INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

INDEX Indicative Inspection & Test Plans SL. No. B.

DESCRIPTION MECHANICAL WORKS

I

Under Ground Piping

II

Above Ground Piping/ Heater Coils

III

Storage Tanks

IV

Equipment Erection (Static)

V

Equipment Erection (Rotary)

VI

Crane (EOT/ HOT)

VII

Column Internals HEATER WORKS

I

Fired Heaters

II

Refractory & Insulation Works Fired Heaters

Sheet 1

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

HP

:

Sheet 2

HOLD POINT. A point which requires inspection/verification and acceptance by Owner/ Consultant before any further processing is permitted. Contractor shall not process the activity beyond a Hold Point without written approval by Owner/ Consultant.

W

:

WITNESS POINT. An activity which requires witnessing by Owner/ Consultant when activity is performed. Suppose, after proper notification has been

provided, the contractor not obliged to

hold further processing, if Owner/ Consultant is not available to witness the activity or does not provide the comments before the date notified. Rw

:

REVIEW of contractor’s documentation.

S

:

SURVEILLANCE Inspection by Owner/ Consultant. Monitoring or making observations to verify whether or not material/ Items or services conform to specified requirements. Surveillance Activities may include audit, inspections, witness of testing, review of quality documentation & records, field visit, personnel qualifications etc.

WC

:

100% Examination by CONTRACTOR.

NDT

:

NON DESTRUCTIVE TESTING.

PWHT

:

POST WELD HEAT TREATMENT.

NOTE

:Contractor to submit required formats and job procedures for each activity listed in ITP’s and submit to Owner/ Consultant for approval. Responsibility for execution of the inspection/ testing is with the contractor. Owner/ Consultant only verify examination or testing done by the Contractor at important stages. Activities for which ITP’s are not given, contractor to develop and get the same approved by Owner/ Consultant well before start of the work.

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL.

ACTIVITY

NO.

Sheet 3

CONTRACTOR

PMC

I

UNDER GROUND PIPING

A

PRIOR TO FABRICATION

1

Incoming Material

WC

W

2

Welding Filler Material Approval/ Qualification.

WC

HP

3

WPS/ PQR

WC

HP

4

Welder Performance Qualification.

WC

HP

5

a

NDT Procedure Qualification

WC

HP

b

PWHT Procedures Qualification (if any)

WC

HP

6

Preparation of Sketches.

WC

S

7

Joint Numbering.

WC

S

8

Material traceability & transfer of heat nos.

WC

S

B

FABRICATION (SHOP & FIELD)

1

Material as per piping class (check w.r.t. approved Colour coding procedure).

WC

S

1

a

Fit-up check

WC

S

b

Dimensional check

WC

S

2

Pre-heat (if any).

WC

S

3

Check for purity of purging/ shielding gas

WC

Rw/S

4

Purging (if any)

WC

S

5

Shielding rate (if any)

WC

S

6

Basking of Electrodes

WC

S

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 4

7

Interpass cleaning & temperature check

WC

S

8

Visual check of completed welds

WC

S

9

Monitoring of PWHT Cycle

WC

S

10

Hardness Check

WC

S

11

PT/MT

WC

S

12

Radiography marking (for Random Radiography)

WC

W

13

Radiography Interpretation

WC

HP

14

Check shot for Radiography

WC

W

C

PROOF TESTING

1

Procedure

WC

HP

2

Correctness of Testing arrangements

WC

S

3

Calibration of Pressure Gauges

WC

Rw

4

R.F. Pad testing, if any

WC

W

5

Positive Material Identification as per Specification after completion.

WC

HP

6

Scrutiny of test packs for Mechanical & NDT Clearance(As per Annexure A)

WC

HP

7

Air / Water Flushing (preliminary)

WC

W

8

Pneumatic/ Hydro testing

WC

P

9

Draining of Water & Air drying

WC

S

D

LAYING

1

Trench excavation and levels

WC

S

2

Cleaning of pipe surface

WC

S

3

Approval of wrapping/ coating material manufacturers WC

HP

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 5

4

Approval of agency for wrapping & coating

WC

HP

5

Sample test of coating materials in approved laboratory WC

Rw

6

Procedure qualification for wrapping & coating

WC

HP

7

Application of primer

WC

S

8

Coal tar temperature

WC

S

9

Coating and wrapping

WC

S

10

Calibration of Holiday tester

WC

HP

11

Holiday testing

WC

HP

12

Thickness of coating

WC

HP

13

Peel test

WC

HP

14

Lifting arrangement

WC

S

15

Lowering (levels & orientation of branches)

WC

S

16

Checking of wrapping and coating for damages during WC lowering, their repair, holiday testing, etc.

17

Back filling

WC

S

18

Location, Brickwork, Plaster of valve pit

WC

S

19

Top cover & finish of valve pit

WC

S

E

SYSTEM COMPLETION

1

Tie in joins (As per Annexure - B)

WC

W

2

Scrutiny of test packs for system testing (As per Annexure - C)

WC

W

System testing

WC

W

3

HP

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 6

Inspection & Test Documents Review Test and Inspection Document

HP

Abbreviations: NDT

:

Non Destructive Testing

WPS

:

Welding Procedure Specifications

U/G

:

Under Ground

PT

:

Penetrant Testing

MT

:

Magnetic Particle Testing

PWHT

:

Post Weld Heat Treatment

Rw

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 7

Plant:

Report: Area :

Contractor: Loop No.: Sketch No.:

Sr.No.

