WDT V100R005C00SPC100 Propaganda Slides for Indosat
March 24, 2017 | Author: Ula Abdullah | Category: N/A
Short Description
wdt android...
Description
Part I Wireless Deployment Tool WDT Promotional Slides(V100R005C00SPC100) December 2014
Part I Wireless Deployment Tool WDT Promotional Slides Part II Wireless Deployment Tool WDT Operation Guide Slides
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Contents 1
Deployment Pain Points
2
Tool Introduction and Function Introduction
3
Effect Analysis and Presentation
4
Appendixes and Example Sites
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 2
1. Pain Points of Traditional Deployment Modes Transmission or the OSS is not ready. PNP is not supported. The progress is delayed.
Complex USB file making Files are easy to be placed in a wrong path. Faults are invisible.
其他原因 ; 5% RTWP 问题 ; 2% 天馈鸳鸯线 ; 18% 电调下倾角 ; 18%
Rework
传输问题 ; 15% 天馈接反 ; 42%
High skill requirements using laptop computers. The partner employee exchange is frequent. The skill transfer costs are high.
Complex and long acceptance report output Incorrect information collection, such as errors or missing
Problem analysis of second visits in a project
Case: Transmission and remote deployment conditions are not met at the earlier stage of a delivery project. To meet the deadline, 200 sites are installed. After sites go online later, only 50 sites are working properly and the other 150 sites have alarms, such as standing wave alarms, optical alarms related to no TX/RX optical modules, and low or high optical power alarms. Therefore, these 150 sites are handed over to the supervisor and subcontract to go to site multiple times by using laptop computers and professional construction tools. This wastes costs and delays the progress. HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 3
2. Introduction to Wireless Deployment Toolkit WDT WDT (Wireless Deployment Tool): Wireless deployment tool WDT is a Huawei-developed smart-phone application (WDT.apk) that focuses on deployment and acceptance scenarios. Integrated with expert systems, the WDT is easy to use and provides diverse functions to facilitate site deployment and maintenance. Hardware requirements: 1. Mainstream Android smartphones are supported: Configuration: Android 2.3+, CPU 1 GHz, 512 MB RAM, and 2 GB SD card 2. Common Wi-Fi APs are supported: Recommended: TP-LINK TL-MR12U Software requirements: WDT.apk (the size of the software package is 3 MB) Only a network cable, an AP, and a smartphone are required. All mainstream Android mobile phones are supported. All common APs are supported, which reduces costs and facilitates procurement.
ALL (USB flash drive, DT mobile phone, camera, GPS, barcode scanner, alarm board, paper, and pen among others) in ONE (smartphone) HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 4
WDT functions Script Software
One-click site deployment: Allows engineers to automatically log in to a base station, and then load the required software, scripts, and license file in one-click mode. The load process is visible. It takes 10 to 18 minutes to deploy a base station in one-click mode.
One-click site deployment
Note: Subcontractors do not need to load any functions. They can use the functions only by clicking the corresponding buttons. HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 5
One-click self-check:
WDT functions Android Terminal VSWR PIM Cross Feeder CPRI Rectify faults onsite.
After the installation is completed, engineers can click a specific button to perform GUIbased detection on engineering quality, such as the CPRI optical power, transmit optical power, cell status, clock status, transmission status, voltage standing wave ratio (VSWR), intermodulation, and single cross feeder connection. Engineers can click a specific button to transmit the detection results back to the OMC for review.
One-click self-check
This ensures that engineering quality problems are solved onsite, and frees the product team from frequent site visits.
Note: Subcontractors do not need to load any functions. They can use the functions only by clicking the corresponding buttons. HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 6
WDT functions Trans-link Auto Ping Auto TRACERT Trans error detect
One-click transmission fault location: Engineers can click a specific button to locate transmission faults, which is easy.
One-click transmission fault location
Note: Subcontractors do not need to load any functions. They can use the functions only by clicking the corresponding buttons. HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 7
WDT functions
Wizard-based photographing and one-click report generation: Subcontractors can achieve wizardbased photographing based on a customized list, thereby preventing some photographs from being missed. The WDT automatically takes photographs and renames and sorts the photographs.
One-click report generation
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Site reports or customized acceptance reports are generated in one-click mode.
