0 - Deliverable Document List (27-Jul-19)

February 15, 2023 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download 0 - Deliverable Document List (27-Jul-19)...

Description

 

 

DESIGN DELIVERABLE DOCUMENTS LIST The Client:

VIETNAM JAPAN GAS JSC

Project:

LONG SON METERING STATION & U/G PIPING

Item:

PIPING, CIVIL, E&I DESIGN PACKAGE

No.

Document name

Doc. No.: Rev.:

Scope

Document number   VJG 190009-02-GE-QC190009-02-GE-QC190009-02-GE-QC-

001 002 003

190009-02-PP-DW-

004

190009-02-PP-DW-

005-xxx

7 8

Technical documents list Project Execution Plan Project Quality ity Plan lan Process Flow Diagram (PFD) Piping and instrument diagram (P&ID) One spool drawing (ISOmetric dwg: Pipeline + Metering station) MTO (Pipe + Metering Station + E&I) Painting specification/ procedure

190009-02-PP-MC190009-02-PP-SP-

006 007

9

Specification for pipeline

190009-02-PP-SP-

008

10 11 12 13 14 15 16

Data sheet fo for p piipe (U/G & Metering station) RT P Prrocedure (B (By Authorised Ca Caompany) Inspection & Test Plan (ITP) Welding procedure specification Proj oje ect Co Coo ord rdin ina ation ion Proc rocedure dure Detailing En Engineering De Design Sc Schedule Engi Engine neer erin ing g Ma Mast ster er Do Docu cume ment nt Re Regi gist ster er

190009-02-PP-DS190009-02-PP-SP190009-02-PP-SP190009-02-PP-SP1900 900099-0 02-P -PP P-S -SP P190009-02-PP-MS1900 190009 09-0 -022-PP PP-M -MSS-

009 010 011 012 013 014 015 015

190009-02-PP-SP190009-02-PP-DW190009-02-PP-DW190009-02-PP-DC-

016 017 018 019

6

IEV

JPS

Plan

 Đại hỗ trợ reviw reviw

General

1 2 3 4 5

Review

Rev.0

??? Thân  Đạinc  

19-Jul-19 19-Jul-19 19-Jul-19



✓  



 



 



 



 



 



 



 



Lai Lưỡng Lưỡng

Actual

190009-01-PP-DS-000 00

Rev.1 Status

Plan

Actual

Remark Status

thấy lạ lạ chưa biêt làm thế nào

16-Jul-19

Chèn template vào U/G Pipe chưa triển khai vì chưa có tọa độ

23-Jul-19 23-Jul-19 23-Jul-19

 Đã có size ống ==> ==> chèn template vào Template chung. Yêu cầu Cty Thứ 3 nộp

16-Jul-19 16-Jul-19 23-Jul-19 23-Jul-19 23-Jul-19 23-Jul-19 23-Jul-19 23-Jul-19

Underground pipeline

1 2 3 4 5

Pipeline process Philosophy Piping route drawing Detail pipeline crossing drawing Pipeline alignment sheet Pipeline d da atasheet

6 7

Pipeline MTO Pipeline analasys Pipeline roping bend calculation report (Tính độ cong của ống)

8

 

✓  



 



 



 



 



190009-03-PP-DC-

020

190009-03-PP-DC-

021

9

Pipeline wall thickness calculation report

190009-03-PP-DC-

022

10

190009-03-PP-DC-

023

11

Pipeline weight concrete coating - boyancy calculation report (For across marsh if any) Pipeline gas sizing

190009-03-PP-DC-

024

12 13

Cathodic pr protection sy system ca calculation Datasheet for cathodic protection system

190009-03-PP-DC190009-02-PP-DS-

025 026

14

Anti Anti co corr rros osio ion na and nd fiel field d join jointt co coat atin ing g sp spec ecif ific icat atio ion n 1900 190009 09-0 -022-PP PP-S -SPP-

15

Cathodic protection ssyystem drawing

190009-02-PP-DW-

 



16-Jul-19 23-Jul-19 23-Jul-19 23-Jul-19 16-Jul-19 23-Jul-19 11-Jul-19

Không cần thiết cho giai đoạn này HOLD

Bản vẽ typical mặt cắt ngang HOLD

11-Jul-19

IEV checking

18-Jul-19  



11-Jul-19

11-Jul-19

IEV checking

11-Jul-19

11-Jul-19

IEV checking

11-Jul-19

IEV checking

18-Jul-19  



 



 



11-Jul-19 16-Jul-19

027 027

 



16-Jul-19

028

 



16-Jul-19

1/2

Tạm tính chiều dài ống là 2km và đi đường thẳng Sử dụng chung với Metering station Có không theo bản đồ vệ tinh

 

No. 16

Document name

Construction Method Statements for Underground Piping

Scope

Document number   190009-02-PP-MOS- 029

Rev.0 Lai

Rev.1

Remark

23-Jul-19

Metering station

Pipe size calculation for Metering Station Filter size calculation PSV size calculation Foundation plan/ building plan Concrete slab detail Rebar concrete detail Piping arrangement layout Pipe support detail drawing 3D view Metering station datasheet (Valve + Instrument: PG; PDT; PT; FIT; PZV + Electrical)

190009-02-PP-DC190009-02-PP-DC190009-02-PP-DC190009-02-CV-DW190009-02-CV-DW190009-02-CV-DW190009-02-PP-DW190009-02-PP-DW190009-02-PP-DW-

030 031 032 033 034 035 036 037 038

 



 



 



16-Jul-19 16-Jul-19 11-Jul-19 23-Jul-19 23-Jul-19 23-Jul-19 23-Jul-19 23-Jul-19 23-Jul-19

190009-02-PP-DS-

039

 



16-Jul-19

1 2 3 4

Instrument & Control General Specification Single line diagram Layout of cable tray Plot plan of equipment

190009-02-EE-SP190009-02-EE-DW190009-02-EE-DW190009-02-EE-DW-

040 041 042 043

 



5 6

Layout of air piping and analyzer tubing plan Layout of instrument/ equipment wiring plan

190009-02-EE-DW190009-02-EE-DW-

044 045

7

In Inst stru rume ment nt data datash shee eets ts (P (PG; G; PD PDT T; PT PT; FI FIT T; PZV PZV))

8

E&I MTO (Equipment, cable, cable tray tray,,  cable gland…) Typical instrument hook-up drawing

1 2 3 4 5 6 7 8 9 10

 



 



 



Lưỡng Lưỡng Lưỡng

E&I

9

 

 



 



 



 



 



15-Jul-19



15-Jul-19



190009-02-EE-DW-

046

15-Jul-19 15-Jul-19 18-Jul-19 18-Jul-19 19-Jul-19 19-Jul-19

Thân

19-Jul-19

2/2

Sử dụng chung cho U/G pipelins 11-Jul-19

IEV checking