Inch Metre From: ____________ To : ____________

Activity

1.b

2

3 4

Clearance by PMC with Date & Sign

MECHANICAL COMPLETION RECORD (U/G)

A

1 1.a

Check

Clearance by Contractorwith Date & Sign

Clearance for flushing & testing. Mechanical clearance Conformity with drawing. Welding & NDT clearance Material as per piping class Fit-up check Visual check of completed welds LPI checks RF pad testing Flushing & Pressure testing Medium Test pr………. Kg /Sqcm Coating and Wrapping Surface preparation Primer application Coating, wrapping and peel test Holiday check Laying Trench leveling Lowering & checking for damages in wrapping & coating, their repair, holiday testing, etc. Backfilling

Remarks:-

Test loop sketches duly filled in to be enclosed with this (Jt.No., W.No. X SR. Chart No. Alongwith XR Films, SR Charts etc.)

Review by Area Co-ordinator

Sign.

Date

Name

Designation

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 8

INSPECTION REPORT FOR TIE IN JOINT (FOR UNDER GROUND PIPING) JOINT NO. A

REPORT NO. DATE

TTIME AT THE TIME OF FIT UP CLEARANCE BY DATE

B

FIT UP

C

ROOT RUN DP

D

FINAL RUN DP

E

WELDER NO

F

RADIOGRAPHY

G

PWHT HARDNESS

H

RF PAD TESTING

I

CLEANING & PRIMING

J

COATING, WRAPPING & PEEL TEST

K

HOLIDY CHECKING

L

CHECKING FOR ANY DAMAGE IN

CONTRACTOR

PMC

WRAPPING & COATING AFTER LOWERING, THEIR REPAIR, HOLIDAY TESTING, ETC. M

BACK FILLING

Inspection at above stages has been carried out by concerned and found satisfactory.

Contractor

PMC Mechanical

PMC Inspection

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 9

Plant:

Report: Area:

Contractor: Loop No.: Sketch No.:

Sr.No.

Inch Meter From: ____________ To: ____________

Activity

1.b

2

3 4

Clearance by PMC with Date & Sign

MECHANICAL COMPLETION RECORD (U/G)

A

1 1.a

Check

Clearance by Contractorwith Date & Sign

Clearance for flushing & testing. Mechanical clearance Conformity with drawing. Welding & NDT clearance Material as per piping class Fit-up check Visual check of completed welds LPI checks RF pad testing Flushing & Pressure testing Medium Test pr………. Kg /Sqcm Coating and Wrapping Surface preparation Primer application Coating, wrapping and peel test Holiday check Laying Trench leveling Lowering & checking for damages in wrapping & coating, their repair, holiday testing, etc. Backfilling

Remarks:-

Test loop sketches duly filled in to be enclosed with this (Jt.No., W.No. X SR. Chart No. Alongwith XR Films, SR Charts etc.)

Review by Area Co-ordinator

Sign.

Date

Name

Designation

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL.

ACTIVITY

NO.

Sheet 10

CONTRACTOR

PMC

II

ABOVE GROUND PIPING

A

PRIOR TO FABRICATION

1

Incoming Material

WC

W

2

Welding Filler Material Approval/ Qualification

WC

HP

3

WPS/ PQR

WC

HP

4

Welder Performance Qualification

WC

HP

5a b

NDT Procedure Qualification PWHT Procedures Qualification

WC WC

HP HP

6

Joint numbering in Isometries (Big & Small Bore) WC

S

7

Preparation of sketches for job in case of off sites A/G piping and Joint Numbering

WC

S

8

Transfer of Heat Nos. & Traceability

WC

W

B

FABRICATION (SHOP & FIELD)

1

Material as per piping class (check w.r.t. approved WC Colour coding procedure)

S

WC WC

S S S

1a b

Fit-up check Dimensional checks

2

Pre-heat (if any)

WC

3

Check for purity of purging/ shielding gas

WC

4

Purging

WC

S

5

Shielding rate (if any)

WC

S

6

Baking of Electrodes

WC

S

7

Interpass cleaning & Temperature check

WC

S

8

Visual check of completed welds

WC

S

9

Monitoring of PWHT Cycle

WC

S

10

Hardness Check WC WC WC

S W HP

i) For C.S. Materials ii) For A.S. Materials Piping iii) For A.S. Material Heating Coil

Rw/S

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 11

11

PT/MT

WC

S

12

Radiography marking (for Random Radiography only)

WC

W

13

Radiography Interpretation

WC

HP

i.For Carbon Steel Piping ii.For Alloy Steel/SS Piping

WC WC

HP HP

14

Spool clearance

WC

HP

C

ERECTION

1 2

Lifting arrangement Test Certificates for lifting tackles

WC WC

S Rw

3

Location and orientation of branches

WC

S

4

Provision of Instrument Tappings

WC

S

5

Provision of vents and drains

WC

S

6

Correctness of type of supports, anchors, guides

WC

S

7

Correctness of gasket/ fasteners

WC

S

8

Correctness of valves (NRV, Gate, Globe, Control WC Valves), Steam traps and their direction of flow

S

9

Provision of cold pull

D

PROOF TESTING (See enclosed checklist in Annexure-A)

1

Procedure

WC

HP

2

Correctness of testing arrangements

WC

S

3

All valves to be kept open and chek if testing done WC against closed valve position

S

4

Isolation of equipments, control valves, instruments, WC ellows, before testing. Removal of flappers from check valves

S

5

Scrutiny of test packs for Mechanical and NDT Clearance

WC

HP

6

Positive Material Identification as per specification WC after completion of installation

HP

WC

HP

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 12

7

Calibration of pressure gauges

WC

Rw

8

Preparation of check list

WC

S

9

Liquidation of check list

WC

S

10

Air/Water flushing (preliminary)

WC

W

11

Pneumatic / Hydrotesting (See Annexure - B)

WC

HP

12

Draining & drying

WC

S

13

Removal of temporary blinds/ supports

WC

W

14

Pickling of system, if required

WC

W

15

Boxing up including reinstallation of flappers of check valves

WC

W

16

a.

