Protection and control IED manager  PCM600 Exercise 1 - Prepare the t he PCM600 project 1MRG003744

Exercise 1 - Create a project

Copyright This document and parts thereof must not be reproduced or copied without written permission from ABB, and the contents thereof must not be imparted to a third party, nor used for any unauthorized purpose. The software or hardware described in this document is furnished under a license and may be used, copied, or disclosed only in accordance with the terms of such license.

Trademarks ABB is a registered trademark of ABB Group. All other brand or product names mentioned in this document may be trademarks or registered trademarks of their  respective holders.

 ABB AB Substation Automation Products SE-721 59 Västerås Sweden Telephone: +46 (0) 21 34 20 00 Facsimile: +46 (0) 21 14 69 18

www.abb.com/substationautomation

Exercise 1 - Create a project

Create a project

On completion of this exercise you should be abl e to ·

·

Understand what is needed to establish the communication between the PCM600 and an Intelligent Electronic Device (IED) Create a new project in PCM600 and configure an IED object

Protection and control IED manager PCM600 1MRG003744

Page 1

Exercise 1 - Create a project

IPAddressing  As preparation for the upcoming PCM600 exercises, you need to configure the IP address for both the IED and the PC. This is needed since the PC running PCM600 and the IED(s) that PCM600 shall communicate with must belong to the same sub network.

IPAddr ess of the IED's rear port 1. On the local HMI of the IED, select Settings\General Settings\Communication\Ethernet con figu ration \REAR-OEM Port AB

2. Set the Mode to Normal and the IPAddress  to for example 172.16.0.10 . 3. Press the Menu button and save the changes.

Ethernet port settings of the PC The Ethernet settings of the PC are managed in the Windows Control Panel.

4. Open the Control Panel  (Start Menu in Windows), see the figures below.

Exercise 1 - Create a project

5. Choose Network and Sharing Center .

6. Select Change adapter settings .

Protection and control IED manager PCM600 1MRG003744

Page 3

Exercise 1 - Create a project

7. Open the properties  of the network connection you are using.

8. Select the properties of  Internet Protocol Version 4 (TCP/IPv4)

Exercise 1 - Create a project

9. Configure the IP-address and the Subnet mask

Protection and control IED manager PCM600 1MRG003744

Page 5

Exercise 1 - Create a project

Create the PCM600 pro ject PCM600 works with projects. Within these projects, you create and configure your plant structure and the IED objects representing your real substation.

10. Start PCM600

11. Create a new project

12. Name your project. Question: What is missing in the fi gure below?

Exercise 1 - Create a project

Create the plant st ructure 13. Create the plant structure according to the below picture. Name the substation, voltage level and bay level objects according to your own needs.

14. Create a REC670 IED object

15. Select Online Configuration  (because we have the physical IED available)

Protection and control IED manager PCM600 1MRG003744

Page 7

Exercise 1 - Create a project

16. Select the IEC61850 protocol

17. Select the LAN port and provide the IP-address corresponding to your IED rear port settings.

Exercise 1 - Create a project

18. Select Scan. PCM600 will read version, hardware, housing size information etc from the IED.

19. Finalize the configuration wizard.

Protection and control IED manager PCM600 1MRG003744

Page 9

Exercise 1 - Create a project

HW confi guration The HW information was read from the IED when you created the IED object in PCM600 (in online mode). Open the Hardware Configuration tool to view the hardware options you have in your training setup.

20. Open the Hardware Configuration tool

Exercise 1 - Create a project

21. Explore the HW configuration tool. What can be done with this tool?

22. Make a project backup.

Protection and control IED manager PCM600 1MRG003744

Page 11

 ABB AB Substation Automation Products SE-721 59 Västerås, Sweden Phone +46 (0) 21 34 20 00 Fax +46 (0) 21 14 69 18

www.abb.com/substationautomation

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF