Project Report on Tank Prefianl
Short Description
my btech project ppt...
Description
PLANNING AND DESIGN OF MINOR IRRIGATION TANK ACROSS KAMPINEEL KAMP INEELA A VANKA,N ANKA,NEAR EAR KOTHA VEPAKUPP VEPAKUPPAM AM VILLAGE VILLAGE,, RAMACHANDRAPURAM MANDAL, CHITTOOR DISTRICT DISTRICT,, ANDHRAPRADESH .
BY
M.DHANRAJ(106204) K.GIRISHKUMAR(106206) B.MADHULATHA(106209)) B.MADHULATHA(106209
LIST OF CONTENTS
1 2 3
INTRODUCTION RESERVOIR PLANNING GEOTECHNICAL INVESTIGATIONS
4 DESIGN OF EARTHEN EMBANKMENT 5
ESTIMATION AND COSTING
IRRIGATION Irrigation is the process of supplying of water to land by artificial means for the purpose of cultivation. CLASSIFICATION CLASSIFICA TION OF PROJECT Major irrigation project
Above 10000ha
Medium irrigation project Between 2000 to 10000ha Minor irrigation project
Below 2000ha
LOCATION Kampin Kamp inee eela la va vank nka, a,ne near ar Ko Koth tha a Vep Vepak akup uppa pam m village,Ram villa ge,Ramachand achandrapura rapuram m mand mandal, al, Chitt Chittoor oor distr district, ict, And Andhra hra Pradesh. PURPOSE AND SCOPE OF PROJECT This minor irrigation tank is proposed to meet the demands of farmers and to use the available resources efficiently.
INVESTIGATIONS INVESTIGA TIONS FOR RESERVOIR PLANNING
ENGINEERING SURVEY
CONTOUR MAPS
GEOLOGICAL
INVESTIGATIONS
HYDROLOGICAL
GEOTECHNICAL
INVESTIGATIONS 1
Catchments area Free catchments =2.098sqkm
Intercepted catchments = Nil
2
Quantity of water available in the river Dependable flows Storage capacity of River and its levels Collection of data HYDROLOGIC CROP DETAILS Computation of runoff
3
Casing soil Hearting Soil Foundation soil
.
Nature of catchments = Good
ENGINEERINGSURVEY
HYDROLOGICAL
GEOTECHNICAL
CATCHMENT AREA MAP
CONTOUR MAP
The R iver Yield Of The iver From the computed runoff 75% dependable yield of the basin is determined From flow duration curve75%dependable curve75%dependable yield of the basin=0.315M.cum
Computation Of Demand Crop water requirements in both both Kharif and Rabi seasons seasons are are computed by Modified Penman method. Monthly potential evapotranspiration at Arogyavaran Arogyavaran metrological station are used forcomputing the irrigation demand.
FLOW
DURATION CURVE
COMPUTATIONAL PROCEDURE
COMPUTATIONAL PROCEDURE Consumptive Irrigation Requirement (CIR) =ET Net irrigation Requirement (NIR)
=CIR-Re
Field Irrigation Requierment (FIR)
= NIR/a
Gross Irrigation Requierment (GIR)
= FIR/c
where , a = Application Effciency and c = Conveyance Efficiency Demand in Kharif season
= 0.1536M.cum
Demand in Rabi season
= 0.0908M.cum
Total demand
= 0.2444M.cum/year
RAINFALL RAINF ALL CURVE -SEPTEMBER
RAINFALL CURVE -AUGUST
RAINFALL CURVE -OCTOBER
RAINFALLCURVE -DECEMBER
CROP WATER REQUIREMENTS
MODIFIED PENMAN
Crop : Groundnut Field efficiency :80% Period :120days Conveyance efficiency : 85% Ayacut : 80 hectares Season : Karif
Crop : Hybrid sajja Field efficiency :80% Period :90days Conveyance efficiency : 85% Ayacut : 80 hectares Season : Rabi
FLOW
MASS CURVE
Y AT DIFFERENT WATER SUR FACE STORAGE CAPACIT CAPACITY ELEVATION
STORAGE CAPACIT CAPACITY Y
GEOTECHNICAL INVESTIGATIONS
Liquid limit and plastic limit
Sieve analysis
Proctors compaction
Permeability
Triaxial compression
LIQUID LIMIT TEST
HEARTING
SOIL
FOUNDATION
SOIL
SIEVE ANALYSIS
Coefficient of Uniformity Cu
= 6.67 Coefficient of Curvature Cc = 1.1 Since Cu > 6 and Cc lies between 1 and 3, SW Well graded graded Sand. Sand.
SOIL CLASSIFICATION
FOUNDATION SOIL
STANDARD PROCTOR¶S COMPACTION TEST
HEARTING
SOIL
FOUNDATION
SOIL
TRIAXIAL COMPRESSION TEST
HEARTING SOIL
FOUNDATION
SOIL
Design of preliminary section Seepage analysis Introduction Determination of seepage flow net Computation of seepage Stability analysis Introduction Computations for stability analysis
SEEPAGE ANALYSIS
STABILITY ANALYSIS
SURPLUS WEIR
TANK SLUICE WITH TOWER HEAD
ESTIMATION
DETAILED AND ABSTRACT ESTIMATE ESTIMATE
1
OF EARTHEN BUND
DETAILED AND ABSTRACT ESTIMATE ESTIMATE
2
OF SURPLUS WEIR
. DETAILED AND ABSTRACT
3
ESTIMATE OF TANK SLUICE WITH W ITH A TOWER HEAD
ABSTRACT ESTIMA ESTIM ATE OF EARTHEN BUND S.No
Quantity
1
LS
2
11940
3
Description of work
Rate
Per
Clearing ligh light j ungle ungle along th the e bund, etc etc
Amount (Rs)
6000
Ear thwork arthw ork exc excava avattion For st s tripping soils
33.35
Cum
39700 005 5
135 350 0
Ear arthw thwork ork exc excava avattion f or or toe wall and toe drain
45.13
Cum
60926
4
1690
Ear thwork cuto arthw ork exc excava avattion f or or cut off
45.13
Cum
76270
5
4260
182.20
cum
776172
6
608
R ough stone dry pac packing f or or revetm revetmen entt 00mm mm th thiick 300
501.3 .30 0
Cum
304791
7
558
Gravel bac backing under R evetm evetmen entt 0.3 .30 0m thick
289.15
Cum
617046
8
53
199.48
Cum
10573
9
1444
210.20
Cum
3035 352 29
10
34
601.40
Cum
20448
11
259
390.40
Cum
101114
478.15
Cum
6 4255 556
Ear arthw thwork ork exc excava avattion f or or hear eartting soils
Sprea preading ding gravel on top of bund thiick th Laying
150mm
horizon orizonttal and vert ver tical sand f ilt ilters
300mm thick gr grad aded ed metal 25mm 50mm size R ock toe using 22 225 5mm tick
89
225 22 5mm thick ro rou ugh stone f or or toe drain
13
LS
Provision f or bailing out exc ex cava avattio ion n of cut off , etc
14
LS
Provision f or bou bo ulders,e lders,etc tc
15
LS
Provision f or or f orm orming ram ramps
LS
Provision f or or rou rounding off off
12
16
to
Total
removal
water
in 10000
of
surf ace 10000 10000
2603 2603 2743033
ABSTRACT ESTIMATE OF SURPLUS WEIR S no
1
Quan anttity
268cum
Des esc crip ripttion of of work Ear arthw thwor ork k ex exc cava avattion in alll so al soil ils s by mach chin ine e and depositting spo deposi poiil with thin in 5m radiu radi us f or or f ounda ndattions CC(1:6:10) mix using 40mm size HBG metal f or or f ounda ndattions Laying
2
156cum
wearing coa oatt with CC(1:2:4) mix using using 20mm size HBG metal f or or body wall
R ate
Per
Amount Amo (R s) s)
16.70
Cum
5.60 60 4475.