Check on fasteners & gaskets and record Thereof

WC

Rw

b.

Torque tightening of flange joints

WC

S

17

System testing

WC

W

18

Setting of spring supports

WC

W

HP

Rw

Inspection & Test Documents Review Test and Inspection Documents

Abbreviations: NDT

: Non Destructive Testing

WPS

: Welding Procedure Specifications

A/G

: Above Ground

PT

:

MT

: Magnetic Particle Testing

PWHT

:

Penetrant Testing

Post Weld Heat Treatment

For liquidation of Punch list. See Annexure - C.

INDICATIVE INSPECTION & HPCL, Visakh

TEST PLAN TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 13

CHECKLIST FOR MECHANICAL CLEARANCE – A/G Piping (Sheet 1 of 4)

Project:

___________________

Plant/Unit:

___________________

Contractor:

___________________

Loop No:

___________________

Line No (Isometric No.)

Sr. No. 1

2

3 4

5

Rev.

Report No:

___________________

Date :

___________________

Area :

___________________

INCH MTR

___________________

GAD NO.

Items to be checked Installation checked as per Isometric w.r.t. CONFIGURATION : Route, plumb, elevation, clearance for thermal expansion/ insulation BRANCH: Location, angle, orientation, type, R.F. pad etc. STEAM TRAP : Direction Installation checked as per GAD w.r.t. CONFIGURATION : Route clearance for thermal expansion / insulation Installation checked as per P&ID Isometrics completed for (enclosed) a) Joint numbering (Shop and Field welds) b) Spool numbering c) As-built routing and dimensions Valves (Check Rating, Gaskets, Flow direction, Sheet No., Tag No., Spindle direction. CSO, LO/LC, Damage etc.) Gate valve Globe valve Check valve Control valve Tag Nos. Safety Valve Tag Nos. Any other valves

FORMAT NO:_______________________________________ (Sheet 2/4)

Rev.

Acceptance by Contractor

P&ID No.

Witness by Owner/ PMC as required by ITP

INDICATIVE INSPECTION & HPCL, Visakh

TEST PLAN TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 14

CHECKLIST FOR MECHANICAL CLEARANCE – A/G Piping (Sheet 2 of 4) Sr. No. 6 7

8 9 10 11

12 13 14

Items to be checked Strainers: Check for clearance, flow direction, elements Flanged joints Total Nos. Check for type of flange Check for Rating Check for Alignment, (Proper gap and parallelity) Check for correct studs and nuts – dia, length, material, uniform protrusion of studs, anti seize compound Check for correct gasket (type, size, spec., thickness, etc.) Torque values used for tightening Seal welding of Screwed connections (If required) Vents/ Drains as per Dwg. And provision of additional high point vents and / or low point drains, if reqd. Reinforcement pads as per piping class Orifice flanges Check for Tag. No. tapping orientation, tap valve, jack screw, straight run length of upstream and downstream Local Gauges: Check for accessibility Slope (When applicable) Supports a) Guides, Cross Guides, Trunnion etc. i) Check for correct type, material and dimension ii) Check welding iii) Check for vent hole on pads (if applicable) iv) Check offset for thermal expansion v) Check clearance of guide vi) Check U’ bolt for slide support b) Spring support i) Verify tag no. and check details as per data sheet/ spring set ii) Check for locking arrangement and any damage during transit, etc. iii) Check for completeness of installation as per drg. Including welding of mounting cleat/ bracket iv) Check for locking during installation and pressure test c) Bracket support and inserts with Anchor fasteners:

15

i) Check for members dimensions and materiall ii) Check for welding iii) Check for bolting iv) Check for appearance damage Vents/ Drains As per Drg Orientation of valve handles Clearance for hose Requirement of additional vents/ drains (highest/ lowest pt.)

FORMAT NO:_______________________________________ (Sheet 2/4)

Acceptance by Contractor

Witness by Owner/ PMC as required by ITP

INDICATIVE INSPECTION & HPCL, Visakh

TEST PLAN TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 15

CHECKLIST FOR MECHANICAL CLEARANCE – A/G Piping (Sheet 3 of 4) Sr. No. 16

17 17.1 17.2 17.3 17.4 17.5 18

19 20

21

22

Items to be checked

Earthings: a) Check for location b) Check for dimension of lug welding 17 Joints History sheets enclosed for 17.1 Material Traceability as per Procedure No: (refer enclosed suggested format) Fit ups checked NDT Complete (Radiography, MT, PT) Stress Relieving & Hardness Check complete Positive Material Identification (PMI) Checked for Removal Binding off of: a. Control, Safety and Check valves b. In-line instruments c. Rupture discs d. Equipment nozzles e. Others 19 Supports and Weld/Flanged/ Screwed connections free from insulation or other coverage Checked installation of (Indicate location in Drawings) a. Temporary Blinds, Spades b. Temporary Strainers c. Temporary Dummy-spools d. Temporary Gaskets e. Others Expansion Bellows a) Checks prior to installations Physical damage Transit locks are intact Dimensions as per drgs. b) Check during installations Parallelity of mating flanges Face to face dimensions of mating flanges Concentricity of mating flanges No stress on expansion bellows Record c) Isolation during pressure tests Bellow manufacturer’s recommendations on isolation of bellow during Pr. Test to be followed If recommended expn, bellow to be dropped during pr. Test Cleanliness internally and externally 23 Rotating equipment final alignment checked with piping

FORMAT NO:______________________________________ (Sheet 3/4)

Acceptan ce by Contracto r

Witness by Owner/ PMC as required by ITP

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 16

CHECKLIST FOR MECHANICAL CLEARANCE – A/G Piping (Sheet 4 of 4)

Acceptance by Sr. No.

