QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION
F
B
15.03.2008
Ready for construction
SB
UA
ZG
RFC
E
A
26.01.2008
Ready for construction
SB
UA
MC/ZG
RFC
D
O
25.11.07
Company comments implemented
IU
UA/IO
MC
CCI
C
02.10.07
Issued for company comments
UA
IO
ZG
ICC
B
19.09.07
Issued for review
UA
IO
ZG
IFR
A
18.09.07
Issued for internal review
UA
IO
ZG
IIR
Date
Description
GAMA Rev.
Project Rev
No.
No.
Prepared Checked Approved By By By ORIGINATOR
Status
Document No: GAM-ITP-QAC-GTL-021
C2 ASU PEARL GTL PROJECT
INSPECTION AND TEST PLAN Site Preparation and Earth works (FSI) S.
GAMA QATAR
I: INSPECTION / TEST Item
Activity
E. Not Used
X. LINDE QC
R: DOCUMENT REVIEW
Characteristic to be Verified
C.
DATE: 15.03.08 REV. F
PEARL GTL
S: SURVEILANCE
Control Procedure Reference
H: HOLD POINT. W:
Responsible Party
Fill Material 1.0
a) Classification of Soil b) Particle Size Distribution c) Optimum Moisture Content
3
: Every 1000 m /one pile
A. FUGRO (TPI)
T-13.376.490
Laboratory
Acceptance Criteria
WITNESS Verifying Documents
S
X
C
A
Lab Reports
I
R
S
I
BS 6068 and BS3148
Lab reports & Source Certificate
R
R
R
I
Surveyor Report GAM-QCR-QACGTL-001/006/008
I
H
S
I
S
S
As per ASTM: D422 and BS 1377 As per ASTM: D 1557
Water a) Chlorides 2.0
Once a day/any source change
T-13.376.490
Excavation(FSI)
a) Soil condition of excavated bottom b) Excavation completed and approved for next activity
T.13.376.490;T.13.377.360
QC Engineer
Latest RFC & No cracks & voids
Fill (In – situ)
a) Visual inspection prior backfilling and scarifying the top 150 mm of sub grade b) Area free of deleterious material prior to backfilling c) Adjacent below ground structure correctly coated and protected in accordance with project specification
T-13.376.490
Laboratory & Site Engineer
Area Free from Deleterious Material & as Specification
b) Sulphates c) Ph d)Total Solids
3.0
4.0
Checklist No GAM-QCR-QACGTL-007
2
C2 ASU PEARL GTL PROJECT.
Document No: GAM-ITP-QAC-GTL-021
INSPECTION AND TEST PLAN
Site Preparatio n and Earthworks(FSI) S.
GAMA QATAR I: INSPECTION / TEST
E. Not Used
X. LINDE QC
R: DOCUMENT REVIEW
Item
Activity
Characteristic to be Verified
5.0
Soil density (compaction) and layer thickness(FSI)
Type (A): Every 300 m2 Type (B): Every750 m2 Type (c): Every400 m3
6.0
Final Elevation Checks
Level of Final Grade Elevation
C.
PEARL GTL
S: SURVEILANCE
Control Procedure Reference
DATE: 15.03.08 REV.F
Responsible Party
A. THIRD PARTY (TPI)
H: HOLD POINT. W: Acceptance Criteria
T-13.376.490;T.13.377.360
Laboratory
As per Project Specification and ASTM D2922, D3017, D556 and D216
T-13.376.490
Surveyor & Site Engineer
Latest Project RFC Drawings for final grade levels