REKAPITULASI ANGGARAN BIAYA PROGRAM

: PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN

: PEMBANGUNAN JALAN DENGAN LAPIS PERMUKAAN ASPAL

NAMA NAMA PEKERJ PEKERJAA AAN N

: LAPEN LAPEN JALA JALAN N TAMBA TAMBAN N LINGK LINGK.. IIII KEL KELUR URAH AHAN AN BUNU BUNUT T BARA BARAT T KEC. KISARAN BARAT

UNIT KERJA

: D IN INAS PEKERJAAN UMUM KABUPATEN ASAHAN

TAHUN ANGGARAN

: 20 2012

No.

URAIAN KEGIATAN

JUMLAH HARGA ( Rp )

1

2

6

I

PEKERJAAN PERSIAPAN

II

PE PEK KERJA ERJAA AN LAP LAPEN EN SEPA SEPANJ NJAN ANG G 45 450 X 3 M' M'

III

PEKERJAAN LAIN-LAIN

TERBILANG :

9,332,000.00

186,718,842.27

1,000,000.00

JUMLAH TOTAL

196,050,842.27

DIBULATKAN

196,050,000.00

Seratus Sembilan Puluh Enam Juta Lima Puluh Ribu Rupiah

Kisaran, 11 Juli 2012 Penawar, CV. DUA WARNA

Dibuat Oleh,

FERRY SYAHPUTRA NASUTION

SARIA GINTING

Direktur

Tenaga Teknis

ANGGARAN BIAYA PROGRAM

: PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN

: PEMBANGUNAN JALAN DENGAN LAPIS PERMUKAAN ASPAL

NAMA NAMA PE PEKE KERJ RJAA AAN N

: LAPEN LAPEN JALAN JALAN TAMB TAMBAN AN LINGK. LINGK. II KELUR KELURAH AHAN AN BUNU BUNUT T BAR BARAT AT KEC. KISARAN BARAT

UNIT KERJA

: D IN INAS PEKERJAAN UMUM KABUPATEN ASAHAN

TAHUN ANGGARAN

: 20 2 012

No.

URAIAN KEGIATAN

KODE ANALISA

KUANTITAS

HARGA SATUAN (Rp.)

HARGA TOTAL (Rp.)

1

2

3

4

6

7

I

PEKERJAAN PERSIAPAN

1.

Pembuatan / Sewa Kantor Direksi Keet + Gudang

Ls

-

 

2,000,000.00

2,000,000.00

2.

Pengukuran dan Pemasangan Patok Kembali

Ls

-

 

1,200,000.00

1,200,000.00

3.

Tanda Pengaman Lalu Lintas

Ls

-

 

850,000.00

850,000.00

4.

Mobilisasi dan Demobilisasi

Ls

-

 

5,282,000.00

5,282,000.00

SUB JUMLAH

9,332,000.00

II

PE PEKE KERJ RJAA AAN N LAP LAPEN EN SEPA SEPANJ NJAN ANG G 450 450 X 3 M'

1.

Pengupasan Tanah dan Pembersihan Semak

K 210

  450.00

M2 M2

 

3,125.00

1,406,250.00

2.

Perbaikan Existing dengan Telford / Penambahan Lebar

K 516

 

85.69

M3 M3

 

365,479.19

31,317,911.58

3.

Lapisan Penetrasi Macadam ( Lapen )

K 618

  1,350.00

M2 M2

 

114,070.13

153,994,680.69

SUB JUMLAH

186,718,842.27

I II

PEKERJAAN L AI AIN-LAIN

1.

Foto Dokumentasi

Ls

2.

Plank Nama Proyek

Ls

 

1.00 Bh Bh

 

400,000.00

400,000.00

 

600,000.00

600,000.00

SUB JUMLAH

1,000,000.00

JUMLAH TOTAL

197,050,842.27

DIBULATKAN

197,050,000.00

Terbilang : Seratus Sembilan Puluh Tujuh Juta Lima Puluh Ribu Rupiah

Kisaran, 11 Juli 2012 Penawar; CV. DUA WARNA

Dibuat Oleh

FERRY SYAHPUTRA NASUTION

SARIA GINTING

Direktur 

Tenaga Teknis

ANGGARAN BIAYA PROGRAM

: PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN

: PEMBANGUNAN JALAN DENGAN LAPIS PERMUKAAN ASPAL

NAMA NAMA PE PEKE KERJ RJAA AAN N

: LAPEN LAPEN JALAN JALAN TAMB TAMBAN AN LINGK. LINGK. II KELUR KELURAH AHAN AN BUNU BUNUT T BAR BARAT AT KEC. KISARAN BARAT

UNIT KERJA

: D IN INAS PEKERJAAN UMUM KABUPATEN ASAHAN

TAHUN ANGGARAN

: 20 2 012

No.

URAIAN KEGIATAN

KODE ANALISA

KUANTITAS

HARGA SATUAN (Rp.)

HARGA TOTAL (Rp.)

1

2

3

4

6

7

I

PEKERJAAN PERSIAPAN

1.

Pembuatan / Sewa Kantor Direksi Keet + Gudang

Ls

-

 

2,000,000.00

2,000,000.00

2.

Pengukuran dan Pemasangan Patok Kembali

Ls

-

 

1,200,000.00

1,200,000.00

3.

Tanda Pengaman Lalu Lintas

Ls

-

 

850,000.00

850,000.00

4.

Mobilisasi dan Demobilisasi

Ls

-

 

5,282,000.00

5,282,000.00

SUB JUMLAH

9,332,000.00

II

PE PEKE KERJ RJAA AAN N LAP LAPEN EN SEPA SEPANJ NJAN ANG G 450 450 X 3 M'

1.

Pengupasan Tanah dan Pembersihan Semak

K 210

  450.00

M2 M2

 

3,125.00

1,406,250.00

2.

Perbaikan Existing dengan Telford / Penambahan Lebar

K 516

 

85.69

M3 M3

 

365,479.19

31,317,911.58

3.

Lapisan Penetrasi Macadam ( Lapen )

K 618

  1,350.00

M2 M2

 

114,070.13

153,994,680.69

SUB JUMLAH

186,718,842.27

I II

PEKERJAAN L AI AIN-LAIN

1.

Foto Dokumentasi

Ls

2.

Plank Nama Proyek

Ls

 

1.00 Bh Bh

 

400,000.00

400,000.00

 

600,000.00

600,000.00

SUB JUMLAH

1,000,000.00

JUMLAH TOTAL

197,050,842.27

DIBULATKAN

197,050,000.00

Terbilang : Seratus Sembilan Puluh Tujuh Juta Lima Puluh Ribu Rupiah

Kisaran, 11 Juli 2012 Penawar; CV. DUA WARNA

Dibuat Oleh

FERRY SYAHPUTRA NASUTION

SARIA GINTING

Direktur 

Tenaga Teknis

199,250,000 197,950,000

DAFTAR HARGA UPAH DAN BAHAN

NO.

PEKERJAAN

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

URAIAN

KODE

Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang

L061 L071 L072 L073 L079 L081 L082 L083 L091 L092 L101 L103 L106

102,000.00 93,000.00 78,000.00 95,000.00 90,000.00 110,000.00 87,500.00 80,000.00 85,000.00 80,000.00 70,000.00 81,500.00 82,000.00 117,000.00 68,000.00

Pasir Pasang / Beton Pasir Urug Semen Tanah Timbun Kayu Bekisting Paku Batu Padas 10 - 15 cm Batu Padas 5 - 7 cm Batu Padas 3 - 5 cm Batu Padas 2 - 3 cm Batu Padas 1 - 2 cm Solar / Minyak Diesel Bensin Pelumas Aspal

M3 M3 Zak M3 M3 Kg M3 M3 M3 M3 M3 Ltr Ltr Btl Kg

M 041 M 040 M 080 M 040 M 180 M 166 M 020 M 022 M 023 M 024 M 025 M 065

55,000.00 50,000.00 55,000.00 60,000.00 3,000,000.00 52,000.00 230,000.00 389,000.00 442,000.00 481,000.00 502,000.00 5,000.00 4,500.00 30,000.00 14,080.00

ALAT BANTU DAN LAINNYA Alat-alat Kerja ( 3 set )

set

M 170

150,000.00

A.

HARGA SATUAN UPAH

1  2 3 4 5 6 7 8 9 10 11 12 13 14 15

Mandor Mekanik Pembantu Mekanik Kepala Tukang Tukang Operator Terlatih Operator Kurang Terlatih Pembantu Operator Sopir Terampil Sopir Personil / Kernect Buruh Tak Terampil Buruh Semi Terlatih Buruh Terampil ( Pekerja ) Masinis Jaga Malam

B

SATUAN UPAH Per Hari ( Rp )

SATUAN

HARGA BAHAN / MATERIAL

1 2 3 4 5 6 7 8 9 10 11 12  13  14  15 C 1

KET

Kisaran, 11 Juli 2012 Penawar  CV. DUA WARNA

Dibuat Oleh :

FERRY SYAHPUTRA NASUTION Direktur 

SARIA GINTING Tenaga Teknis

DINAS PEKERJAAN UMUM KABUPATEN ASAHAN TAHUN ANGGARAN 2012 PROPINSI : SUMATERA

ANALISA BIAYA PEKERJAAN

KODE

PENGUPASAN & PEMBERSIHAN SEMAK PADA DAMIJA

K210

( MENGGUNAKAN BURUH )

 KABUPATEN :  ASAHAN

KODE :

DISIAPKAN OLEH : TANGGAL :

 URAIAN :

ANGGAPAN / ASUMSI :

 1. Mengupas dan Membuang semak-semak

1. Menggunakan tenaga manusia (1200 M2/hari)

dengan tenaga manusia pada damija

2. Tidak ada pohon besar pada damija ( hanya semak )

(Daerah Milik Jalan)

3. Bakar sampah pada pekerjaan  4. Hasil kerja 25 m2 / orang - hari

 2. Lebar pengupasan dan pembersihan = damija-lebar

5. Umur alat bantu rata-rata 1 bula n / orang / set @ 3 ala t

badan jalan

JUMLAH ORANG

PEKERJA P E K E R J  A

KODE

JUMLAH HARI-KERJA

UPAH (Rp/org/hari)

BIAYA ( Rp )

Mandor

 

1.00

1

L061

1.00

  102,000.00

102,000.00

Buruh tak terlatih

 

48.00

1

L101

48.00

  70,000.00

3,360,000.00

PEKERJA

JUMLAH BAHAN

MATERIAL

M  A T E R I  A L

HARI

 Alat Bantu

1.92

VOLUME SATUAN

KODE

HARGA SATUAN ( Rp )

Set

M170

  150,000.00

BIAYA ( Rp )

SUB TOTAL ( Rp )

3,462,000.00

SUB TOTAL ( Rp )

288,000.00

MATERIAL

JUMLAH  ALAT

PERALATAN

HARI KERJA

KODE

JAM KERJA

HARGA ( Rp / Jam )

P E R  A L  A T  A N

BIAYA ( Rp )

288,000.00

SUB TOTAL

-

PERALATAN TOTAL Rp

VOLUME :

1200

SATUAN

M2

HARGA SATUAN Rp.

3,125.00

3,750,000.00

per M2

DINAS PEKERJAAN UMUM KABUPATEN ASAHAN TAHUN ANGGARAN 2012 PROPINSI : SUMATERA

ANALISA BIAYA PEKERJAAN

KODE

PENGUPASAN & PEMBERSIHAN SEMAK PADA DAMIJA

K516

( MENGGUNAKAN BURUH )

KABUPATEN :  ASAHAN

KODE :

DISIAPKAN OLEH : TANGGAL :

 URAIAN :

ANGGAPAN / ASUMSI :

1. Material disiapkan di lokasi pekerjaan

1. Menggunakan tenaga manusia (400 M2/hari)

2. Pasir dihampar setebal 5 cm

2. Material ditimbun di sepanjang jalan oleh pemasok

3. Batu Pecah Ukuran besar (10-15) di susun berdiri

3. Batu sudah dipecah (50% berat ukuran 10-15, 20% ukuran 5-7 dsb 30%

pada hamparan pasir 5 cm

Berat pasir urug

4. Batu pecah ukuran lebih kecil dihampar di atasnya sehingga

4. Tanah dasar jalan sudah disiapkan

rata kemudian dipadatkan / digil as dengan mesin gilas

5. Dip adatkan sampai tebal 20 cm  6. Koefisien pemadatan = 1,2  7. Umur alat bantu rata-rata 1 bulan JUMLAH ORANG

PEKERJA

P E K E R J  A

HARI

KODE

JUMLAH HARI-ORANG

UPAH (Rp/org/hari)

BIAYA ( Rp )

Mandor

2.00

1

L 061

 

2.00

  102,000.00

204,000.00

Operator Terlatih

1.00

1

L 081

 

1.00

  110,000.00

110,000.00

Pembantu Operator

1.00

1

L 089

 

1.00

 

80,000.00

80,000.00

Sopir

1.00

1

L 091

 

1.00

 

85,000.00

85,000.00

Pembantu Sopir

1.00

1

L 099

 

1.00

 

80,000.00

80,000.00

80.00

1

L 101

 

80.00

 

70,000.00

5,600,000.00

Buruh Tak Terampil

PEKERJA

JUMLAH BAHAN

MATERIAL

M  A T E R I  A L

KODE

HARGA SATUAN ( Rp )

BIAYA ( Rp )

Batu Padas 10 - 15 cm

50.00

M3

M 020

  230,000.00

11,500,000.00

Batu Pecah 5 - 7 cm

20.00

M3

M 022

  389,000.00

7,780,000.00

Pasir Urug

30.00

M3

M 040

 

50,000.00

1,500,000.00

3.20

set

M 170

  150,000.00

480,000.00

 Alat Bantu ( set@3 alat )

MATERIAL

JUMLAH  ALAT

PERALATAN

P E R  A L  A T  A N

VOLUME SATUAN

HARI KERJA

KODE

JAM KERJA

HARGA ( Rp / Jam )

BIAYA ( Rp )

Mesin Gilas Roda Besi

8-10 Ton

1.00

1.00

E 080

5.00

  172,137.00

860,685.00

Truck Tangki Air

115 HP

1.00

1.00

E 182

5.00

  191,730.00

958,650.00

SUB TOTAL ( Rp )

6,159,000.00

SUB TOTAL ( Rp )

21,260,000.00

SUB TOTAL

PERALATAN

1,819,335.00

TOTAL Rp

29,238,335.00

VOLUME :

80

SATUAN

M3

HARGA SATUAN Rp.

365,479.19

per M3

#VALUE!

DIREKTORAT JENDERAL BINA MARGA DIREKTORAT BINA PROGRAM JALAN SUB DIT. PERENCANAAN JALAN LOKAL & KABUPATEN PROPINSI SUMATERA  URAIAN :  1. Hampar agregat kasar 20 m2 / m3

KODE ( 12 )

 ANALISA BIAYA PEKERJAAN

KODE

LAPIS PENETRASI MACADAM

K618

( MENGGUNAKAN BURUH ) KABUPATEN ASAHAN

DISIAPKAN OLEH :

KODE

TANGGAL :

ANGGAPAN / ASUMSI : 1. Menggunakan Tenaga Buruh

 2. Digilas & dipadatkan dengan mesin gilas roda tiga 2. Agregat pecah tersaring dikirim ke lokasi pekerjaan oleh pemasok 6 - 8 ton 3. Semprotkan aspal pengunci 64 m2 / m3

3. Digunakan agregat pecah tersaring yang termurah 4. Agregat dihampar dengan tenaga manusia

 4. Semprotkan aspal binder 2,5 kg / m2

5. Tebal padat perkerasan 5 cm

 5. Hamparkan lapis seal dengan 12,5 mm chip 80 m2 / m3 & aspal 1,5 kg / m2

6. Permac sesuai rev. Spek. Umum B.M. Maret '89 - Buku JUMLAH ORANG

HARI

KODE

Mandor

6.00

3

L061

6.00

  102,000.00

612,000.00

Operator Terlatih

6.00

3

L061

6.00

  110,000.00

660,000.00

Supir Terampil

3.00

3

L091

3.00

  85,000.00

255,000.00

Pembantu Supir

3.00

3

L101

3.00

  80,000.00

240,000.00

174.00

3

L101

174.00

  70,000.00

12,180,000.00

6.00

3

L106

6.00

  82,000.00

492,000.00

PEKERJA

P E K E R J  A

Pekerja Tak Terampil Pekerja Terampil

UPAH JUMLAH HARI-ORANG (Rp/org/hari)

BIAYA ( Rp )

PEKERJA

MATERIAL

M  A T E R I  A L

JUMLAH

KODE

HARGA SATUAN ( Rp )

BIAYA ( Rp )

Batu Pecah 3 - 5 cm

56.00

M3

M 023

  442,000.00

24,752,000.00

Batu Pecah 2 - 3 cm Batu Pecah 1 - 2 cm

31.11 15.55

M3 M3

M 024 M 025

  481,000.00   502,000.00

14,963,910.00 7,806,100.00

3.50

M3

M 041

  55,000.00

192,500.00

6,160.00 450.00

Kg Ltr

M 061 M 065

  14,080.00   4,500.00

86,732,800.00 2,025,000.00

8.16

Set

M 170

  150,000.00

1,224,000.00

Pasir Beton  Aspal Minyak Bakar  Alat Bantu

JUMLAH  ALAT

PERALATAN

P E R  A L  A T  A

VOLUME SATUAN

SUB TOTAL ( Rp )

13,947,000.00

SUB TOTAL ( Rp )

MATERIAL

137,696,310.00

SUB TOTAL

HARI KERJA

KODE

JAM KERJA

HARGA ( Rp / Jam )

BIAYA ( Rp )

Mesin Gilas 3 Roda 8 - 10 T

 

1.00

3.00

E080

15.00

  160,599.79

2,408,996.88

 Aspal Sprayer 200 L

 

1.00

3.00

E154

15.00

  203,676.54

3,055,148.06

Dump Truck 3,5 T

 

1.00

3.00

E211

15.00

  172,715.50

2,590,732.44

PERALATAN

N

TOTAL Rp

VOLUME :

1400

SATUAN

M2

HARGA SATUAN Rp.

8,054,877.38 159,698,187.38

114,070.13 per M3

DIREKTORAT BINA PROGRAM JALAN

BIAYA ALAT UNTUK PERHITUNGAN

SUBDIT. PERENC. JALAN LOKAL

ANALISA BIAYA PEKERJAAN

KODE

DAN KABUPATEN PROPINSI

E

KODE

SUMATERA UTARA

KABUPATEN

1

2

: ROLLER 3 WHEEL 6 - 8 TON

HARGA

:

UMUR KERJA :

KODE

ASAHAN

JENIS ALAT

0

DISIAPKAN TANGGAL

6

TENAGA

37 HP

FAKTOR (CRF) :

0.18062

571,988,300.00

10 Year

:

15,000

1 Thn

:

300

Atau

:

1 Hari

Jam Hari Kerja 5

Jam Kerja :

1,500 jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )

1. Despresiasi

:

90

%

Alat

x

(CRF) x

1 Jam /Tahun

  0.90

=

2. Lain-lain

571,988,300.00

x

0.18062

x

x

1

1,500.00

=

Rp

61,987.516

=

Rp

11,439.766

=

Rp

73,427.282

: 3.3 %

Asuransi 3% Thn + PPN 10%

x

Harga Jam/Tahun

0.03

571,988,300.00

x 1,500.00 SUB TOTAL

B. BIAYA OPERASI (OPERATING COST) ( Rp / Jam ) Kebutuhan Bahan Bakar dan Pelumas tiap HP

Harga

:

:

Diesel

=

0.160

Liter/HP/Jam

Bensin

=

1.170

Liter/HP/Jam

Pelumas

=

0.006

Liter/HP/Jam

080

Solar / Minyak Diesel

=

Rp.

5,000.00

/ Liter  

Bensin

=

Rp.

4,500.00

/ Liter

 

Pelumas

=

Rp.

30,000.00

/ Liter

 

Bahan Bakar

=

 

0.160

x

51

x

Rp

5,000.00 =

Rp

40,800.000

Pelumas

=

 

0.006

x

51

x

Rp

30,000.00 =

Rp

9,180.000

Perbaikan dan Pareparts

=

  0.6

x

x

Rp

61,987.52 =

Rp

37,192.51

=

Rp

87,172.510

( 60 % x depresiasi ) SUB TOTAL

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL A +

B

=

Rp

73,427.282

+

Rp

87,172.510 =

DIREKTORAT BINA PROGRAM JALAN

BIAYA ALAT UNTUK PERHITUNGAN

SUBDIT. PERENC. JALAN LOKAL

ANALISA BIAYA PEKERJAAN

Rp

160,599.79 / Jam

KODE

DAN KABUPATEN PROPINSI

E

KODE

SUMATERA UTARA

1

KABUPATEN 2

: WATER TANK TRUCK 

HARGA

:

UMUR KERJA :

0

DISIAPKAN TANGGAL

6

TENAGA

115 HP

169,982,800.00

8 Year

:

9,600

1 Thn

:

300

:

1 Hari

Atau

KODE

ASAHAN

JENIS ALAT

Jam Hari Kerja 5

Jam Kerja :

1,200 jam

FAKTOR (CRF) :

0.20483

A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )

1. Despresiasi

:

90

%

x

Alat

(CRF) x

1 Jam /Tahun

=

2. Lain-lain

0.9

x

169,982,800.00

0.20483

x

x

1,200.00

1

=

Rp

26,113.18

=

Rp

4,249.57

=

Rp

30,362.75

: 3.3 %

Asuransi 3% Thn + PPN 10%

x

Harga Jam/Tahun

0.03

169,982,800.00

x 1,200.00 SUB TOTAL

B. BIAYA OPERASI (OPERATING COST) :

( Rp / Jam )

Kebutuhan Bahan Bakar d an Pelumas tiap : Diesel

=

0.160

Liter/HP/Jam

Bensin

=

1.170

Liter/HP/Jam

Pelumas

=

0.006

Liter/HP/Jam

182

Harga

:

Solar / Minyak Diesel

=

Rp.

5,000.00

/ Liter  

Bensin

=

Rp.

4,500.00

/ Liter

 

Pelumas

=

Rp.

30,000.00

/ Liter

 

Bahan Bakar

=

 

0.160

x

115

x Rp

5,000.00 =

Rp

92,000.000

Pelumas

=

 

0.006

x

115

x Rp

30,000.00 =

Rp

20,700.000

Perbaikan dan Pareparts

=

  0.6

x

26,113.18 =

Rp

15,667.91

( 60 % x depresiasi )

= =

Rp

128,367.910

128,367.91 =

Rp

  SUB TOTAL

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL A +

B

=

Rp

30,362.75

+

Rp

DIREKTORAT BINA PROGRAM JALAN

BIAYA ALAT UNTUK PERHITUNGAN

SUBDIT. PERENC. JALAN LOKAL

ANALISA BIAYA PEKERJAAN

158,730.66 / Jam

KODE

DAN KABUPATEN PROPINSI

E

KODE

SUMATERA UTARA

1

KABUPATEN 2

: ASPHALT SPRAYER TOWED 200 L

HARGA

:

UMUR KERJA :

KODE

ASAHAN

JENIS ALAT

0

DISIAPKAN TANGGAL

9

TENAGA

25 HP

FAKTOR (CRF) :

0.23668

396,000,000.00

6 Year

:

7,200

1 Thn

:

300

Atau

:

1 Hari

Jam Hari Kerja 5

Jam Kerja :

1,200 jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )

1. Despresiasi

:

90

%

x

Alat

(CRF) x

1 Jam /Tahun

=

2. Lain-lain

0.9

x

396,000,000.00

x

0.23668

x

750.00

1

=

:

Asuransi 3% Thn + PPN 10%

3.3 %

x

Harga Jam/Tahun

0.033

x

153

396,000,000.00

=

Rp

112,470

,

750.00 =

SUB TOTAL

B. BIAYA OPERASI (OPERATING COST) :

Rp

129,894

( Rp / Jam )

Kebutuhan Bahan Bakar d an Pelumas tiap :

Harga

:

Diesel

=

0.160

Liter/HP/Jam

Bensin

=

1.170

Liter/HP/Jam

Pelumas

=

0.006

Liter/HP/Jam

Solar / Minyak Diesel

=

Rp.

5,000.00

/ Liter  

Bensin

=

Rp.

4,500.00

/ Liter

 

Pelumas

=

Rp.

30,000.00

/ Liter

 

Bahan Bakar

=

 

0.160

x

7

x Rp

4,500.00 =

Rp

5,040.000

Pelumas

=

 

0.006

x

7

x Rp

30,000.00 =

Rp

1,260.000

Perbaikan dan Pareparts

=

  0.6

x

Rp

112,470.34 =

Rp

67,482.20

( 60 % x depresiasi )

= =

Rp

73,782.202

73,782.202 =

Rp

203,676.54 / Jam

SUB TOTAL

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL A +

B

=

Rp

129,894

+

Rp

DIREKTORAT BINA PROGRAM JALAN

BIAYA ALAT UNTUK PERHITUNGAN

SUBDIT. PERENC. JALAN LOKAL

ANALISA BIAYA PEKERJAAN

KODE

DAN KABUPATEN PROPINSI

E

KODE

SUMATERA UTARA

1

KABUPATEN 2

ASAHAN

JENIS ALAT

: DUMP TRUCK 

HARGA

:

UMUR KERJA :

:

7,800

1 Thn

:

300

Atau

:

1 Hari

:

90

%

x

0

9

DISIAPKAN TANGGAL

TENAGA

115 HP

Jam Hari Kerja 5

Jam Kerja :

1300 jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )

1. Despresiasi

KODE

258,900,500.00

6 Year

Alat

(CRF) x

1

211

FAKTOR (CRF) :

0.24668

Jam /Tahun 0.9

=

2. Lain-lain

258,900,500.00

x

0.24668

x

x

1

1,300.00

=

Rp

44,215

=

Rp

6,572

=

Rp

50,787

: 3.3 %

Asuransi 3% Thn + PPN 10%

x

Harga Jam/Tahun

0.033

258,900,500.00

x 1,300.00 SUB TOTAL

B. BIAYA OPERASI (OPERATING COST) ( Rp / Jam ) Kebutuhan Bahan Bakar d an Pelumas tiap :

Harga

:

Diesel

=

0.160

Liter/HP/Jam

Bensin

=

1.170

Liter/HP/Jam

Pelumas

=

0.006

Liter/HP/Jam

Solar / Minyak Diesel

=

Rp.

5,000.00

/ Liter  

Bensin

=

Rp.

4,500.00

/ Liter

 

Pelumas

=

Rp.

30,000.00

/ Liter

 

Bahan Bakar

=

 

0.160

x

106

x Rp

4,500.00 =

Rp

76,320.000

Pelumas

=

 

0.006

x

106

x Rp

30,000.00 =

Rp

19,080.000

Perbaikan dan Pareparts

=

  0.6

x

Rp

44,214.63 =

Rp

26,528.78

( 60 % x depresiasi )

= =

Rp

121,928.777

121,928.777 =

Rp

SUB TOTAL

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL A +

B

=

Rp

50,787

+

Rp

172,715.50 / Jam

Rp

160,599.79

Rp

158,730.66

Rp

203,676.54

Rp

172,715.50

DAFTAR HARGA DASAR PERALATAN PEKERJAAN JALAN KABUPATEN ASAHAN TAHUN ANGGARAN 2012

No

NAMA ALAT DAN KAPASITAS

UMUR DAN KAFASITAS ALAT

TOTAL BIAYA MODAL ( Rp )

KODE

TOTAL TAHUN

JAM PER TAHUN

TOTAL JAM

KAPASITAS ALAT (HORSE POWER)

CRF

1

Grader

115 HP

E 010

 

1,200,000,000

8

 

1,500

 

12,000

100

0.20483

2

Roller 3 Wheel

8-10 ton

E 080

 

571,988,300

10

 

1,500

 

15,000

37

0.18062

3

Roller Tandem

6-8 ton

E 081

 

532,200,000

10

 

1,500

 

15,000

40

0.18062

4

Roller Preumatic

8-15 ton

E 084

 

1,056,000,000

10

 

1,500

 

15,000

95

0.18062

5

Concrete Vibrator

E 089

 

55,200,000

5

 

600

 

3,000

4

0.28085

6

Asphalt Finisher

1,820 mm/ 30 HP

E 157

 

481,000,000

7

 

1,200

 

8,400

30

0.22600

7

Asphall Sprayer Towed

200 ltr

E 154

 

94,434,200

6

 

1,200

 

7,200

25

0.23668

8

Water Tank Truck

E 182

 

169,982,800

8

 

700

 

5,600

115

0.20483

E 222

 

196,400,000

8

 

700

 

5,600

115

0.20483

E 251

 

73,700,000

4

 

1,500

 

6,000

6

0.33271

9

Truck Picp Up

10

Concrete Mixer 125 L

11

Compressor

12

Water Pump Ø 5 cm

13

Dump Truck

39 HP 210 m3 / jam 3,5 T / 115 HP

E 301

 

126,000,000

8

 

750

 

6,000

35

0.20483

E 341

 

37,380,000

4

 

750

 

3,000

8

0.20483

E 211

 

258,900,500

6

 

1,300

 

7,800

115

0.23668

Kisaran, 11 Ju Penawar, CV. DUA WA

FERRY SYA Direktur 

HARGA ALAT Rp / Jam

Rp / Hari

 

372,665.00

1,863,325.00

 

160,599.79

802,998.96

 

146,926.00

734,630.00

 

308,726.00

1,543,630.00

 

44,366.00

88,732.00

 

173,510.00

694,040.00

 

203,676.54

1,018,382.69

 

158,730.66

793,653.31

 

191,730.00

440,979.00

 

30,893.00

154,465.00

 

76,592.00

191,480.00

 

33,213.00

83,032.50

 

172,715.50

863,577.48

HARGA ALAT Rp / Jam

Rp / Hari

 

372,665.00

1,863,325.00

 

160,599.79

802,998.96

 

146,926.00

734,630.00

 

308,726.00

1,543,630.00

 

44,366.00

88,732.00

 

173,510.00

694,040.00

 

203,676.54

1,018,382.69

 

158,730.66

793,653.31

 

191,730.00

440,979.00

 

30,893.00

154,465.00

 

76,592.00

191,480.00

 

33,213.00

83,032.50

 

172,715.50

863,577.48

li 2012 NA

PUTRA NASUTION

JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE ) PEKERJAAN

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

NO

URAIAN KEGIATAN

BULAN I

HARGA TOTAL BOBOT ( Rp ) (%)

M1

1 Pembuatan / Sewa Kantor Direksi Keet + Gudang

  2,000,000.00

  1.01

1.01

2 Pengukuran dan Pemasangan Patok Kembali

  1,200,000.00

  0.61

0.61

3 Tanda Pengaman Lalu Lintas

 

850,000.00

  0.43

0.43

4 Mobilisasi dan Demobilisasi

  5,282,000.00

  2.68

1.34

I

M2

M3

BULAN II M4

M1

M2

M3

BULAN III M4

M1

M2

M3

BULAN IV M4

M1

M2

M3

M4

PEKERJAAN PERSIAPAN

63.88

II

PEKERJAAN LAPEN SEPANJANG 450 M X 3 M'

1 Pengupasan Tanah dan Pembersihan Semak

55.19

  1,406,250.00

  0.71

2 Perbaikan Existing dengan Telford / Penambahan Lebar

 31,317,911.58

  15.89

3 Lapisan Penetrasi Macadam ( Lapen )

153,994,680.69

  78.15

  0.36

0.35

46.50

  1.99

  1.99

  1.99

  1.99

  1.99

  1.98

  1.98

1.98

37.81

  8.69 20.43

III

1 Photo Dokumentasi

 

400,000.00

  0.20

  0.07

2 Plank Proyek

 

600,000.00

  0.30

0.30

JUMLAH 197,050,842.27

100.00

RENCANA MINGGUAN

8.45 4.47

3.76

0

  3.76

12.43

  0.36

  0.35

  1.99

  1.99

  8.69

8.69

  8.69

  8.69

8.69

18.38

0.07

14.42 10.44

6.46

4.12

  8.69

29.12

16.40

PEKERJAAN LAIN-LAIN

  8.69

  1.99

  1.99

  1.99

  1.98

  1.98

  2.05

  8.69

  8.69

JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE ) PEKERJAAN

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

NO

URAIAN KEGIATAN

BULAN I

HARGA TOTAL BOBOT ( Rp ) (%)

M1

1 Pembuatan / Sewa Kantor Direksi Keet + Gudang

  2,000,000.00

  1.01

1.01

2 Pengukuran dan Pemasangan Patok Kembali

  1,200,000.00

  0.61

0.61

3 Tanda Pengaman Lalu Lintas

 

850,000.00

  0.43

0.43

4 Mobilisasi dan Demobilisasi

  5,282,000.00

  2.68

1.34

I

M2

BULAN II

M3

M4

M1

M2

M3

BULAN III M4

M1

M2

M3

BULAN IV M4

M1

M2

M3

M4

PEKERJAAN PERSIAPAN

63.88

II

PEKERJAAN LAPEN SEPANJANG 450 M X 3 M'

1 Pengupasan Tanah dan Pembersihan Semak

55.19

  1,406,250.00

  0.71

2 Perbaikan Existing dengan Telford / Penambahan Lebar

 31,317,911.58

  15.89

3 Lapisan Penetrasi Macadam ( Lapen )

153,994,680.69

  78.15

  0.36

0.35

46.50

  1.99

  1.99

  1.99

  1.99

  1.99

  1.98

  1.98

1.98

37.81

  8.69 20.43

III

1 Photo Dokumentasi

 

400,000.00

  0.20

  0.07

2 Plank Proyek

 

600,000.00

  0.30

0.30

JUMLAH 197,050,842.27

100.00

12.43

8.45 4.47

3.76

0

  8.69

8.69

18.38

0.07

14.42 10.44

6.46

4.12

  8.69

29.12

16.40

PEKERJAAN LAIN-LAIN

  8.69

RENCANA MINGGUAN

  3.76

  0.36

  0.35

  1.99

  1.99

  1.99

  1.99

  1.99

  1.98

  1.98

  2.05

  8.69

  8.69

  8.69

  8.69

8.69

RENCANA KUMULATIF MINGGUAN

0   3.76

  4.12

  4.47

  6.46

  8.45

 10.44

 12.43

 14.42

 16.40

 18.38

 20.43

 29.12

 37.81

 46.50

 55.19

63.88

Kisara PENAWAR, CV. DUA WARNA

Dibuat

FERRY SYAHPUTRA NASUTION Direktur

SARIA Tenag

BULAN V M1

M2

M3

M4

KEMAJUAN PEKERJAAN

100.00  100

89.92

81.24

 80

1.34

72.56

 60

 40

  8.68

  8.68

  8.68

8.68

 20

0.06  -

  8.68

  8.68

  8.68

10.08

KET

BULAN V M1

M2

M3

M4

KEMAJUAN PEKERJAAN

KET

100.00  100

89.92

81.24

 80

1.34

72.56

 60

 40

  8.68

  8.68

  8.68

8.68

 20

0.06  -

  8.68

  8.68

  8.68

10.08

 72.56

 81.24

 89.92 100.00

n, 11 Juli 2012  Oleh,

 GINTING a Teknis

JADWAL PENGGUNAAN BAHAN PEKERJAAN

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

NO

URAIAN KEGIATAN

II

PEKERJAAN LAPEN SEPANJANG 450 M X 3 M'

1

Perbaikan Existing dengan Telford / Penambahan Lebar 

2

VOL

SAT

BULAN I M1

M2

BULAN II

M3

M4

M1

M2

BULAN III

M3

M4

M1

M2

BULAN IV

M3

M4

M1

M2

M3

Batu Padas 10 - 15 cm

53.56

M3

 

6.69

 

6.69

 

6.69

 

6.69

 

6.70

 

6.70

 

6.70

6.70

Batu Pecah 5 - 7 cm

21.42

M3

 

2.68

 

2.68

 

2.68

 

2.68

 

2.68

 

2.68

 

2.67

2.67

Pasir Urug

32.13

M3

 

4.02

 

4.02

 

4.02

 

4.02

 

4.02

 

4.01

 

4.01

4.01

Batu Pecah 3 - 5 cm

54.00

M3

 

6.00

 

6.00

 

6.00

6.00

Batu Pecah 2 - 3 cm

30.00

M3

 

3.33

 

3.33

 

3.33

3.33

Batu Pecah 1 - 2 cm

14.99

M3

 

1.67

 

1.67

 

1.67

1.67

3.38

M3

 

0.38

 

0.38

 

0.38

0.38

5,940.00   433.93

Kg Ltr

  660.00

  660.00

  660.00

660.00

  48.21

  48.21

  48.21

48.21

Lapisan Penetrasi Macadam ( Lapen )

Pasir Beton  Aspal Minyak Bakar

JADWAL PENGGUNAAN BAHAN PEKERJAAN

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

NO

URAIAN KEGIATAN

II

PEKERJAAN LAPEN SEPANJANG 450 M X 3 M'

1

Perbaikan Existing dengan Telford / Penambahan Lebar 

2

VOL

BULAN I

SAT

M1

M2

BULAN II

M3

M4

M1

M2

BULAN III

M3

M4

M1

M2

BULAN IV

M3

M4

M1

M2

M3

Batu Padas 10 - 15 cm

53.56

M3

 

6.69

 

6.69

 

6.69

 

6.69

 

6.70

 

6.70

 

6.70

6.70

Batu Pecah 5 - 7 cm

21.42

M3

 

2.68

 

2.68

 

2.68

 

2.68

 

2.68

 

2.68

 

2.67

2.67

Pasir Urug

32.13

M3

 

4.02

 

4.02

 

4.02

 

4.02

 

4.02

 

4.01

 

4.01

4.01

Batu Pecah 3 - 5 cm

54.00

M3

 

6.00

 

6.00

 

6.00

6.00

Batu Pecah 2 - 3 cm

30.00

M3

 

3.33

 

3.33

 

3.33

3.33

Batu Pecah 1 - 2 cm

14.99

M3

 

1.67

 

1.67

 

1.67

1.67

3.38

M3

 

0.38

 

0.38

 

0.38

0.38

5,940.00   433.93

Kg Ltr

  660.00

  660.00

  660.00

660.00

  48.21

  48.21

  48.21

48.21

Lapisan Penetrasi Macadam ( Lapen )

Pasir Beton  Aspal Minyak Bakar

PENAWAR, CV. DUA WARNA

FERRY SYAHPUTRA NASUTION Direktur 

BULAN V M4

M1

M2

M3

M4

 

6.00

 

6.00

 

6.00

 

6.00

6.00

 

3.33

 

3.33

 

3.34

 

3.34

3.34

 

1.67

 

1.66

 

1.66

 

1.66

1.66

 

0.38

 

0.37

 

0.37

 

0.37

0.37

  660.00

  660.00

  660.00

  660.00

660.00

  48.21

  48.21

  48.21

  48.21

48.21

Kisaran, 11 Juli 2012

KET

BULAN V M4

M1

M2

M3

M4

 

6.00

 

6.00

 

6.00

 

6.00

6.00

 

3.33

 

3.33

 

3.34

 

3.34

3.34

 

1.67

 

1.66

 

1.66

 

1.66

1.66

 

0.38

 

0.37

 

0.37

 

0.37

0.37

  660.00

  660.00

  660.00

  660.00

660.00

  48.21

  48.21

  48.21

  48.21

48.21

KET

Kisaran, 11 Juli 2012 Dibuat Oleh,

SARIA GINTING Tenaga Teknis

JADWAL PENGGUNAAN ALAT PEKERJAAN KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

NO

II

1

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

URAIAN KEGIATAN

TOTAL WAKTU (JAM)

3

BULAN II

BULAN III

BULAN IV

M1

M2

M3

M4

M1

M2

M3

M4

M1

M2

M3

M4

M1

M2

M3

PEKERJAAN LAPEN SEPANJANG 450 X 3 M'

Pengupasan Tanah dan Pembersihan Semak  Alat Bantu

2

BULAN I SAT

0.72

set

5.36

jam

  0.67

  0.67

  0.67

  0.67

  0.67

  0.67

  0.67

0.67

  0.67

  0.67

  0.67

  0.67

  0.67

0.67

0.43   0.43

  0.43

  0.43

  0.43

0.42

  0.36

0.36

Perbaikan Existing dengan Telford / Penambahan Lebar  Mesin Gilas 3 Roda 6 - 8 T

 

Truck Tangki Air

 

5.36

jam

  0.67

  0.67

 Alat Bantu

 

3.43

set

  0.43

  0.43

Mesin Gilas 3 Roda 6 - 8 T

14.46

jam

  1.61

  1.61

  1.61

1.61

 Aspal Sprayer 200 L

14.46

jam

  1.61

  1.61

  1.61

1.61

Dump Truck 3,5 T

14.46

jam

  1.61

  1.61

  1.61

1.61

7.87

set

  0.87

  0.87

  0.87

0.87

Lapisan Penetrasi Macadam ( Lapen )

 Alat Bantu

 

JADWAL PENGGUNAAN ALAT PEKERJAAN KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

NO

II

1

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

URAIAN KEGIATAN

TOTAL WAKTU (JAM)

3

BULAN II

BULAN III

BULAN IV

M1

M2

M3

M4

M1

M2

M3

M4

M1

M2

M3

M4

M1

M2

M3

PEKERJAAN LAPEN SEPANJANG 450 X 3 M'

Pengupasan Tanah dan Pembersihan Semak  Alat Bantu

2

BULAN I SAT

0.72

set

5.36

jam

  0.67

  0.67

  0.67

  0.67

  0.67

  0.67

  0.67

0.67

  0.67

  0.67

  0.67

  0.67

  0.67

0.67

0.43   0.43

  0.43

  0.43

  0.43

0.42

  0.36

0.36

Perbaikan Existing dengan Telford / Penambahan Lebar  Mesin Gilas 3 Roda 6 - 8 T

 

Truck Tangki Air

 

5.36

jam

  0.67

  0.67

 Alat Bantu

 

3.43

set

  0.43

  0.43

Mesin Gilas 3 Roda 6 - 8 T

14.46

jam

  1.61

  1.61

  1.61

1.61

 Aspal Sprayer 200 L

14.46

jam

  1.61

  1.61

  1.61

1.61

Dump Truck 3,5 T

14.46

jam

  1.61

  1.61

  1.61

1.61

7.87

set

  0.87

  0.87

  0.87

0.87

Lapisan Penetrasi Macadam ( Lapen )

 Alat Bantu

 

Kisar PENAWAR, CV. DUA WARNA

Dibua

FERRY SYAHPUTRA NASUTION Direktur

SARI Tena

BULAN V KET M4

M1

M2

M3

M4

  1.61

  1.61

  1.60

  1.60

1.60

  1.61

  1.61

  1.60

  1.60

1.60

  1.61

  1.61

  1.60

  1.60

1.60

  0.87

  0.88

  0.88

  0.88

0.88

BULAN V KET M4

M1

M2

M3

M4

  1.61

  1.61

  1.60

  1.60

1.60

  1.61

  1.61

  1.60

  1.60

1.60

  1.61

  1.61

  1.60

  1.60

1.60

  0.87

  0.88

  0.88

  0.88

0.88

n, 11 Juli 2012 t Oleh,

 GINTING a Teknis

JENIS BAHAN KERJA YANG DIGUNAKAN

PEKERJAAN

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

NO

1 2 3 4 5 6 7

JENIS BAHAN

VOLUME

Batu Padas 10 - 15 cm Batu Pecah 5 - 7 cm

50.00 20.00

Pasir Urug Batu Pecah 3 - 5 cm

30.00 56.00

Batu Pecah 2 - 3 cm

31.11

Batu Pecah 1 - 2 cm

15.55

SATUAN

KETERANGAN

M3 M3 M3 M3 M3 M3 M3

Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri B h d l N i

JENIS BAHAN KERJA YANG DIGUNAKAN

PEKERJAAN

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

JENIS BAHAN

NO

1 2 3 4 5 6 7 8 9

VOLUME

Batu Padas 10 - 15 cm Batu Pecah 5 - 7 cm

50.00 20.00

Pasir Urug Batu Pecah 3 - 5 cm

30.00 56.00

Batu Pecah 2 - 3 cm

31.11

Batu Pecah 1 - 2 cm Pasir Beton

15.55 3.50

 Aspal

6,160.00

Minyak Bakar

450.00

SATUAN

KETERANGAN

M3 M3 M3 M3 M3 M3 M3 Kg Ltr

Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri

Kisaran, 11 Juli 2012 Diketahui Oleh; CV. DUA WARNA

Dibuat Oleh;

FERRY SYAHPUTRA NASUTION Direktur 

SARIA GINTING Tenaga Teknis

DAFTAR DAN HARGA PERALATAN UTAMA

PEKERJAAN

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

NO

NAMA PERALATAN

TAHUN PEMBUATAN

JUMLAH ALAT

MERK ALAT

HARGA

1

MESIN GILAS 3 RODA 6 - 8 Ton

2002

1

SAKAI R25-3

571,988,300

2

WATER TANK TRUCK

2003

1

MITSUBISHI

169,982,800

3

 ASPAL SPRAYER 200 L

2000

1

SAKAI AS 155

94,434,200

4

DUMP TRUCK

2007

5

MITSUBISHI

258,900,500

Kisaran, 11 Juli 2012 Diketahui Oleh; CV. DUA WARNA

Dibuat Oleh;

FERRY SYAHPUTRA NASUTION Direktur 

SARIA GINTING Tenaga Teknis

DAFTAR PERALATAN YANG DIPAKAI / UTAMA

PEKERJAAN

: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN

: KISARAN BARAT

KABUPATEN

: ASAHAN

NAMA PERALATAN

NO

TAHUN PEMBUATAN

JUMLAH ALAT

MERK ALAT

KETERANGAN

1

MESIN GILAS 3 RODA 6 - 8 Ton

2002

1

SAKAI R25-3

DUKUNGAN

2

WATER TANK TRUCK

2003

1

MITSUBISHI

DUKUNGAN

3

 ASPAL SPRAYER 200 L

2000

1

SAKAI AS 155

DUKUNGAN

4

DUMP TRUCK

2007

5

MITSUBISHI

DUKUNGAN

5

ALAT BANTU

2010

3 set

variasi

MILIK

Kisaran, 11 Juli 2012 Diketahui Oleh; CV. DUA WARNA

Dibuat Oleh;

FERRY SYAHPUTRA NASUTION Direktur 

SARIA GINTING Tenaga Teknis