Contractor

Items to be checked

Witness by Owner/ PMC as required by ITP

24

Removal of unwanted construction supports

25

Instrument tappings provided as per Drawing

26

Physical Walk Through The Line Checked for gross irregularities including physical damages, unwanted tacks, arc strikes, spatters and space for thermal expansion Other

Remarks

Contractor : Sign. : Date : Name :

Designation :

PMC Sign :

Review by Area Co-ordinator (PMC)

Date :

Sign :

Date :

Date :

Name :

Designation :

Name :

FORMAT NO:_______________________________________ (Sheet 4/4)

Designation :

INDICATIVE INSPECTION & TEST PLAN HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 17

DAILY MATERIAL TRACEABILITY REPORT

(FOR ABOVE GROUND PIPING/ HEATER) Report No.: ______________ Date : ___________________

Contract No. : _______________________ Contractor : ________________________ Sl. No.

Line / Heater No.

Area

Dia

Joint No.

No.

Spool

Piping Component

No.

Contractor Note : A Sketch of the spool may be enclosed.

Heat / Batch No.

Colour Code

Verified Contractor

PMC

Remarks PMC

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 18

Piping Hydro Test Release / Acceptance Record – A/G Piping (Sheet 1 of 2) Project :

Report No:

Plant / Unit : Contractor : Loop No. :

Date : Area : REF P & ID No. INCH MTR

Line No (s)

Test Medium : Test Pressure Gauge No.

Range

Items to check

From ______________ Isometric No. (s)

To _________________

Test Duration Calibration Certificate No.

Design/ Test pressure

Accept Contractor

P & ID No.

Gauge Calibration Date

Witness PMC

Field installation Checklist prior to Hydrotest Signed Punch list prepared Yes/ No Pre-Hydrotest Punch items cleared Accessibility to inspection/ witness locations Capacity of pressurising pump checked Cordon off area for high pressure testing as required Pre-hydrotest flushing carried out IBR/Others test Witnessing required Yes/ No System released for Pressure Testing : Contractor Sign

PMC Name

Date Designation

FORMAT NO:_______________________________________ (Sheet 1/ 2)

Sign Date Designation

Name

INDICATIVE INSPECTION & HPCL, Visakh

TEST PLAN TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 19

Piping Hydro Test Release / Acceptance Record – A/G Piping (Sheet 2 of 2) Activity

Date

Time

Water Filling and Venting started at Water Filling completed Vents closed Isolation of Pressurising pump Test completed at : - Water drained - Air - Temp Blinds Removed - Checked for reinstallation of a. Control & Safety valves b. On line instruments c. Rupture disks d. Deblinding e. Others - Cold setting of spring supports carried out

Contractor

PMC

Sign

Sign

Date Name

Designation

Date Name

FORMAT NO:_______________________________________ (Sheet 2 / 2)

Designation

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 20

Punchlist Project:

Report No:

Plant/Unit:

Date :

Contractor:

Area :

Loop No:

REF P&ID No.

Description : Ref. Document : Punc h Item No

Priority

Description of Punch Items

Location

Prepared by

Action by

Due Date

Completion Acceptance

Priority: 1 Needed for Pressure test 2. Needed for commissioning 3.Needed for plant acceptance Contractor

PMC

Sign

Sign

Date

Date

Name

Designation

Name

FORMAT NO:_______________________________________

Designation

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO.

ACTIVITY

III

STORAGE TANKS

A 1 2 3 4 5 6 7 8 9 10

PRIOR TO FABRICATION Acceptance of the tanks foundation Materials Filler materials tests and approval WPS/ PQR Welders performance qualification Radiography procedure Joint numbering in drawings Welding equipment and accessories Tools and Tackles Baking ovens - Portable - Heavy Jig & Fixtures Suitability of plate bending machine

11 12 B 1 2 3 4 5 6 7 8

9 10

FABRICATION/ ERECTION BOTTOM Plate size, marking and cutting Blast cleaning & painting of underneath bottom plates Plate layout, overlap and fitup Sequence of welding to follow Size and positioning of backing plate for annular plates Baking of electrodes/ interpass cleaning Visual check LPI/MPI/ Radiography of annular plate butt welds and bottom plate butt welds (if any) Vacuum/ MPI/ LPI of shell portion of the bottom plates Vacuum box test for the bottom plate welding

Sheet 21

CONTRACTOR

PMC

WC WC WC WC WC WC WC WC WC

W W HP HP HP HP S S S S

WC WC WC WC

S S S

WC WC

S S

WC WC WC

S S S

WC WC WC

S S HP

WC

HP

WC

HP

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. 1 2 3

4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19a 19b

ACTIVITY SHELL Plate size, marking and cutting. Plate bending, curvature check, stacking. Shell course alignments and fitup of vertical and circumferential joints. Shell diameter, circularity, perpendicularity, straightedge before welding. Visual and Back chip check Second side visual. Location, size and alignment of nozzles and other Openings R.F.Pads fitup / welding. PWHT of RF pad. Nozzles & manhole, etc. (As applicable) Radiography marking for Random radiography only Curbangle and Wind girders fitup / welding MPI/LPI nozzles, wind girders fitup/welding RF Pads air test. Shell to bottom fit-up Sheel to bottom I/S welding root run visual/ Oil chalk test Sheel to bottom O/S welding visual and LPI for toecracks Fabrication and erection of stairways Cleates welding for insulation Radiography interpretation. Extension marking for repair

