PLANNING AND DESIGN OF MINOR IRRIGATION TANK ACROSS  KAMPINEEL KAMP INEELA A VANKA,N ANKA,NEAR EAR KOTHA VEPAKUPP VEPAKUPPAM AM VILLAGE VILLAGE,, RAMACHANDRAPURAM MANDAL, CHITTOOR DISTRICT DISTRICT,,  ANDHRAPRADESH .

BY 

M.DHANRAJ(106204) K.GIRISHKUMAR(106206) B.MADHULATHA(106209)) B.MADHULATHA(106209

LIST OF CONTENTS

1 2 3

INTRODUCTION RESERVOIR PLANNING GEOTECHNICAL INVESTIGATIONS

4 DESIGN OF EARTHEN EMBANKMENT 5

ESTIMATION AND COSTING

IRRIGATION Irrigation is the process of supplying of water to land by artificial means for the purpose of cultivation. CLASSIFICATION CLASSIFICA TION OF PROJECT Major irrigation project

Above 10000ha

Medium irrigation project Between 2000 to 10000ha Minor irrigation project

Below 2000ha

LOCATION Kampin Kamp inee eela la va vank nka, a,ne near ar Ko Koth tha a Vep Vepak akup uppa pam m village,Ram villa ge,Ramachand achandrapura rapuram m mand mandal, al, Chitt Chittoor oor distr district, ict, And Andhra hra Pradesh. PURPOSE AND SCOPE OF PROJECT This minor irrigation tank is proposed to meet the demands of  farmers and to use the available resources efficiently.

INVESTIGATIONS INVESTIGA TIONS FOR RESERVOIR PLANNING

ENGINEERING SURVEY

CONTOUR MAPS

GEOLOGICAL

INVESTIGATIONS

HYDROLOGICAL

GEOTECHNICAL

INVESTIGATIONS 1

Catchments area Free catchments =2.098sqkm 



Intercepted catchments = Nil

2

Quantity of water available in the river   Dependable flows  Storage capacity of River  and its levels Collection of data HYDROLOGIC CROP DETAILS Computation of runoff  

3

Casing soil Hearting Soil Foundation soil

.

Nature of catchments = Good

ENGINEERINGSURVEY

HYDROLOGICAL

GEOTECHNICAL

CATCHMENT AREA MAP

CONTOUR MAP

The R iver Yield Of The iver From the computed runoff 75% dependable yield of the basin is determined From flow duration curve75%dependable curve75%dependable yield of the basin=0.315M.cum

Computation Of Demand Crop water requirements in both both Kharif and Rabi seasons seasons are are computed by Modified Penman method. Monthly potential evapotranspiration at Arogyavaran Arogyavaran metrological station are used forcomputing the irrigation demand.

FLOW

DURATION CURVE

COMPUTATIONAL PROCEDURE 

COMPUTATIONAL PROCEDURE Consumptive Irrigation Requirement (CIR) =ET Net irrigation Requirement (NIR)

=CIR-Re

Field Irrigation Requierment (FIR)

= NIR/a

Gross Irrigation Requierment (GIR)

= FIR/c

where , a = Application Effciency and c = Conveyance Efficiency Demand in Kharif season

= 0.1536M.cum

Demand in Rabi season

= 0.0908M.cum

Total demand

= 0.2444M.cum/year 

RAINFALL RAINF ALL CURVE -SEPTEMBER

RAINFALL CURVE -AUGUST

RAINFALL CURVE -OCTOBER

RAINFALLCURVE -DECEMBER 

CROP WATER REQUIREMENTS

MODIFIED PENMAN

Crop : Groundnut Field efficiency :80% Period :120days Conveyance efficiency : 85% Ayacut : 80 hectares Season : Karif 

Crop : Hybrid sajja Field efficiency :80% Period :90days Conveyance efficiency : 85% Ayacut : 80 hectares Season : Rabi

FLOW

MASS CURVE

Y AT DIFFERENT WATER SUR FACE STORAGE CAPACIT CAPACITY ELEVATION

STORAGE CAPACIT CAPACITY Y

GEOTECHNICAL INVESTIGATIONS



Liquid limit and plastic limit



Sieve analysis



Proctors compaction



Permeability

 Triaxial compression

LIQUID LIMIT TEST

HEARTING

SOIL

FOUNDATION

SOIL

SIEVE ANALYSIS

Coefficient of Uniformity Cu

= 6.67 Coefficient of  Curvature Cc = 1.1 Since Cu > 6 and Cc lies between 1 and 3, SW  Well graded graded Sand. Sand.

