
Seq. No
Rev. No
Project Document Number: T-4.250.917
Vendor Code
Rev No: B
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-026
C2 ASU Construction Works
ITP FOR STRUCTURAL STEEL PRE-ASSEMBLING AND ERECTION ( FSI ) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
DATE: 27.11.08 - Rev. I A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
1.0
1.1
2.0 2.1 2.2 3.0 3.1 4.0
Activity
Test Frequency
Reference Document
Acceptance Criteria
Responsible Party
Verifying Documents
S
X
QA/QC
-
H
R R
C
A
METHOD STATEMENTS/PROCEDURES Applicabl Quality Control Procedure e QC QCP for Pre-assembly and T-13.376.359 Procedur T.4.250.907 erection of structural e steel. CONTROL OF INSPECTION, MEASURING AND TESTING EQUIPMENT Torque wrenches Validity 100% T.4.250.915 Inspection measuring and QC Procedure for 100% T.4.250.915 test equipment calibration calibration
Calibration certificate
H R R
QCI
Calibration certificate
H R R
QC INSPECTO R
Applicable Standards
I
MATERIAL CERTIFICATES Receiving of structural steel materials A. INSPECTIONS
100%
Material Test Certificates
Material Test Certificates
R R
STRUCTURAL STEEL ASSEMBLING 4.1
Verification of applicable WPS, Welder Qualifications
T-4.250.917 Rev. B
100%
34.28.00-31; T.13.376.359E
AWSD1.1 / ASME IX
Welding Engineer
WPS
H H H H
Page 4 of 15
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-026
C2 ASU Construction Works
ITP FOR STRUCTURAL STEEL PRE-ASSEMBLING AND ERECTION ( FSI ) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
DATE: 27.11.08 - Rev. I A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
4.2
4.3
Activity
Inspections of structural steel weld preparation. Fit up, tack welding, Pre Dimensional Checks ( If required ) Inspection of Preassembled Structural steel a) Dimensional acceptance
Test Frequency
Reference Document
Acceptance Criteria
Responsible Party
Verifying Documents
100%
34.28.00-31; T.13.376.359E
AWSD1.1
QC Inspector
GAM-QCR-QAC-GTL-035
100%
34.28.00-31; T.13.376.359E
AWSD1.1& T-13376.377
QC Inspector
GAM-QCR-QAC-GTL-035
IFC Drawings
QC Inspector
S
X
C
I
H S
I
W S
I
S R
A
b) Welded joints acceptance STRUCTURAL STEEL INSTALLATION Foundation acceptance a) Check elevation of foundation 4.4
b) Location of anchor bolts (if applicable) c) Embedded plates installation (if applicable)
T-4.250.917 Rev. B
100%
IFC Drawings
GAM-QCR-QAC-GTL-037 (Revised)
Page 5 of 15
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-026
C2 ASU Construction Works
ITP FOR STRUCTURAL STEEL PRE-ASSEMBLING AND ERECTION ( FSI ) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
DATE: 27.11.08 - Rev. I A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
4.5
4.6
4.7
4.8
4.9
Activity
Verify a) Visual inspection of field welds. b) Repair welds (if applicable). Verification of lifting points & support points(During transportation, Before& after lifting the structure) Check bolt tightening a) Verification of torque b) Check anchor bolt tightening (if applicable) Verify a) alignment b) verticality (after bolt tightening and or welding) Painting / Coating Repair works ( if applicable)
T-4.250.917 Rev. B
Responsible Party
Verifying Documents
S
X
IFC Drawings
QC Inspector
GAM-QCR-QAC-GTL-037 (Revised)
I
S S
T.4.250.897
34.28.00-31; T.13.376.359E
Site Engineer
---------------
I
S S
100%
T.4.250.907
34.28.00-31; T.13.376.359E
Site Engineer