Sheet 22

CONTRACTOR

PMC

WC WC

S S S

WC WC WC WC WC WC

HP S S HP W HP

WC WC WC WC WC WC WC WC WC WC WC WC

W S W HP W HP HP S S HP HP

FIXED ROOF 1 2

Identification of Roof Structure members in AFC drgs Blast cleaning and painting Roof Structure underside of Roof plates

WC WC

Rw S

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. 3 4 5 6 7 8 9 10 11 12

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sheet 23

ACTIVITY

CONTRACTOR

PMC

Location and welding of roof supports. Alignment and welding of Roof Structures. Plate layout, overlap and fitup Visual check of roof welds Location, size and alignment of roof manholes and vents PWHT (As applicable) RF pads fit-up & Welding RF pad pneumatic testing PT/MT of Nozzles, vents & other attachments Welding of Roof plate with shell / curb angle FLOATING ROOF Temporary staging spacing and levels Plate size, straightening and cutting Plate layout, overlap and fitup/ welding Buoys fabrications Vacuum testing of roof-plate welds Location of sleeve supports Pad plate welding with roof and sleeve support Fixing and welding of Buoys Initial – lift Supports fixing through sleeves Seal welding of support sleeves from beneath after dewatering Air test of Buoys Pontoon welding Location, fixing and welding of man holes, drains etc. Shell to pontoon clearance Seal fixing

WC WC WC WC WC

S W S W S

WC WC WC WC

HP W W W

WC

W

WC WC WC WC WC WC WC WC

S S S S HP W W

WC WC WC WC

S W S W

WC WC WC

HP W S

WC W

W W

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. C

Sheet 24

ACTIVITY

CONTRACTOR

Correctness of testing arrangements especially size of blind flanges/ vents/ drains/ temporary piping

WC

2

Mechanical / Inspection clearances

WC

HP

3

Earthing of ladder and shell

WC

W

4

Settlement readings during water filling

WC

W

5

Hammer test

WC

HP

6

Air pressure test

WC

HP

7

Vacuum test

WC

HP

8

Roof collapsability test in case of floating roof tanks

WC

HP

9

Calibration of tanks in case of floating roof tanks

WC

Rw

D

PAINTING AND INSULATION

1

Cleaning

WC

S

2

Painting

WC

W

3

Insulation

WC

W

HP

Rw

1

PMC

TESTING S

Inspection & Test Documents Review Test and Inspection Documents

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. IV 1

ACTIVITY

Sheet 25

CONTRACTOR

IV V VI VII

EQUIPMENT ERECTION (STATIC) BEFORE ERECTION Execution scheme Materials supply Readiness of erection Level of foundation (shims/ packing with marking to be prepared & kept ready) No. & Size of bolts Hole dia and no. of hole in base/ structure of equipment and columns Equipment base with actual foundation Checking the threads of bolts & nuts Chipping & roughening of foundation C/L marking on equipment

2

ERECTION SCHEMES FOR CRITICAL EQUIPMENTS

A B C I II III

PMC

WC WC WC WC

Rw W S S

WC WC

S S

WC WC WC WC

S S S S

WC

HP

WC

W

WC

S

DURING ERECTION A Orientation to be checked

WC

S

B Placement of packing as per marking

WC

S

C Outside cleaning, coating/ wrapping, painting for underground equipment

WC

W

A Approval of Rigging procedure (As per Annexure – 1) 3

SAFETY TEST A Load test of cranes, lifting beams, slings and shackles, length and dia. of sling & condition of wire rope (Broken/ damaged – strands should not be there) Cross checking if Data-sheet w.r.t. 4 orientation, base plate Deatails 5

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. 6

ACTIVITY

Sheet 26

CONTRACTOR

PMC

AFTER ERECTION

A

Tightening of Bolts and providing washers

WC

S

B

Levelling and alignment of equipments

WC

HP

C

Corresponding requirement elevation and distance between nozzles in special cases

WC

S

D

Cleaning of sleeves before grouting

WC

S

E

Grouting

WC

S

F

Final tightening of bolts

WC

S

G

Internals installation after PMI as required i. Critical equipments

WC

HP

ii. Other equipments

WC

W

As per specification

WC

W

8

Packing of column (As per Annexure – 2)

WC

W

9

Final Boxing up

WC

W

HP

Rw

7

TESTS

Inspection & Test Documents Review Test and Inspection Documents

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO.

ACTIVITY

Sheet 27

CONTRACTOR

PMC

ERECTION SCHEME FOR CRITICAL EQUIPMENT (Rigging Procedure)

1

BEFORE ERECTION A Checking proper sequence for lifting of the equipment B To check weight of equipment C To check the centre of gravity D To check suspension points E To check the maximum/ minimum radius at which the lifting tackle will operate F To check the maximum load to be lifted including wt. Of slings, hook-block, lifting beams and equipment etc. G To identify the safe crane with requisite capacity

2 A B C D E F G H I J

DURING ERECTION To check counter weight of crane and Boomlength To check slew limitations of crane To check ground conditions are adequate for supporting fully rigged crane and load To check the crane can be travelled in loaded condition To check clearances from overhead electric power cables To check maintenance certificates To check whether operators, riggers have received proper instructions To verify safe load indicator been supplied to rig the crane To check the adequacy of bracing of equipment by guys To check the guys, shoring, bracing, interference with other works

WC

Rw

WC WC WC WC

Rw Rw Rw Rw

WC

Rw

WC

Rw

WC

Rw

WC WC

Rw Rw

WC

Rw

WC

Rw

WC WC

Rw Rw

WC

Rw

WC

Rw

WC

Rw

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO.

