001-Sample Method Statement Piping Shutdown
Short Description
Method Statement...
Description
Page Pag e 1 of 10 Reference No:
MS-0229
METHOD STATEMENT Purp Purpos ose: e: This method statement is made to describe the sequence of activities involved for removal of Cladding / insulation , removal of tubing / instruments instruments / gauges , demolition of lines PR2341 4!" , PR234242" PR234242" , PR23#042" , PR244$1%" , &'2$011" , erection of ne( lines lines PR222) PR222) #4"/4!"/44"/20"/2" , PR24!01%" , PR223342" , PR22%!2" , &'22221%" , &'22231" , *+221#%" , erection erection of ie suorts suorts , (elding , touchu ainting ainting , -&. installation installation of insulation / cladding
Proce Pro cedu dure re The follo(ing stes should be taen to eecute the mentioned tas
Identification & Color Coding Coding of Piping to be replaced
The lines mared on attached isometrics (ill be surveed at site (ill be identified for maring The follo(ing is the scheme 5or Redundant items •
6ello(
•
5or Reuse items
'lue
•
5or Cut Points
Red
7 tag mentioning the isometric no, P 8& no tiein no (ill be hanged on tiein oint
Erection of Scaffolding Scaffolding
7fter identification identification scaffolding (ill be built on the location as sho(n in 9ob Card -o *caffolding (ill be utili:ed unless it is tagged ;;*75. 5+
#ismantle 2f 3lange " Spacer SR!P-),-)'( & 'M2*,4. at tie-in T/', •
Cutting of &+23$$2" from PR23414!" unbolting from valve , manuall hoisting shifted the redundant material to (aste area as mentioned b >+
#emolition of '%- #1''(# •
Page 3 of 10 Cutting of PR23412" from PR23414!" unbolting from valve , manuall hoisting shifted the redundant material to (aste area as mentioned b >+
@ar the cutting location on eisting line PR234242" as er isometric P1PR 2342& Rev01 *h 3/3 'efore cutting of sool F1 at oints 2 1 T0%)D , the eisting line must be suorted b temorar suort Gold the sool F 1 aro Et20!0 BgD (ith crane and start cutting (ith cold cutting @/C at oints 1 2 , lift u the sool lo(er do(n on tailor Gold the sool F 2 aro Et2%$1 BgD (ith crane and start cutting (ith cold cutting @/C at oint 3 , unbolting the dumm suort from foundation , lift u the sool lo(er do(n on tailor Gold the sool F3 aro Et3)$% BgD (ith crane and start cutting (ith cold cutting @/C at oint 4 from PR23#042", unbolting the suort from foundation , lift u the sool , lo(er do(n on tailor shifted the redundant material to (aste area as mentioned b >+
#emolition of .'%-PR-'4) ! #ismantling 2f 525 S6AM C7EC8 *A6*E 9SP-',$4: from T-/(0 •
@ar the cutting location on eisting line PR23#042" as er isometric P1PR 23#0& Rev00 *h 1/1
•
•
•
•
#emolition of .0%-PR-'.$ ! #ismantling 2f 3E-,( from T-/$, •
•
•
•
•
•
•
Page 4 of 10 Gold the sool F 1 aro Et1)0! BgD (ith crane and start unbolting from *P2%1# , lift u the sool lo(er do(n on tailor Gold the valve *P2%1# reusedD (ith crane and start unbolting from *PF2 , lift u the sool lo(er do(n on tailor Gold the sool F 2 aro Et2%$0 BgD (ith crane and start cutting (ith cold cutting @/C at oint 1 , lift u the sool , lo(er do(n on tailor Gold the sool F 3 aro Et2110 BgD (ith crane and start cutting (ith cold cutting @/C at oint 2 from PR23414!" after clearance from ne( ie *TR , lift u the sool , lo(er do(n on tailor and shifted the redundant material to (aste area as mentioned b >+
@ar the cutting location on eisting line PR23414!" as er isometric P1PR 2341& Rev00 *h 2/# Gold the sool F 1 aro Et400 BgD (ith crane and start cutting (ith cold cutting @/C at oint 1 on PR23414!" after clearance from above concrete *TR , lift u the sool , lo(er do(n on tailor Gold the sool F 2 including 5.%3$ reusedD (ith crane and start cutting (ith cold cutting @/C at oint 2 on PR23414!" unbolting the suort from foundation after clearance from above concrete *TR , lift u the sool , lo(er do(n on tailor 'efore cutting of sool F 3 from sool F 4 , sool F 4 must be suorted b temorar suort Gold the sool F 3 aro Et23!3 BgD (ith crane and start cutting (ith cold cutting @/C at oint 3 on PR23414!" , unbolting the dumm suort from foundation after clearance from above concrete *TR , lift u the sool , lo(er do(n on tailor Goo u the *P F 4 aro Et23!3 BgD (ith chain bloc on above concrete *TR start unbolting , lift the sool u insert 2 -+
#emolition of .0%-PR-'.$ 3rom )' 8-),). •
•
• •
• •
@ar the cutting location on eisting line PR23414!" as er isometric P1PR 2341& Rev00 *h 1/# Cutting of the sool F 1 aro Et3000 BgD (ith cold cutting @/C at oint 1 on PR2341 4!" unbolting the suorts from foundation/unbolting of steel girder from concrete colums , after that 2-+
.rection / fit u of sool $#"/ #" for 2P&T%3# T)32D / 2PT%!0 / 2PT%40 T)4!D / 2P+%142 on couling (ith PR222) *h 4/) Rev0152D at 5E23,2#,2% 2$ Perform necessar -&. requirements of these 9oint , as 5E23,2#,2% 2$
Connect 5e; 6ine PR'''/-4.%!.0%