Page 8
3. Detailed Functions of Wireless Deployment Toolkit WDT
Base Station Commissioning
Data Loading
WDT Functions 1. Software, configuration file, and license loading
Reduce skill requirements
1. Transmission link setup process and faults visibility
Reduce device quantities and
2. Ping and Tracert 3. Antenna detection (VSWR, intermodulation, and crossed pair connection)
Site Acceptance
costs Accelerate the project delivery progress
4. Cell, board, optical power, and GPS check 5. Alarm query
Locate the cause of a fault and
6. Operation log 1. Radio parameters, service verification, and site
solve the problem locally Reduce the time of second visits
navigation 2. Acceptance photo-taking 3. Acquisition of GPS data
to a site significantly Collect information correctly and efficiently
4. ESN scanning (sent by SMS) 5. Data uploading (sent by email)
Report Tool
Effect
Generate reports quickly and correctly
1. Operation replay 2. Automatic generation of acceptance reports
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 9
4. WDT Benefits . Customized Photographing and Automatic Repo rt Generation Integrated solution based on wireless deployment toolkit WDT and documentation preparation tool SID Photographing list customization The customization period is less than 30 minutes. 1. Customize a list for wizard-based photographing onsite by using the WDT.
Acceptance or survey documentation The customization period is less than one week.
Trans mit ph ot such ographs ba as em c ail, SM k through m S, or net dis ethods k.
Information is entered quickly.
Base station
SID used for documentation preparation
2. Contents that need to be entered: Record the contents on reused papers onsite (information entries are optimized).
OMC
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
3. Customize information that is required for automatically obtaining site acceptance information through the M2000.
HUAWEI Confidential
4.Enter other information according to specified rules.
Page 10
5. All collected information is automatically filled in a customized report.
5. Summary of Benefits Brought by Wireless Deployment Tool WDT Free the project team from frequent site visits
Ensure no site engineering installation faults before leaving sites
Four reasons to reduce costs
No requirement for the remote OSS
Replace multiple site visits by one visit.
Generate acceptance reports intelligently
Generate neat deployment reports intelligently based on the photo collection guide, alarm query, and status query functions of smart terminals. This saves a lot of report making time. Even if transmission is out of position, we dare to
Ensure the project progress
Reduce subcontractor skill requirements
install base stations. We can ensure no rework after the installation.
GUIs simplify the installation and operations. No user manual is required. Subcontractors can install base stations and user them immediately after the installation.
Replace manual reports by automatically generated reports. Replace laptop computers by smart terminals. Replace high skill requirements by low skill requirements.
Transmission faults are avoided, software commissioning engineers are no longer required, and the project team does not need to pay frequent site visits. This improves delivery efficiency, reduces the number of site visits, and ensures delivery progress. HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 11
Appendix 1 - Required Smartphones and Selecting Policies 1. The WDT software can be installed on all mobile phones of Android 2.3 to 4.4 produced by mainstream vendors. In areas where the Android phones are popular among subcontractors, subcontractors' Android phones can be used. 2. Delivery of smartphones will become the trend in the future. All fields of Huawei are developing mobile phone tools. Considering that mobile phones can be used for a long time, you are advised to purchase smartphones in batches based on the following selection policies: 1. The mobile phone functions in the delivery: site deployment and project quality self-check, service test, and reporting photo-taking. The site deployment and project quality self-check functions basically have no requirements on mobile phone performance. Mobile phones of Android 2.3 to 4.4 can be used. Android mobile phones bought on the Taobao with 200 RMB (exemption from postage) also support the WDT. 2. Service test requirements: If there are service test onsite requirements on the wireless side (Not a drive test for network optimization. Drive test tools for network optimization are checked and prepared by the network optimization side.): A. Preferred mobile phones support the modes and frequency bands required by the project, and mandatory feature tests, such as the CSFB and VoIP, which need to be checked by the wireless project owners. B. If lock screen is tested, the PHU and a third-party lock frequency software must be installed on the mobile phone at a time. You are advised to choose preferred phone models that support the software (You need to confirm with the Huawei PHU team or the third-party software personnel). 3. Photo-taking requirements: If customers have high quality requirements on photos, the mobile phone resolution must be no lower than 8 million. In addition, the mobile phone must support the autofocus and SD card functions (mainstream mobile phones in the market basically support the functions). Summary: If customers have dialing test requirements, mobile phones of specified models that support the dialing test function must be purchased. If there is no dialing test requirements, purchase Android mobile phones with a resolution no lower than 8 million that are easy to purchase at local area. Note: To ensure that the functions are stable, smuggled cell phones and pirated cell phones cannot be used. You are advised to use the Android mobile phones produced by global mainstream vendors, such as: Samsung, HTC, and Huawei (If some Android mobile phones cannot be compatible, please send the phone models and Android versions back to the WDT deployment contact person. Thank you!). HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 12
Appendix 2 - Recommended APs with Self-supplied Power and Convenient for Local Procurement3. AP Configuration Requirements 1. Recommended AP Lists (With self-supplied mobile power, it has no need for external power supply at the site.) ID
Model
Online Purchase Website Jingdong Mall: http://www.jd.com
1 TP-LINK TL-MR12U
Taobao: Www.taobao.com Amazon: www.amazon.com
2. Other AP lists (The external power is used and the AP obtains power from the USB port on the control board.) Note: The UMPT board has no USB interface, and APs with external power supply cannot obtain power from the UMPT board.