ACTIVITY

Sheet 28

CONTRACTOR

PMC

WC

S

A Degreasing and cleaning of packing material

WC

S

B Check packing su pport plate C Check for stacked or dumped packing as per

WC

S

WC

S

WC

S

WC

S

PACKING COLUMN 1

BEFORE INSTALLATION A Identify the material, check thickness, dimensions, no. and angle of fingers of packing rings

2

DURING INSTALLATION

Specifications D Check for nesting E Check for packings are touching bed limiter (when issued and top level)

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO.

ACTIVITY

V 1 A B I II

EQUIPMENT ERECTION (ROTARY) BEFORE ERECTION Execution scheme Foundation check Level / centreline of foundation No / Dia / Length of anchor bolts, Depth of pockets, verticality of pockets III Chipping, roughing and cleaning of pockets

2

3

LIFTING TACKLES Crane/beams/ slings/ shackles etc. to be checked for weight of equipments

Sheet 29

CONTRACTOR

PMC

WC

Rw

WC WC

S S

WC

W

WC

S

VISUAL INSPECTION OF EQPTS. TAG/ IDENTIFICATION NO. WC A For any damage Free shaft rotation B WC

4

A B C D E F G H

S S

Drilling and Tapping (if reqd.) hole in the base plate of eqpt. a. Size/ Taps

WC

S

DURING ERECTION Level/ elevation of base frame All foundation bolts to be checked Grouting of base frame / pocket grouting Orientation of eqpts. Elevation/ Level of eqpts. Shimsize/ material/ thickness Distance between couplings No-load run of motors

WC WC WC WC WC WC WC WC

W S W W HP W W W

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO.

ACTIVITY I Alignment readings

Sheet 30

CONTRACTOR

PMC

WC

- Without piping (Loose bolts)

WC

HP

- With piping (After tightening the flange bolt)

WC

HP

WC

S

WC

S

WC

S

WC

S

WC

S

D Tests as per spec. E Chemical Cleaning of equipments parts / connected piping F Boxing up of equipment 7 connection piping

WC

W

WC

S

WC

S

G Log book maintenance (For rotating of shaft, lubrication Oil reservoir full, all plugs in

WC

S

WC

W

WC

W

HP

Rw

J Type of grout and grouting K All protection and safety guards installation

AFTER ERECTION A Curing of grout B Auxiliary connections to be mounted on eqpts. as per drawing C Final tighting of bolts

positions) H No load run of Motor I Recoupling of motor & reconfirmation of alighnment INSPECTION & TEST DOCUMENTS Review test and Inspection documents

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. VI 1 A B C I II III 2 A B 3 A B 4

5

ACTIVITY

Sheet 31

CONTRACTOR

PMC

WC WC

Rw W

WC

S

WC

S

WC WC

S S

WC

S

WC

S

WC

S

WC WC WC

W W W

LOAD TEST A. Winding & unwinding test B. Traversing test C. Travelling test D. Load & Over load testing E. Deflection of girder

WC WC WC WC WC

W W W W W

INSPECTION & TEST DOCUMENTS Review test and Inspection Documents

HP

Rw

CRANE (EOT/ HOT) BEFORE ERECTION Execution scheme Materials supply (contractor) Readiness for erection Structural steel girder span centre to centre and elevation Difference Check centre to centre distance of rails, gaps, elevations, crab wheels distances Check buffer stops Erection and assembly of components like LT, Crane Girders, Crab, Platforms, etc. Review of hoist ropes and assembly of hook blocks Electrical installation, testing and no load test of motor Coupling of motors to drives NO LOAD TEST A. Winding & unwinding test B. Traversing test C. Travelling test

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. VII

ACTIVITY

Sheet 32

CONTRACTOR

PMC

WC

HP

a) Manufacture’s Test Certificate

WC

Rw

b) Testing, If any

WC

S*

c) Positive Material Identification

WC*

Rw

3

Fabricated materials receipt

WC

Rw

4

Level check on TSRs

WC

S

5

Check for down corner clearance and Tray

WC

S

6

clearance Distance between TSRs

WC

S

B

After Installation

INSTALLATION OF COLOUMS INTERNALS

A

Before Installation

1

Avalable of Venders representatives at site

2

Material Inspection

Check for 1

Exit weir height

WC

S

2

UDFC

WC

S

3

Tightness of bolts

WC

S

4

Orientation and tightness of clamps

WC

S

5

Provision of lock nuts / seal pates

WC

S

6

Correctness of installation of shimming / bolting for top down corner

WC

S

7

Correctness of gasketing (if any)

WC

S

8

Tray to tray distance and level of tray

WC

S

9

Leak testing of seal pans as applicable

WC

HP

10

Damaged, missing valves and valve movement

WC

S

for valve trays 11

Fitting of proper valve combination

WC

S

12

Damage to deck components

WC

S

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

Sheet 33

13

Level and alignment of inlet weir and exit weir

WC

S

14

WC

S

15

Check for slots on tray components to be fully covered Gaps at down corner ends

WC

S

16

Removal of temporary plugs after testing

WC

S

17

Cleaning of all trays & inside of equipment

WC

S

Certification

Vendor’s

WC

HP

representative and operation groups of PMC / Owner Final boxing up and intertisation, if any

WC

Rw

HP

Rw

18 19

of

installation

by

INSPECTION & TEST DOCUMENTS Review test and Inspection documents

NOTE:-

All activities pertaining to material receipt, identification. Pre installation checks checks and installation to be carried out in the presence of Vendor’s representative and duly certified and documented for submission as final document.