GAM-QCR-QAC-GTL-041 & Red Indication Mark over bolt head
I
W S
100%
T.4.250.907
34.28.00-31; T.13.376.359E
Site Engineer
I
W S
I
W S
Test Frequency
Reference Document
100%
Applicable WPS
100%
Acceptance Criteria
Refer To Painting ITP
GAM-QCR-QAC-GTL-038, 039
C
A
Page 6 of 15
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-026
C2 ASU Construction Works
ITP FOR STRUCTURAL STEEL PRE-ASSEMBLING AND ERECTION ( FSI ) S. GAMA QATAR
X. CONTRACTOR QC
DATE: 27.11.08 - Rev. I
C. COMPANY
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
4.10
Activity
Test Frequency
Reference Document
Grouting Verification of surface preparation
Acceptance Criteria
Responsible Party
Verifying Documents
Refer To Grouting ITP
S
X
C
A
I
W S
I
I
S
W W
Final Inspection of accessories
4.11
Ladders, stairs treads, safety cages, Gratings, Toe plates
100%
T.4.250.907
T-13.376.377; 34.28.00-31; T.13.376.359E
Site Engineer
GAM-QCR-QAC-GTL-040
100%
Manufacturer’s recommendation
Manufacturer’s recommendation
Site Engineer
TPI Report
I
I
100%
T.4.250.907
34.28.00-31; T.13.376.359E
QCI
GAM-QCR-QAC-GTL-146
I
W S
100%
IFC Drawings
As per Project Specification
QCE / QCI
---
I
H H
Davits, Mono rails Equipment platforms Metal Cladding, roofing etc. 4.12
4.13
4.14
Load test (if applicable) Mono Rails, Davits etc Released to next activity a) To Grouting (Civil Work) Inspection on completion and release for Mechanical installation
T-4.250.917 Rev. B
Page 7 of 15
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-026
C2 ASU Construction Works
ITP FOR STRUCTURAL STEEL PRE-ASSEMBLING AND ERECTION ( FSI ) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
DATE: 27.11.08 - Rev. I A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
Activity
4.15
Flaw less (FSI) a) Tightness 1) Loose Bolts 2) Wrong Type of Bolts
4.16
Acceptance of QC Inspection Records
T-4.250.917 Rev. B
Test Frequency
100%
100%
Reference Document
T.13.377.360
IFC Drawings & as per Project Specification
Acceptance Criteria
Responsible Party
Verifying Documents
S
X
As per this ITP
Site Engineer & QA-QC Inspector
GAM-QCR-QAC-GTL-041
I
W S
As per this ITP
QA-QC Engineer – Civil& Structural
---
I
R R
C
A
Page 8 of 15
C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY STRUCTURES ASSEMBLING REPORT Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Item No:
Test Code No.:
Subsystem:
ITP No.:
GAM-ITP-QAC-GTL-XXX
Ref. DWG / Docs: Used Measuring and test equipment ref. (if applicable): General Welding
Repair Welding
( Tick - If Applicable)
Check the following: Item No. 1.
ACC
N/A
Signature
Dimensional to be checked as per Drawing
2.
Fit up checked
3.
Orientations checked
4.
Various bends checked
5.
Welding Acceptable in visual
6.
PT/MT verified
7.
Painting checked
ORGANIZATIONS GAMA REP.
Accepted By
REJ
Description
LINDE REP.
QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-035
NAME
SIGNATURE
DATE
Date
C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY STRUCTURAL STEEL PRE ERECTION & INSTALLATION PROCESS SHEET Subcontract Ref.:
Report No.:
Item Description:
Date:
Item Location/ Area:
ITP No.:
Subsystem:
Test Code No.:
GAM-ITP-QAC-GTL-
Ref. DWG / Docs: Used Measuring and test equipment ref. (if applicable):
Check the following: Item No. Pre Erection : 1.
Description
QC Inspector Initial Date
Foundation Handing over (Civil to Mechanical).
2. 3. 4.