ID Model
1 TP-Link WR702N
Online Purchase Website Jingdong Mall: http://www.jd.com Taobao: www.taobao.com Amazon: www.amazon.com Ebay: www.ebay.com eBay: www.eachnet.com Best Buy: www.bestbuy.com Yahoo: shopping.yahoo.com Wal-Mart: www.walmart.com
2
POWERLINK AP2403 or POWERLINK PTAP2403
3 B-Link BL-MP01
Amazon: www.amazon.com Ebay: www.ebay.com eBay: www.eachnet.com Best Buy: www.bestbuy.com Jingdong Mall: http://www.jd.com Taobao: www.taobao.com
Configurat ion Item Supported standards and protocols Work mode AP mode settings RET type Transmissi on efficiency Work voltage/Cur rent Charging cable Port Built-in battery
Configuration Requirements IEEE 802.11 b, 802.11 g, 802.11 n AP mode The default is AP, and the IP address is automatically configured. It can be manually switched to the AP by pressing the handover key. Built-in antenna 11 b: 11 Mbit/s, 11 g: 54 Mbit/s, 11 n: 150 Mbit/s DC 5 V/500 mA USB cable Ethernet port Greater than 5200 mAh
Amazon: www.amazon.com
Note: Theoretically, all APs in the market support self-supplied power. However, some AP vendors set built-in firewall and password by default. If you find that theCO., WDT cannot log in to the base station or cannot upgrade the software, disable the default settings and HUAWEI Confidential HUAWEI TECHNOLOGIES Page 13 HISILICON SEMICONDUCTOR LTD. password of the AP firewall.
Part II Wireless Deployment Tool WDT Operation Guide Slides(V100R005C00SPC100) December 2014
Part I Wireless Deployment Tool WDT Promotional Slides Part II Wireless Deployment Tool WDT Operation Guide Slides
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Function 1: Install and Configure the WDT Step 1. Obtain WDT and install You can obtain the WDT installation package using either of the following two methods: 1. Log in to http://support.huawei.com and navigate to the following path: Support > Product Support > Wireless Network > Wireless Professional Service > Radio Access Service > GENEX > WDT (free application download)
Copy WDT.apk to the root directory of the smartphone and click to install. 2. Scan the following two-dimension code and download the installation package:(Print QR Code on paper) Click to install after download successfully.
QR Code
Step 2. Automatically create folders WDT will create HuaweiSDTData and subfolders automatically.
Folders HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 15
Function 1: Install and Configure the WDT Step 3. License applying 1. Online applying(recommended way).Project administrator to authorize the privileges. a. Project Administrator bulk import phone IMSI number,click "Register" button to apply. b. Install the tool and click on the "Register", the device will automatically be reported to the information the user ID, the project administrator added. Note: A project can have one or more interface person, please contact the administrator (Sang Yanqi 00189072, Wei Jie 00190129) to set new administrator privileges, after setting to manage the project and apply for License
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
2. Offline applying a. Obtain Device ID from b. Send to administrator Wei Jie 00190129, Li Wuyang 00186135 Note: Provide your project information while sending email. c. Copy license file to smart phone. d. Import file and start to use WDT.