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. I

ACTIVITY

Sheet 34

CONTRACTOR

PMC

FIRED HEATERS (FABRICATION & ERECTION

A

PRIOR TO FABRICATION

1

Material Inspection a) Manufacturing Test Certificate

WC

Rw

b) Testing, if any

WC

S

c) Positive Material Identification for Alloy Steel & Stainless Steel material by alloy

WC

S*/RW

analyzer 2

WPS / PQR

WC

HP

3

Welder’s Performance

WC

HP

4

Welding Consumable

WC

HP

5

a) NDT Procedure Qualification

WC

HP

b) PWHT Procedure Qualification

WC

HP

6

Availability of AFC drawing (Reviewed by PMC)

WC

S

7

Joint Numbering for coils / pressure parts

WC

S/Rw

8

Structural member’s identification

WC

S/Rw

9

Layout Checking

WC

S/Rw

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. B

ACTIVITY

Sheet 35

CONTRACTOR

PMC

FABRICATION STEEL WORKS

1

Materials as per AFC drawing

WC

S

2

Dimensional check

WC

S

3

Fit-up check

WC

S

4

Weld Visual Inspection

WC

S

5

Radiography as Applicable a) RT Marking (for random radiography only)

WC

HP

b) RT Interpretation

WC

HP

6

Completion of structures as per AFC drawings

WC

HP

7

Surface cleaning for primer painting

WC

S

8

Primer Coating as applicable

COIL WORK 1

Edge Preparation

WC

S

2

Fit-up of joints

WC

S

3

Weld Visual Inspection

WC

S

4

PT/MT Check as required

WC

S/Rw

5

PWHT & Hardness check as applicable

WC

S/Rw

6

a) RT Marking (for random radiography only)

WC

HP

b) RT Inspection

WC

HP

7

Check Short for Radiography

WC

HP

8

Clearance for Hydro testing

WC

HP

9

Hydro testing

WC

HP

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. C

ACTIVITY

Sheet 36

CONTRACTOR

PMC

ERECTION

1

Foundation check as per AFC drawing

WC

Rw

2

Lifting arrangements

WC

Rw

3

Test certificates for lifting tools and tackles

WC

Rw

4

Lifting of radiant section columns

WC

S

5

Bottom plate fit-up & welding

WC

S

6

Radiant shell course fit-up and welding

WC

S

7

Weld visual inspection

WC

S

8

Radiography as required

WC

HP

9

Cutout for burners in bottom / shell plate a) Marking

WC

HP

b) Cutting

WC

S

10

Coil erection in Radiant section

WC

S

11

Erection of convection box & APH with all sheet work & tube Supports a) Erection Procedure

WC

HP

b) Erection

WC

S

12

Check Shot for radiography for coil field joints

WC

W

13

Clearance for Hydro test

WC

HP

14

Hydro test field joints

WC

HP

15

Erection fit-up & welding of stack a) Erection Procedure

WC

HP

b) Erection

WC

S

16

Erection fit-up & Welding of ducts

WC

S

17

Radiography as required a) RT Marking

WC

HP

b) RT Interpretation

WC

HP

18

FD & ID

19

Installation of soot blowers

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

20

a) Marking

WC

HP

b) Erection

WC

S

WC

S

WC

Rw

Erection of all Platforms, ladders, Hand rails & miscellaneous structures

21

Sheet 37

Final Painting

INSPECTION & TEST DOCUMENTS Review Test And Inspection Document

Abbreviations: NDT

: Non Destructive Testing

WPS

: Welding Procedure Specifications

RT

: Radiography Testing

PT

:

MT

: Magnetic Particle Testing

PWHT

:

Penetrant Testing

Post Weld Heat Treatment

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. II

ACTIVITY

Sheet 38

CONTRACTOR

PMC

REFRACTORY & INSULATION WORKS (HEATERS)

A

RADIANT SECTION

1

Radiant shell Fixing of Ceramic fiber blanket / I.



Manufacturing Test Certificate

WC

Rw



Testing, if any

WC

S

Clearance for hot work

WC*

HP

III.

Marking of studs

WC

S

IV.

Welding of studs with approved PS&PQR

WC

S

Surface Cleaning

WC

S

VI.

Check for individual layers of ceramic fiber blankets and SS foils

WC

W

VII.

Check for overlap of ceramic blanket

WC

S

VIII.

Fixing of speed fix washer and cup lock

WC

S

Cleaning and final inspection

WC

HP

II.

V.

IX. 2

Material Inspection

Arch Plate I.

Material Inspection 

Manufacturing Test Certificate

WC

Rw



Testing, if any

WC

S

Clearance for hot work

WC*

HP

III.

Marking of studs / anchors

WC

S

IV.

Welding of studs / anchors with approved PS&PQR

WC

S

Surface Cleaning

WC

S

VI.

Check for individual layers of ceramic fiber Blankets (CFB) modules and SS foils

WC

S

VII.

Check for overlap of CFB and modules

WC

S

II.

V.

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

VIII. 3

Cleaning and final inspection

Sheet 39

WC

HP

Floor Plate Laying of castable / fire bricks I.

Material Inspection 

Manufacturing Test Certificate

WC

Rw



Testing, if any

WC

S

Clearance for hot work

WC

HP

III.

Surface Cleaning

WC

S

IV.