Cum
220615. 2 5.2
Cum
187846.656
Cum
259469
Cum
34283.9
Sqm
196664
Sqm
57316
1414.
20
Laying
3
7.92cum
4
202cum
Cons onsttruct uctiion of masonry in CM(1:5)
RR
14.62cum
CC( 1:3:6) mix using 50% of 20 mm HBG metal f or or body wall
189.1sq sqm m
Plas lasttering th the e ex expo pose sed d f aces of RR mason asonary ary in CM(1:4) mix 20 20mm mm th thiick
2371. 80 1284.
50
Laying
5
6
7
115cum
R ough stone dry pac packing f or o r ap apro ron n using 0.3 .30m 0m thiick stone th Total
2345. 00
1040.
00
498.4
0
960671
ABSTRACT ESTIMATE OF TANK SLUICE WITH A TOWER HEAD S no
1
Quan anttity
80.478
Des esc crip ripttion work
of
R ate
Per
Amo Am ount(RS t(RS) )
Ear thwork arthw ork exc ex cava avattion in all soil so ils s by mach chine ine and deposit ing spoil with thin in 5m us f or radiu radi or f ounda ndattions
16.70
1cum
1344
CC(1:6:10) mix using 40 mm metal size HBG f or or f ounda ndattions
1414 .2
1cum
113812
1cum
23403
1cum
120191
1sq sqm m
176884
Laying
2
80.478
0
CC(1:3:6) mix using 50% 2345. 5.0 0 of 20mm HBG 0 metal Cons uctiion onsttruct of 1284.5 RR mas ason onry ry in 0 CM(1:5) Plas the th lasttering e exposed f aces of 1040.0 RR masonry in CM 0 (1:4) mix 20mm thiick th Provision towards ctions bank conne onnect ions Laying
3
9.98
4
93.57
5
170.08
6
-LS-
7
-LS-
Provision f or or arranging p lu lug and arrangem arrange men entts Total
25000
15000
475634
ESTIMATED COST OF THE PROJECT
Estimated cos the ostt of th e earth earthen en bund
= R s. s. 2743033
Estimated cos f s us weir ostt of surpl rplu
= R s. s.
960671
Estimated cos ostt of tank slu sluice with a tower head
= R s. s.
475634
Total cos ostt of the the pro j je ect
= R s. s.
4179338
CONCLUSIONS
IT IS PROVOKED PROVOKED THAT IRRIGATION PROJECTS PROJECTS ARE ARE ASCERTAINED. THESE ARE HIGHLY VALUED PROJECTS , AND SPECIAL ATTRIBUTE KEEN INTEREST TAKEN BY GOVERNMENT IN CONVEYING WATER TO VILLAGES.
ATTRITUBE TO THIS , IRRIGATION PROJECTS ARE TIME DEPENDENT AND LESS FEASILBLE ECONOMICAL PROJECT , WE HAVE TO WORK UNDER VARIOUS PRESSURES.
REGRADELESS OF THE EFFORTS AND AMBIGUITIES TAKEN IN DOING THIS PROJECT, WE HAD THE PRIVILEGE OF DETAIL LEARNING AND EXPOSURE TO FIELD CONDITION.
ACKNOWLEDGEMENT
WE ARE THANKFUL TO TIRUPATI IRRIGATION DEPARTMENT , WHO HAVE GIVEN EMANCE INFORMATION IN PUT THIS T HIS PROJECT FORWARD
WE ARE DELIGHTED TO THANK PROF P.MALLIKARUJA P.MALLIKARUJAN N . WHO SPARED HIS VALUABLE VALUABLE GUIDELINES AND SPARED SPARED THIS VALUABLE VALUABLE TIME.
LAST BUT NOT LEAST , WE ARE EXTREMLY EXT REMLY HUMBLEMED TO EXPRESS OUR THANKS TO PROF ARUNA JOYTHI , WHO HELPED US IN ALL THE DIFFICULTS WHICH TEASED US WHILE EXCUTING THIS PROJECT
View more...
Comments