Page 16
GUI
Phone does not require to pre-connect Wi-Fi, Please click "Deployment" icon and then to select Wi-Fi signal, then can connect AP and login station.
2. WDT start
Click the SDT icon, select the RAT of base stations you want to log in to, and select the site where the configuration file is saved. The navigation page is displayed.
According to standard, software version and control board to select the corresponding "Select Mode" option, please refer to the following table.
Choosing the destination version mode to login
Recommended Logging RAT
RAT Selection
GSM
GSM
HuaweiBTSInfo / GSM
WMPT
UMTS
UMTS
HuaweiBTSInfo / UMTS
LMPT
LTE
LTE
UMPT
GSM/ UMTS/ LTE/ GU/ GL/ UL/ GUL
BTS3900
Micro UMTS, Micro LTE
Micro
Lampsite UMTS, Lampsite LTE, Lampsite UL
Lampsite
Base Station Type GTMU
BTS3202E/ BTS3203E/ BTS3902E/ BTS3803E LAMPSITE
Path
HuaweiBTSInfo / LTE HuaweiBTSInfo / BTS3900
HuaweiBTSInfo / Micro
HuaweiBTSInfo / Lampsite
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 17
Function 1: One-Click Deployment 1. The base station software, scripts and license issued
The macro site, micro site, and LampSite are supported. The progress of loading the software, configuration, or license is visible. You can select software RATs of co-MPT base stations.
One-click deployment Visible progress and status
Automatically read the board and version
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 18
Function 2: GUI-based Detection 1. Base station commissioning - transmission link setup visibility
The visibility of IP transmission deployment process allows you to locate faults quickly. It reduces the time from 20-minute to 1.
Red, yellow, and green lights indicate task results, providing a simple and direct view. You can expand them to view details.
Note: Create site NE icons on the M2000 to ensure that the status of 1. OMCH/OML Information is in green, indicating connected.
Automatic detection of the expert system Comprehensive transmission information and clear fault view Useful tool of transmission fault locating and demarcation
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 19
Function 2: GUI-based Detection 2. Base station commissioning - Transmission fault check
The input-free function automatically reads the next hop IP address of the base station and the IP addresses of the BSC and M2000. The ping and Tracert tests can be executed multiple times.
You can manually change and type the IP address, and check service IP addresses.
Manual ping and Tracert tests
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 20
Function 2: GUI-based Detection
Automatic tests No rework during the antenna construction
3. Base station commissioning - Antenna check
The WDT allows you to test the VSWR, intermodulation, and antenna cross feeder connection functions. Commands are automatically executed and results are displayed in red, yellow, and green, providing a direct and simple view.
Note: After the software and configuration data is download, base stations are restarted. Wait for 12 minutes and then enable the antenna check function. Software of RRUs takes effect slowly. It takes 12 minutes for three 8-channel RRUs to take effect.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 21
Meaning of signal green : not interfered red : interfered yellow : execution failed
Function 2: GUI-based Detection 4. Base station commissioning - Alarm query The list in the current page can be refreshed so that the deleting status is confirmed in a timely manner.
Ensure that no engineering alarms exist before you leave sites to avoid possible future rework. This function can replace the external alarm detection board. Implementation Skills: Considering that the skills of subcontractors are poor in many areas, the following policies can be defined in the delivery procedure: Subcontractors are obligated to transmit site deployment logs back to a mailbox specified by OMC personnel after they complete the self-check. The OMC personnel use the WDT PC assistant to view the logs and verify that no errors occur and no engineering-related alarms are reported, and then notify the subcontractors of leaving the sites.
Please contact OMC to get further help HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 22
Function 2: GUI-based Detection 5. Base station commissioning - Board, optical power, cell, and GPS check
Allows you to query various kinds of information.
The GBTS does not support the board, optical power, cell, and GPS check at the local end.
Board status
Optical power
Places where problems probably occur are clearly displayed. RRU serial number, Can be used as an reference of CPRI crossfeed HUAWEI Confidential HUAWEI TECHNOLOGIES CO., LTD. If the optical power meter is used onsite, lead the customer into replacing the opticalPage power 23 meter with the WDT. HISILICON SEMICONDUCTOR
Function 2: GUI-based Detection
Ensure that the record information is consistent with the actual situation.