Check Shelf life prior to application

WC

HP

Check for undulations on floor

WC

S

Check for castable mix

WC

W

Check for proper compaction

WC

S

Check for thickness of castable

WC

S

IX.

Curing

WC

S

X.

Cleaning after laying of castable

WC

S

XI.

Check for cracks and repair

WC

W

XII.

Fixing of tar paper, If applicable

WC

S

XIII.

Cleaning and final inspection

WC

HP

II.

V. VI. VII. VIII.

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO. II

ACTIVITY

Sheet 40

CONTRACTOR

PMC

REFRACTORY & INSULATION WORKS (HEATERS)

B

CONECTION SECTION

1

Convection Walls Laying of castable I.



Manufacturing Test Certificate

WC

Rw



Testing, if any

WC

S

Clearance for hot work

WC*

HP

III.

Marking of studs / anchors

WC

S

IV.

Welding of studs / anchors with approved PS&PQR

WC

S

Surface Cleaning

WC

W

VI.

Check for undulations on wall

WC

S

VII.

Check for castable mixing

WC

W

VIII.

Check for proper compaction

WC

S

IX.

Check for thickness of castable

WC

S

X.

curing

WC

S

XI.

Cleaning after laying of castable

WC

S

XII.

Check for cracks and repair

WC

W

XIII.

Cleaning and final inspection

WC

HP

II.

V.

2

Material Inspection

End tubesheets Laying of Castable i.

Material Inspection 

Manufacturing Test Certificate

WC

Rw



Testing, if any

WC

S

ii.

Clearance for hot work

WC

HP

iii.

Marking of studs / anchors

WC

S

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

3

Sheet 41

iv.

Welding of studs / anchors with approved PS&PQR

WC

S

v.

Surface Cleaning

WC

S

vi.

Check for castable mixing

WC

W

vii.

Check for proper compaction

WC

S

viii.

Check for thickness of castable

WC

S

ix.

curing

WC

S

x.

Cleaning after laying of castable

WC

S

xi.

Check for cracks and repair

WC

W

xii.

Cleaning and final inspection

WC

HP

Breeching Plate Laying of castable I.

Material Inspection 

Manufacturing Test Certificate

WC

Rw



Testing, if any

WC

S

Clearance for hot work

WC*

HP

III.

Marking of studs / anchors

WC

S

IV.

Welding of studs / anchors with approved PS&PQR

WC

S

Surface Cleaning

WC

S

VI.

Check for undulations on plate

WC

S

VII.

Check for castable mixing

WC

W

VIII.

Check for proper compaction

WC

S

IX.

Check for thickness of castable

WC

S

X.

curing

WC

S

XI.

Cleaning after laying of castable

WC

S

XII.

Check for cracks and repair

WC

W

XIII.

Cleaning and final inspection

WC

HP

II.

V.

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

4

Sheet 42

Header box Laying of castable i.

Material Inspection 

Manufacturing Test Certificate

WC

Rw



Testing, if any

WC

S

ii.

Clearance for hot work

WC*

HP

iii.

Marking of studs / anchors

WC

S

iv.

Welding of studs / anchors with approved

WC

S

PS&PQR v.

Surface Cleaning

WC

S

vi.

Check for undulations on box

WC

S

vii.

Check for castable mixing

WC

W

viii.

Check for proper compaction

WC

S

ix.

Check for thickness of castable

WC

S

x.

curing

WC

S

xi.

Cleaning after laying of castable

WC

S

xii.

Check for cracks and repair

WC

W

xiii.

Cleaning and final inspection

WC

HP

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO.

ACTIVITY

II C

Sheet 43

CONTRACTOR

PMC

REFRACTORY & INSULATION WORKS (HEATERS) STACK Laying of castable I.

Material Inspection 

Manufacturing Test Certificate

WC

Rw



Testing, if any

WC

S

Clearance for hot work

WC*

HP

III.

Marking of studs / anchors

WC

S

IV.

Welding of studs / anchors with approved

WC

S

Surface Cleaning

WC

S

VI.

Check for undulations on stack shell

WC

S

VII.

Check for castable mixing

WC

W

VIII.

Check for proper compaction

WC

S

IX.

Check for thickness of castable

WC

S

X.

curing

WC

S

XI.

Cleaning after laying of castable

WC

S

XII.

Check for cracks and repair

WC

W

XIII.

Cleaning and final inspection

WC

HP

II.

PS&PQR V.

INDICATIVE INSPECTION & TEST PLAN

HPCL, Visakh

TOYO ENGINEERING INDIA LTD.

ISSUED :01.06.2009

JOB NO. : 6261

DOC.No. 6261-CD-303

DHT PROJECT

SL. NO.

ACTIVITY

II D

CONTRACTOR

PMC

REFRACTORY & INSULATION WORKS (HEATERS) HOT AIR DUCT I.

Material Inspection 

Manufacturing Test Certificate

WC

Rw



Testing, if any

WC

S

Clearance for insulation

WC

HP

III.

External Surface cleaning

WC

S

IV.

Provide spacer ring / anchors

WC

S

Check for thickness of the mineral wool insulation

WC

S

VI.

Check for staggering of joints in insulation

WC

S

VII.

Check for providing expansion joints

WC

W

VIII.

Overlapping of metal sheet as per specification Overlap on joints for aluminium sheets as per specifications

WC

S

WC

S

WC

S

WC

HP

WC

Rw

II.

V.

IX. X. E

Sheet 44

Sealing alluminium sheets

Final Inspection & Acceptance

INSPECTION & TEST DOCUMENTS Review Test and Inspection Documents