Preparation of grouting (Chipping & Cleaning). Checking for anchor bolt. Shim plate fixed as per RFC drawing & work instructions. Installation Process : 1. Foundation Complete & inspected. 2. All Structural members correctly installed. 3. Base supports are set at correct elevation. 4. Structures Plump & alignment in all directions. 5. Length of bolts is correct. 6. All washers are correctly mounted. 7. Correct tightening for all bolts. 8. All temporary construction materials are removed. 9. Welding acceptable. The Installation of the above Steel has been Satisfactorily completed in accordance with the Drawings& Specifications. Note: This QCR form revised on 23.11.2008 as per the site requirement and QCR form # 125 shall not been used further as per (PMC commends) Transmittal # PI-092-LIN-PMC-TX-21510. ORGANIZATIONS
Accepted By
THIRD PARTY REP.
GAMA REP.
LINDE REP. QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-037
NAME
SIGNATURE
DATE
C2 ASU PEARL GTL PROJECT RASLAFFAN INDUSTRIAL CITY STEEL STRUCTURES ELEVATION REPORT
Ref. DWG / Documents: Used Measuring and test equipment ref. (if applicable): INSPECTIONS Column No
Planned Level
Actual Level
Level/Difference
Plumb 0 Degree
Accepted By
ORGANIZATIONS THIRD PARTY REP. GAMA REP. LINDE REP. QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-038
DATE
NAME
90 Degree
SIGNATURE
C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY ALIGNMENT REPORT FOR STEEL STRUCTURE Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Item Location / Area:
Test Code No.:
Subsystem:
ITP No.:
Ref. DWG / Docs: Used Measuring and test equipment ref. (if applicable): Unit No.: OUT OF PLUMBNESS
Accepted By
ORGANIZATIONS THIRD PARTY REP. GAMA REP. LINDE REP. QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-039
DATE
NAME
SIGNATURE
C2 ASU PEARL GTL PROJECT-RAS LAFFAN INDUSTRIAL CITY CHECK LIST OF LADDER, HANDRAIL, STAIRCASE & GRATING
Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Item Location / Area:
Test Code No.:
Subsystem:
ITP No.:
Ref. DWG / Documents: Used Measuring and test equipment ref. (if applicable):
INSPECTIONS Item
Mark No.
Accepted By
ORGANIZATIONS THIRD PARTY REP. GAMA REP. LINDE REP. QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-040
Check of Ladders
DATE
Check of Handrail
NAME
Check of Staircases
Check of Grating
SIGNATURE
C2 ASU PEARL GTL PROJECT RASLAFFAN INDUSTRIAL CITY BOLT TIGHTENING INSPECTION REPORT
Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Item Location / Area:
Test Code No.:
Subsystem:
ITP No.:
Ref. DWG / Docs: Used Measuring and test equipment ref. (if applicable): INSPECTIONS Item No/Spool No
Mark No./Joint No
Accepted By
ORGANIZATIONS THIRD PARTY REP. GAMA REP. LINDE REP. QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-041
Bolting Grade
DATE
Size
NAME
Bolt Tightening (Torque Value)
Inspector’s Signature
SIGNATURE
Hand Over - Structural Group to Civil Group (For Grouting) Area : Date : Check
Accepted
Not Accepted
N/A
Remarks
Bolt Torque Tightening Completion Alignment Check Anchor Bolts Tightening Check Shim Plates as per Work Instruction Check Module Washing Completion Structural steel works within the area are completed and released for Grouting Works. Check the Punch List Enclosed or Not Ready For Grouting
Enclosures :
1. RFI for Torque Tightening for Field Bolts 2. Alignment Records 3. RFI and All Records for Module Inspection
Accepted By
Handover By (Steel Structures)
Accepted By (Civil / Equipment / Piping)
Name :
Name :
Sign / Date :
Sign / Date :
Name :
Name :
Sign / Date :
Sign / Date :
GAMA
LINDE
Name :
FINAL ACCEPTANCE BY PMC Sign / Date : GAM-QCR-QAC-GTL-146