SOIL CLASSIFICATION

FOUNDATION SOIL

STANDARD PROCTOR¶S COMPACTION TEST

HEARTING

SOIL

FOUNDATION

SOIL

TRIAXIAL COMPRESSION TEST

HEARTING SOIL

FOUNDATION

SOIL

Design of preliminary section Seepage analysis  Introduction  Determination of seepage flow net  Computation of seepage Stability analysis  Introduction  Computations for stability analysis

SEEPAGE ANALYSIS

STABILITY ANALYSIS

SURPLUS WEIR 

TANK SLUICE WITH TOWER HEAD

ESTIMATION

DETAILED AND ABSTRACT ESTIMATE ESTIMATE

1

OF EARTHEN BUND

DETAILED AND ABSTRACT ESTIMATE ESTIMATE

2

OF SURPLUS WEIR

. DETAILED AND ABSTRACT

3

ESTIMATE OF TANK SLUICE WITH W ITH A TOWER HEAD

ABSTRACT ESTIMA ESTIM ATE OF EARTHEN BUND S.No

Quantity

1

LS

2

11940

3

Description of work

Rate

Per

Clearing ligh light j ungle ungle along th the e bund, etc etc

Amount (Rs)

6000

Ear thwork arthw ork exc excava avattion For st s tripping soils

33.35

Cum

39700 005 5

135 350 0

Ear arthw thwork ork exc excava avattion f or or toe wall and toe drain

45.13

Cum

60926

4

1690

Ear thwork cuto arthw ork exc excava avattion f or or cut off 

45.13

Cum

76270

5

4260

182.20

cum

776172

6

608

R ough stone dry pac packing f or or revetm revetmen entt 00mm mm th thiick 300

501.3 .30 0

Cum

304791

7

558

Gravel bac backing under R evetm evetmen entt 0.3 .30 0m thick

289.15

Cum

617046

8

53

199.48

Cum

10573

9

1444

210.20

Cum

3035 352 29

10

34

601.40

Cum

20448

11

259

390.40

Cum

101114

478.15

Cum

6 4255 556

Ear arthw thwork ork exc excava avattion f or or hear eartting soils

Sprea preading ding gravel on top of  bund thiick th Laying

150mm

horizon orizonttal and vert ver tical sand f ilt ilters

300mm thick gr grad aded ed metal 25mm 50mm size R ock toe using 22 225 5mm tick

89

225 22 5mm thick ro rou ugh stone f or or toe drain

13

LS

Provision f or bailing out exc ex cava avattio ion n of cut off , etc

14

LS

Provision f or bou bo ulders,e lders,etc tc

15

LS

Provision f or or f orm orming ram ramps

LS

Provision f or or rou rounding off  off 

12

16

to

Total

removal

water

in 10000

of 

surf ace 10000 10000

2603 2603 2743033

ABSTRACT ESTIMATE OF SURPLUS WEIR  S no

1

Quan anttity

268cum

Des esc crip ripttion of of work Ear arthw thwor ork k ex exc cava avattion in alll so al soil ils s by mach chin ine e and depositting spo deposi poiil with thin in 5m radiu radi us f or or f ounda ndattions CC(1:6:10) mix using 40mm size HBG metal f or or f ounda ndattions Laying

2

156cum

wearing coa oatt with CC(1:2:4) mix using using 20mm size HBG metal f or or body wall

R ate

Per

Amount Amo (R s) s)

16.70

Cum

5.60 60 4475.