6. Common - Base station management Export the base station equipment archives, and check whether the material record information is consistent with the actual situation.
You can perform dialing tests of simple services by blocking or unblocking a cell.
By blocking cells to ensure the phone stay at the target cell, In order to do service tests.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 24
Function 3: Base station management 1. Common
Parameters of the IPRT/OMCH/VLANMAP/VLANCLASS are automatically queried and manually modified. Modification of transmission parameters of non-GSM macro sites and micro sites is supported.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
The parameters offer the optional items, which helps reduce manual input.
Page 25
Function 3: Base station management 2. Common - User-defined MML query
Error commands are identified at a glance and the execution progress can be stopped at any time.
User-defined query commands (LST and DSP) are supported.
Error commands are identified and you know the execution progress and return packet at a glance.
Format the command, highlight the wrong ones. Procedure 1. Edit MML,save file to /HuaweiBTSInfo/ MML. 2. WDT preparse the command and filter the wrong one. 3. Send commands to site and display the results. Pause at any time
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 26
Function 3: Base station management 3: Base station commissioning - Site deployment logs
Site deployment logs display operation processes and records related to base stations.
All operations related to base stations are traceable.
Each operation is recorded precisely, allowing you to trace and locate operations easily.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 27
You can manually check WDT log on phone, the path is \HuaweiWDTData\SiteName\LOG\
Function 4: Data Uploading 1: Site acceptance - Data uploading
After site deployment is complete, data is automatically uploaded to the OMC engineer email.
Sender and recipient emails are configurable. The sender email box must be Gmail.
One-click uploading and OMC synchronization locating
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 28
Function 4: Data Replay for Easy Troubleshooting Base station commissioning - Operation replay
You can replay deployment data on the mobile phone. Deployment results are displayed on GUIs,
Location of Replay files on phone
facilitating later problem locating and communication.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 29
Function 5: Site Acceptance - Site Photo-Taking
Fixed entry photo-taking: The mobile phone displays pre-configured entries on the screen. Workers take phones one by one based on these entries.
Random fault photo-taking. Take photos of all faults. Fault photos can be uploaded in real time, facilitating fault locating in time. Photos can be selected and descriptions can be added to photos.
Compression will reduce the picture quality of 45%, With 13 million pixel mobile phone for reference, Uncompressed, photo size is 1.2M, Compression, the picture 66k.
These entries can be customized. Photos are taken based on these entries. No photo is missing or improperly taken. Photos can be compressed or edited. HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 30
Function 5: Site Acceptance - ESN Bar Scanning
Avoid ESN copying and reading errors. Real-time uploading accelerates the PNP deployment.
Workers scan bar codes based on pre-configured ESN entries. The function supports one-dimension and two-dimension code scanning. The site name, RAT, and ESN name are automatically added before the ESN and then sent to OMC engineers by SMS or email. For example, Site78_GSM_BBU:210305394710CB001076. The BBU ESN can be used in ESN binding during the M2000 PNP deployment in real time. This avoids the inefficiency and errors of manual ESN reading.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 31
Function 5: Site Acceptance - Acquisition of GPS data
Enable the function manually to automatically obtain GPS information. GPS information is automatically saved in deployment reports.
GPS information is sent in real time, helping real-time position management.
Automatic GPS picture saving Correct site positions Correct time information
Add GPS info on photo
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 32
Function 5: Site Acceptance - Simple Service Verification
Allows you to view brief information about radio parameters,such as radio parameters of GSM,UMTS,LTE,and Wi-Fi. You need to log in to the base station to obtain PCI parameters of the LTE. The short message sending and receiving, MMS message sending, calling test, the HTTP test, and the FTP uplink and downlink tests are supported.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 33
Function 5: Site Acceptance - Simple Service Verification
Main Activities of Simple Service Verification
Set preferred network mode
Block other cells
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Log in to the site to obtain PCI (Optional)
HUAWEI Confidential
Set parameters of SMS,calling test,FTP,HTTP
Page 34
Result table
Function 5: Site Acceptance - Simple Service Verification
The short message sending and receiving, MMS message sending, calling test, the HTTP test, and the FTP uplink and downlink tests are supported. SMS,MMS message sending And receiving
Calling test
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
FTP uplink and downlink
HUAWEI Confidential
HTTP test
Page 35
Result
Functions 6: Common - Data service
Download software package and so on, Re-download them when changes on server
Downloads the configuration file, software package, and license.
Supports retransmission of data, such as deployment logs, photos, and ESN.
Supports online test of version upgrade and online downloading.
Supports the license authentication.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Online upgrading
Show License validity date, seven days before the expiry prompts the user to postpone the operation
Upload logs to server
Page 36
Functions 6: Common - SDTRP
http://support-trial.huawei.com/onlinetools/sdtrp/project.action
It provides the APP uniform access, site deployment data transmission, site deployment result send-back, terminal APP automatic updating, and terminal APP license management for the site deployment through smartphones.
ID
Type
Function
1
Management of site deployment files
2
Terminal configuration
Site deployment managemen t
Special Requirements
Description Provide the function to upload and delete site deployment files (such as site configuration files, software packages, and license files). Provide the function to configure the terminal APP parameters (such as the AP connection, base station settings, photographing items, ESN items, SWR thresholds, RET antenna, GSM self-defined alarms, undercurrent/overcurrent alarm settings, business validation, Email and SMS, and staff information) and transmit the data to the terminals based on actual project conditions.
None None The terminal must be able to access the network.
Obtaining of the site deployment results
Provide the function to query site deployment result files (such as the ESNs, GPS, site deployment logs, fault photos, acceptance photos) and download the site deployment result files through terminals.
4
Assignment of the site deployment terminals
Provide the function to assign the sites to designated terminals for site deployment (for example, assign multiple sites in a batch to one terminal for sites deployment).
5
Terminal online registration
Provide the function that the terminals register to the SDTRP server and then be added after being audited by the user.
6
Manual adding of site deployment terminals
Provide the function to manually add the terminals one by one based on the terminal IMEIs or import multiple terminals in a batch using an Excel file.
Extension of terminal validity term
Provide the function to manually extend the terminal validity term and to extend the terminal validity term after auditing its application for extending its validity term on the SDTRP server.
The terminal must be able to access the network.
Provide the function to export the offline license file that is controlled by the terminal validity term.
None
Provide the function to upload the terminal APP installation packages and update the APP version.
None
3
7 8 9
Terminal managemen t
Exporting of offline license Terminal APP management
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 37
The terminal must be able to access the network.
SDTRP - Site deployment management
Provide the function to create projects, create sites, upload and delete site deployment files (such as site configuration files, software packages, and license files).
Provide the function to query site deployment result files, or to filter by sitename , status and time.
Create a project
Filter function
Create a site Site list
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
View site logs
HUAWEI Confidential
Page 38
SDTRP - Site deployment management
Set WDTConfig.txt on the WEB window of the SDTRP server.
Provide the function to set the starting device number, reduce configuration difficulty.
Visual editor, simple and flexible Activated scenario
upload files
Starting Device number
Undercurrent/Overcurrent threshold
Edit WDTConfig.txt
Save as
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 39
SDTRP - Terminal management
Administrator online add and audit and transfer terminal, provide the function to bulk upload terminal list.
Upload the WDT installation package, prompts terminal to download and update.
Add terminal
Supported bulk upload
Online license applying
Update WDT version
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 40
Function 7: Windows Background Tool - Operation Replay
The mobile phone uploads deployment data in real time. The server displays deployment GUIs synchronously, facilitating fault locating and communication.
Copies the deployment data folder HuaweiSDTData in the root directory to the PC. Replays deployment data on the PC and stimulates mobile phone GUIs to reproduce previous onsite GUIs.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Synchronous display of site faults Whole replay of deployment process Everyone is a GTAC expert
Page 41
Function 8: Windows Background Tool - Site Acceptance Report Generation
The tool reads data generated during the deployment, such as deployment logs, site photos, ESNs, GPS information, and service test data, automatically generates professional, neat, systemic, and comprehensive reports, and submits them to telecom operators.
The 18-page report is automatically generated in 3 minutes. Site information is correct, complete, and neat.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 42
96.174_DBS3900 WCDMA.xlsx
Thank you!
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
HUAWEI Confidential
Page 43
View more...
Comments