FIELD CONSTRUCTION MANUAL GeN2 Comfort GENERAL INFORMATION
Ref.: Number: MA-A24Ev17 Page: 2 Date: DECEMBER 2008 Supersedes: OCTOBER 2008
CARDINAL SAFETY RULES
Verification and distribution of materials
M-A23Ev6
Landing entrances
M-C165Ev5
Starting up and handover to maintenance
A-A15Ev14
ALWAYS use platforms and scaffolds, fixed or movable, which comply with the established safety requirements. ALWAYS use the fall protection equipment whenever there is a fall hazard. ALWAYS “LOCK-OUT/TAG-OUT” the main switch when the power supply is not required for the work to be done. NEVER work in the proximity of moving parts or unprotected electrical components. ALWAYS put the elevator on inspection when working on top of the car (prior to access, whilst on top of the car and when exiting). NEVER travel on top of the car at the rated speed. ALWAYS put the elevator on inspection when working in the elevator pit (prior to access, whilst in the pit and when exiting). ALWAYS follow the correct procedure for using temporary shunts whenever they are necessary. ALWAYS follow the correct procedures for hoisting and suspending loads.
FIELD CONSTRUCTION MANUAL
OTIS
GeN2 Comfort GENERAL INFORMATION
Ref.: Number: MA-A24Ev17 Page: 3 Date: NOVEMBER 2008 Supersedes: MARCH 2008
SEQUENCE OF FIELD CONSTRUCTION PHASES Order
Task description
Code
1
Job site preparation
M-A9E
2
Verification and distribution of materials
M-A23E
3
Lifting tools
M-U12E
4
Hoisting rails
M-C22E
5
Hoistway
M-A70E
6
Installation of car frame and platform
7 8 9
TOOLS DESCRIPTION
CODE
GeN2 Comfort installation equipment
L -1 05 93 -2
M-C45E
Electric winch
L-10548-10 / L-10547
Hoisting car frame and machine
M-A301E
Audiovisual alarm
L -1 55 01 -1
Installation of the machine
M-A302E
Equipment on the top floor
M-A303E
La dd e r
L- 01 5 06 -9
Jobsite auxiliary equipment (optional)
L-10526-50
Laser (optional)
L -0 10 22 -1
measurements
10
Connections for inspection operation
M-S16E
11
Installation of traction belts
M-C82E
12
Fixing guide rails
M-C600E
13
Adjusting guide rails
M-C99E
14
Landing entrances
M-C165E
15
Hoistway wiring and equipment
M-C191E
16
Car panels and decorative parts
M-C220E
17
Car doors and columns
M-C247E
18
Car wiring
M-C260E
19
Position Reference System - Prima TL
A-C48E
20
Position Reference System - Not Prima TL
A-C49E
21
Adjusting landing locks
A-C19E
Lifting equipment
Maximum Maximum 1:1 1: 1 lifting load
Maximum hoistway rise for lifting 2 rows of rails
Maximum hoistway rise for lifting 1 row of rails
22
Starting up and handover to maintenance
A-A15E
TIRAK X500
50 0 Kg.
25 m.
50 m.
MINIFOR TR30
30 0 Kg.
15 m.
30 m.
Annex "Starting up and handover to maintenance" A -A -A 11 11 0E 0E
A NN NNE X 11
S TA TA RT RT IN IN G UP PA PA X DO OR OR OP OP ER ERA TO TO R W IT IT H T ES ES T T OO OOL
A -A -A 11 111E
A NN NNE X 12
SPECIAL OPERATIONS:
A -A -A 11 112E
A NN NNE X 13
TABLE OF OF LO LOADS FO FOR HA HANDOVER TE TESTS
A -A -A 11 113E
A NN NNE X 14
PUTTING COBI 8128 INTO SERVICE
A -A -A 11 11 4E 4E
A NN NNE X 15
P UT UT TI TIN G RE M5 M5 -L -LD (R MH MH) IN TO TO S ER ERV IC ICE
A -A -A 11 115E
A NN NNE X 16
STARTING UP SSM4 SYNTHESIZER
A-A1 AA116 16E E
ANNE AN NEX X 17
ADJU AD JUST STME MENT NT OF TH THE E RB RBII
A -A 119E
A NNE X 20
RELEASING G eN eN2-COMFORT C AR AR
E PO PO
/
E FO FO
(BEL (B ELT T IN INSP SPEC ECTI TION ON DE DEVI VICE CE))
The equipment L-10583-5 (M99) can be used with the additional set of tools L-10593-10
LIMITS OF HOISTING EQUIPMENT FOR LIFTING RAILS
FIELD CONSTRUCTION MANUAL
OTIS
GeN2 Comfort GENERAL INFORMATION
Ref.: Number: MA-A24Ev17 Page: 4 Date: FEBRUARY 2008 Supersedes:NOVEMBER Supersedes: NOVEMBER 2007
ADDITIONAL TOOLS REQUIRED FOR INSTALLING GEN2 COMFORT MODELS WITH THE SET OF TOOLS FOR OTIS 2000 VF-MRL (M99) L-10583-5