Cum

220615. 2 5.2

Cum

187846.656

Cum

259469

Cum

34283.9

Sqm

196664

Sqm

57316

1414.

20

Laying

3

7.92cum

4

202cum

Cons onsttruct uctiion of masonry in CM(1:5)

RR 

14.62cum

CC( 1:3:6) mix using 50% of 20 mm HBG metal f or or body wall

189.1sq sqm m

Plas lasttering th the e ex expo pose sed d f aces of RR mason asonary ary in CM(1:4) mix 20 20mm mm th thiick

2371. 80 1284.

50

Laying

5

6

7

115cum

R ough stone dry pac packing f or o r ap apro ron n using 0.3 .30m 0m thiick stone th Total

2345. 00

1040.

00

498.4

0

960671

ABSTRACT ESTIMATE OF TANK SLUICE WITH A TOWER HEAD S no

1

Quan anttity

80.478

Des esc crip ripttion work

of 

R ate

Per

Amo Am ount(RS t(RS) )

Ear thwork arthw ork exc ex cava avattion in all soil so ils s by mach chine ine and deposit ing spoil with thin in 5m us f or radiu radi or f ounda ndattions

16.70

1cum

1344

CC(1:6:10) mix using 40 mm metal size HBG f or or f ounda ndattions

1414 .2

1cum

113812

1cum

23403

1cum

120191

1sq sqm m

176884

Laying

2

80.478

0

CC(1:3:6) mix using 50% 2345. 5.0 0 of 20mm HBG 0 metal Cons uctiion onsttruct of  1284.5 RR mas ason onry ry in 0 CM(1:5) Plas the th lasttering e exposed f aces of  1040.0 RR masonry in CM 0 (1:4) mix 20mm thiick th Provision towards ctions bank conne onnect ions Laying

3

9.98

4

93.57

5

170.08

6

-LS-

7

-LS-

Provision f or or arranging p lu lug and arrangem arrange men entts Total

25000

15000

475634

ESTIMATED COST OF THE PROJECT



Estimated cos the ostt of th e earth earthen en bund

= R s. s. 2743033



Estimated cos f s us weir ostt of  surpl rplu

= R s. s.

960671



Estimated cos ostt of tank slu sluice with a tower head

= R s. s.

475634

Total cos ostt of the the pro j  je ect

= R s. s.

4179338

CONCLUSIONS



IT IS PROVOKED PROVOKED THAT IRRIGATION PROJECTS PROJECTS ARE ARE ASCERTAINED. THESE ARE HIGHLY VALUED PROJECTS , AND SPECIAL ATTRIBUTE KEEN INTEREST TAKEN BY GOVERNMENT IN CONVEYING WATER TO VILLAGES.



ATTRITUBE TO THIS , IRRIGATION PROJECTS ARE TIME DEPENDENT AND LESS FEASILBLE ECONOMICAL PROJECT , WE HAVE TO WORK UNDER VARIOUS PRESSURES.



REGRADELESS OF THE EFFORTS AND AMBIGUITIES TAKEN IN DOING THIS PROJECT, WE HAD THE PRIVILEGE OF DETAIL LEARNING AND EXPOSURE TO FIELD CONDITION.

ACKNOWLEDGEMENT



WE ARE THANKFUL TO TIRUPATI IRRIGATION DEPARTMENT , WHO HAVE GIVEN EMANCE INFORMATION IN PUT THIS T HIS PROJECT FORWARD



WE ARE DELIGHTED TO THANK PROF P.MALLIKARUJA P.MALLIKARUJAN N . WHO SPARED HIS VALUABLE VALUABLE GUIDELINES AND SPARED SPARED THIS VALUABLE VALUABLE TIME.



LAST BUT NOT LEAST , WE ARE EXTREMLY EXT REMLY HUMBLEMED TO EXPRESS OUR THANKS TO PROF ARUNA JOYTHI , WHO HELPED US IN ALL THE DIFFICULTS WHICH TEASED US WHILE EXCUTING THIS PROJECT

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF