Lapen Jalan Tamban
July 18, 2018 | Author: mahiraumaiza | Category: N/A
Short Description
Dewi Karya Penawaran...
Description
REKAPITULASI ANGGARAN BIAYA PROGRAM
: PEMBANGUNAN JALAN DAN JEMBATAN
KEGIATAN
: PEMBANGUNAN JALAN DENGAN LAPIS PERMUKAAN ASPAL
NAMA NAMA PEKERJ PEKERJAA AAN N
: LAPEN LAPEN JALA JALAN N TAMBA TAMBAN N LINGK LINGK.. IIII KEL KELUR URAH AHAN AN BUNU BUNUT T BARA BARAT T KEC. KISARAN BARAT
UNIT KERJA
: D IN INAS PEKERJAAN UMUM KABUPATEN ASAHAN
TAHUN ANGGARAN
: 20 2012
No.
URAIAN KEGIATAN
JUMLAH HARGA ( Rp )
1
2
6
I
PEKERJAAN PERSIAPAN
II
PE PEK KERJA ERJAA AN LAP LAPEN EN SEPA SEPANJ NJAN ANG G 45 450 X 3 M' M'
III
PEKERJAAN LAIN-LAIN
TERBILANG :
9,332,000.00
186,718,842.27
1,000,000.00
JUMLAH TOTAL
196,050,842.27
DIBULATKAN
196,050,000.00
Seratus Sembilan Puluh Enam Juta Lima Puluh Ribu Rupiah
Kisaran, 11 Juli 2012 Penawar, CV. DUA WARNA
Dibuat Oleh,
FERRY SYAHPUTRA NASUTION
SARIA GINTING
Direktur
Tenaga Teknis
ANGGARAN BIAYA PROGRAM
: PEMBANGUNAN JALAN DAN JEMBATAN
KEGIATAN
: PEMBANGUNAN JALAN DENGAN LAPIS PERMUKAAN ASPAL
NAMA NAMA PE PEKE KERJ RJAA AAN N
: LAPEN LAPEN JALAN JALAN TAMB TAMBAN AN LINGK. LINGK. II KELUR KELURAH AHAN AN BUNU BUNUT T BAR BARAT AT KEC. KISARAN BARAT
UNIT KERJA
: D IN INAS PEKERJAAN UMUM KABUPATEN ASAHAN
TAHUN ANGGARAN
: 20 2 012
No.
URAIAN KEGIATAN
KODE ANALISA
KUANTITAS
HARGA SATUAN (Rp.)
HARGA TOTAL (Rp.)
1
2
3
4
6
7
I
PEKERJAAN PERSIAPAN
1.
Pembuatan / Sewa Kantor Direksi Keet + Gudang
Ls
-
2,000,000.00
2,000,000.00
2.
Pengukuran dan Pemasangan Patok Kembali
Ls
-
1,200,000.00
1,200,000.00
3.
Tanda Pengaman Lalu Lintas
Ls
-
850,000.00
850,000.00
4.
Mobilisasi dan Demobilisasi
Ls
-
5,282,000.00
5,282,000.00
SUB JUMLAH
9,332,000.00
II
PE PEKE KERJ RJAA AAN N LAP LAPEN EN SEPA SEPANJ NJAN ANG G 450 450 X 3 M'
1.
Pengupasan Tanah dan Pembersihan Semak
K 210
450.00
M2 M2
3,125.00
1,406,250.00
2.
Perbaikan Existing dengan Telford / Penambahan Lebar
K 516
85.69
M3 M3
365,479.19
31,317,911.58
3.
Lapisan Penetrasi Macadam ( Lapen )
K 618
1,350.00
M2 M2
114,070.13
153,994,680.69
SUB JUMLAH
186,718,842.27
I II
PEKERJAAN L AI AIN-LAIN
1.
Foto Dokumentasi
Ls
2.
Plank Nama Proyek
Ls
1.00 Bh Bh
400,000.00
400,000.00
600,000.00
600,000.00
SUB JUMLAH
1,000,000.00
JUMLAH TOTAL
197,050,842.27
DIBULATKAN
197,050,000.00
Terbilang : Seratus Sembilan Puluh Tujuh Juta Lima Puluh Ribu Rupiah
Kisaran, 11 Juli 2012 Penawar; CV. DUA WARNA
Dibuat Oleh
FERRY SYAHPUTRA NASUTION
SARIA GINTING
Direktur
Tenaga Teknis
ANGGARAN BIAYA PROGRAM
: PEMBANGUNAN JALAN DAN JEMBATAN
KEGIATAN
: PEMBANGUNAN JALAN DENGAN LAPIS PERMUKAAN ASPAL
NAMA NAMA PE PEKE KERJ RJAA AAN N
: LAPEN LAPEN JALAN JALAN TAMB TAMBAN AN LINGK. LINGK. II KELUR KELURAH AHAN AN BUNU BUNUT T BAR BARAT AT KEC. KISARAN BARAT
UNIT KERJA
: D IN INAS PEKERJAAN UMUM KABUPATEN ASAHAN
TAHUN ANGGARAN
: 20 2 012
No.
URAIAN KEGIATAN
KODE ANALISA
KUANTITAS
HARGA SATUAN (Rp.)
HARGA TOTAL (Rp.)
1
2
3
4
6
7
I
PEKERJAAN PERSIAPAN
1.
Pembuatan / Sewa Kantor Direksi Keet + Gudang
Ls
-
2,000,000.00
2,000,000.00
2.
Pengukuran dan Pemasangan Patok Kembali
Ls
-
1,200,000.00
1,200,000.00
3.
Tanda Pengaman Lalu Lintas
Ls
-
850,000.00
850,000.00
4.
Mobilisasi dan Demobilisasi
Ls
-
5,282,000.00
5,282,000.00
SUB JUMLAH
9,332,000.00
II
PE PEKE KERJ RJAA AAN N LAP LAPEN EN SEPA SEPANJ NJAN ANG G 450 450 X 3 M'
1.
Pengupasan Tanah dan Pembersihan Semak
K 210
450.00
M2 M2
3,125.00
1,406,250.00
2.
Perbaikan Existing dengan Telford / Penambahan Lebar
K 516
85.69
M3 M3
365,479.19
31,317,911.58
3.
Lapisan Penetrasi Macadam ( Lapen )
K 618
1,350.00
M2 M2
114,070.13
153,994,680.69
SUB JUMLAH
186,718,842.27
I II
PEKERJAAN L AI AIN-LAIN
1.
Foto Dokumentasi
Ls
2.
Plank Nama Proyek
Ls
1.00 Bh Bh
400,000.00
400,000.00
600,000.00
600,000.00
SUB JUMLAH
1,000,000.00
JUMLAH TOTAL
197,050,842.27
DIBULATKAN
197,050,000.00
Terbilang : Seratus Sembilan Puluh Tujuh Juta Lima Puluh Ribu Rupiah
Kisaran, 11 Juli 2012 Penawar; CV. DUA WARNA
Dibuat Oleh
FERRY SYAHPUTRA NASUTION
SARIA GINTING
Direktur
Tenaga Teknis
199,250,000 197,950,000
DAFTAR HARGA UPAH DAN BAHAN
NO.
PEKERJAAN
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
URAIAN
KODE
Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang
L061 L071 L072 L073 L079 L081 L082 L083 L091 L092 L101 L103 L106
102,000.00 93,000.00 78,000.00 95,000.00 90,000.00 110,000.00 87,500.00 80,000.00 85,000.00 80,000.00 70,000.00 81,500.00 82,000.00 117,000.00 68,000.00
Pasir Pasang / Beton Pasir Urug Semen Tanah Timbun Kayu Bekisting Paku Batu Padas 10 - 15 cm Batu Padas 5 - 7 cm Batu Padas 3 - 5 cm Batu Padas 2 - 3 cm Batu Padas 1 - 2 cm Solar / Minyak Diesel Bensin Pelumas Aspal
M3 M3 Zak M3 M3 Kg M3 M3 M3 M3 M3 Ltr Ltr Btl Kg
M 041 M 040 M 080 M 040 M 180 M 166 M 020 M 022 M 023 M 024 M 025 M 065
55,000.00 50,000.00 55,000.00 60,000.00 3,000,000.00 52,000.00 230,000.00 389,000.00 442,000.00 481,000.00 502,000.00 5,000.00 4,500.00 30,000.00 14,080.00
ALAT BANTU DAN LAINNYA Alat-alat Kerja ( 3 set )
set
M 170
150,000.00
A.
HARGA SATUAN UPAH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Mandor Mekanik Pembantu Mekanik Kepala Tukang Tukang Operator Terlatih Operator Kurang Terlatih Pembantu Operator Sopir Terampil Sopir Personil / Kernect Buruh Tak Terampil Buruh Semi Terlatih Buruh Terampil ( Pekerja ) Masinis Jaga Malam
B
SATUAN UPAH Per Hari ( Rp )
SATUAN
HARGA BAHAN / MATERIAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 C 1
KET
Kisaran, 11 Juli 2012 Penawar CV. DUA WARNA
Dibuat Oleh :
FERRY SYAHPUTRA NASUTION Direktur
SARIA GINTING Tenaga Teknis
DINAS PEKERJAAN UMUM KABUPATEN ASAHAN TAHUN ANGGARAN 2012 PROPINSI : SUMATERA
ANALISA BIAYA PEKERJAAN
KODE
PENGUPASAN & PEMBERSIHAN SEMAK PADA DAMIJA
K210
( MENGGUNAKAN BURUH )
KABUPATEN : ASAHAN
KODE :
DISIAPKAN OLEH : TANGGAL :
URAIAN :
ANGGAPAN / ASUMSI :
1. Mengupas dan Membuang semak-semak
1. Menggunakan tenaga manusia (1200 M2/hari)
dengan tenaga manusia pada damija
2. Tidak ada pohon besar pada damija ( hanya semak )
(Daerah Milik Jalan)
3. Bakar sampah pada pekerjaan 4. Hasil kerja 25 m2 / orang - hari
2. Lebar pengupasan dan pembersihan = damija-lebar
5. Umur alat bantu rata-rata 1 bula n / orang / set @ 3 ala t
badan jalan
JUMLAH ORANG
PEKERJA P E K E R J A
KODE
JUMLAH HARI-KERJA
UPAH (Rp/org/hari)
BIAYA ( Rp )
Mandor
1.00
1
L061
1.00
102,000.00
102,000.00
Buruh tak terlatih
48.00
1
L101
48.00
70,000.00
3,360,000.00
PEKERJA
JUMLAH BAHAN
MATERIAL
M A T E R I A L
HARI
Alat Bantu
1.92
VOLUME SATUAN
KODE
HARGA SATUAN ( Rp )
Set
M170
150,000.00
BIAYA ( Rp )
SUB TOTAL ( Rp )
3,462,000.00
SUB TOTAL ( Rp )
288,000.00
MATERIAL
JUMLAH ALAT
PERALATAN
HARI KERJA
KODE
JAM KERJA
HARGA ( Rp / Jam )
P E R A L A T A N
BIAYA ( Rp )
288,000.00
SUB TOTAL
-
PERALATAN TOTAL Rp
VOLUME :
1200
SATUAN
M2
HARGA SATUAN Rp.
3,125.00
3,750,000.00
per M2
DINAS PEKERJAAN UMUM KABUPATEN ASAHAN TAHUN ANGGARAN 2012 PROPINSI : SUMATERA
ANALISA BIAYA PEKERJAAN
KODE
PENGUPASAN & PEMBERSIHAN SEMAK PADA DAMIJA
K516
( MENGGUNAKAN BURUH )
KABUPATEN : ASAHAN
KODE :
DISIAPKAN OLEH : TANGGAL :
URAIAN :
ANGGAPAN / ASUMSI :
1. Material disiapkan di lokasi pekerjaan
1. Menggunakan tenaga manusia (400 M2/hari)
2. Pasir dihampar setebal 5 cm
2. Material ditimbun di sepanjang jalan oleh pemasok
3. Batu Pecah Ukuran besar (10-15) di susun berdiri
3. Batu sudah dipecah (50% berat ukuran 10-15, 20% ukuran 5-7 dsb 30%
pada hamparan pasir 5 cm
Berat pasir urug
4. Batu pecah ukuran lebih kecil dihampar di atasnya sehingga
4. Tanah dasar jalan sudah disiapkan
rata kemudian dipadatkan / digil as dengan mesin gilas
5. Dip adatkan sampai tebal 20 cm 6. Koefisien pemadatan = 1,2 7. Umur alat bantu rata-rata 1 bulan JUMLAH ORANG
PEKERJA
P E K E R J A
HARI
KODE
JUMLAH HARI-ORANG
UPAH (Rp/org/hari)
BIAYA ( Rp )
Mandor
2.00
1
L 061
2.00
102,000.00
204,000.00
Operator Terlatih
1.00
1
L 081
1.00
110,000.00
110,000.00
Pembantu Operator
1.00
1
L 089
1.00
80,000.00
80,000.00
Sopir
1.00
1
L 091
1.00
85,000.00
85,000.00
Pembantu Sopir
1.00
1
L 099
1.00
80,000.00
80,000.00
80.00
1
L 101
80.00
70,000.00
5,600,000.00
Buruh Tak Terampil
PEKERJA
JUMLAH BAHAN
MATERIAL
M A T E R I A L
KODE
HARGA SATUAN ( Rp )
BIAYA ( Rp )
Batu Padas 10 - 15 cm
50.00
M3
M 020
230,000.00
11,500,000.00
Batu Pecah 5 - 7 cm
20.00
M3
M 022
389,000.00
7,780,000.00
Pasir Urug
30.00
M3
M 040
50,000.00
1,500,000.00
3.20
set
M 170
150,000.00
480,000.00
Alat Bantu ( set@3 alat )
MATERIAL
JUMLAH ALAT
PERALATAN
P E R A L A T A N
VOLUME SATUAN
HARI KERJA
KODE
JAM KERJA
HARGA ( Rp / Jam )
BIAYA ( Rp )
Mesin Gilas Roda Besi
8-10 Ton
1.00
1.00
E 080
5.00
172,137.00
860,685.00
Truck Tangki Air
115 HP
1.00
1.00
E 182
5.00
191,730.00
958,650.00
SUB TOTAL ( Rp )
6,159,000.00
SUB TOTAL ( Rp )
21,260,000.00
SUB TOTAL
PERALATAN
1,819,335.00
TOTAL Rp
29,238,335.00
VOLUME :
80
SATUAN
M3
HARGA SATUAN Rp.
365,479.19
per M3
#VALUE!
DIREKTORAT JENDERAL BINA MARGA DIREKTORAT BINA PROGRAM JALAN SUB DIT. PERENCANAAN JALAN LOKAL & KABUPATEN PROPINSI SUMATERA URAIAN : 1. Hampar agregat kasar 20 m2 / m3
KODE ( 12 )
ANALISA BIAYA PEKERJAAN
KODE
LAPIS PENETRASI MACADAM
K618
( MENGGUNAKAN BURUH ) KABUPATEN ASAHAN
DISIAPKAN OLEH :
KODE
TANGGAL :
ANGGAPAN / ASUMSI : 1. Menggunakan Tenaga Buruh
2. Digilas & dipadatkan dengan mesin gilas roda tiga 2. Agregat pecah tersaring dikirim ke lokasi pekerjaan oleh pemasok 6 - 8 ton 3. Semprotkan aspal pengunci 64 m2 / m3
3. Digunakan agregat pecah tersaring yang termurah 4. Agregat dihampar dengan tenaga manusia
4. Semprotkan aspal binder 2,5 kg / m2
5. Tebal padat perkerasan 5 cm
5. Hamparkan lapis seal dengan 12,5 mm chip 80 m2 / m3 & aspal 1,5 kg / m2
6. Permac sesuai rev. Spek. Umum B.M. Maret '89 - Buku JUMLAH ORANG
HARI
KODE
Mandor
6.00
3
L061
6.00
102,000.00
612,000.00
Operator Terlatih
6.00
3
L061
6.00
110,000.00
660,000.00
Supir Terampil
3.00
3
L091
3.00
85,000.00
255,000.00
Pembantu Supir
3.00
3
L101
3.00
80,000.00
240,000.00
174.00
3
L101
174.00
70,000.00
12,180,000.00
6.00
3
L106
6.00
82,000.00
492,000.00
PEKERJA
P E K E R J A
Pekerja Tak Terampil Pekerja Terampil
UPAH JUMLAH HARI-ORANG (Rp/org/hari)
BIAYA ( Rp )
PEKERJA
MATERIAL
M A T E R I A L
JUMLAH
KODE
HARGA SATUAN ( Rp )
BIAYA ( Rp )
Batu Pecah 3 - 5 cm
56.00
M3
M 023
442,000.00
24,752,000.00
Batu Pecah 2 - 3 cm Batu Pecah 1 - 2 cm
31.11 15.55
M3 M3
M 024 M 025
481,000.00 502,000.00
14,963,910.00 7,806,100.00
3.50
M3
M 041
55,000.00
192,500.00
6,160.00 450.00
Kg Ltr
M 061 M 065
14,080.00 4,500.00
86,732,800.00 2,025,000.00
8.16
Set
M 170
150,000.00
1,224,000.00
Pasir Beton Aspal Minyak Bakar Alat Bantu
JUMLAH ALAT
PERALATAN
P E R A L A T A
VOLUME SATUAN
SUB TOTAL ( Rp )
13,947,000.00
SUB TOTAL ( Rp )
MATERIAL
137,696,310.00
SUB TOTAL
HARI KERJA
KODE
JAM KERJA
HARGA ( Rp / Jam )
BIAYA ( Rp )
Mesin Gilas 3 Roda 8 - 10 T
1.00
3.00
E080
15.00
160,599.79
2,408,996.88
Aspal Sprayer 200 L
1.00
3.00
E154
15.00
203,676.54
3,055,148.06
Dump Truck 3,5 T
1.00
3.00
E211
15.00
172,715.50
2,590,732.44
PERALATAN
N
TOTAL Rp
VOLUME :
1400
SATUAN
M2
HARGA SATUAN Rp.
8,054,877.38 159,698,187.38
114,070.13 per M3
DIREKTORAT BINA PROGRAM JALAN
BIAYA ALAT UNTUK PERHITUNGAN
SUBDIT. PERENC. JALAN LOKAL
ANALISA BIAYA PEKERJAAN
KODE
DAN KABUPATEN PROPINSI
E
KODE
SUMATERA UTARA
KABUPATEN
1
2
: ROLLER 3 WHEEL 6 - 8 TON
HARGA
:
UMUR KERJA :
KODE
ASAHAN
JENIS ALAT
0
DISIAPKAN TANGGAL
6
TENAGA
37 HP
FAKTOR (CRF) :
0.18062
571,988,300.00
10 Year
:
15,000
1 Thn
:
300
Atau
:
1 Hari
Jam Hari Kerja 5
Jam Kerja :
1,500 jam
A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )
1. Despresiasi
:
90
%
Alat
x
(CRF) x
1 Jam /Tahun
0.90
=
2. Lain-lain
571,988,300.00
x
0.18062
x
x
1
1,500.00
=
Rp
61,987.516
=
Rp
11,439.766
=
Rp
73,427.282
: 3.3 %
Asuransi 3% Thn + PPN 10%
x
Harga Jam/Tahun
0.03
571,988,300.00
x 1,500.00 SUB TOTAL
B. BIAYA OPERASI (OPERATING COST) ( Rp / Jam ) Kebutuhan Bahan Bakar dan Pelumas tiap HP
Harga
:
:
Diesel
=
0.160
Liter/HP/Jam
Bensin
=
1.170
Liter/HP/Jam
Pelumas
=
0.006
Liter/HP/Jam
080
Solar / Minyak Diesel
=
Rp.
5,000.00
/ Liter
Bensin
=
Rp.
4,500.00
/ Liter
Pelumas
=
Rp.
30,000.00
/ Liter
Bahan Bakar
=
0.160
x
51
x
Rp
5,000.00 =
Rp
40,800.000
Pelumas
=
0.006
x
51
x
Rp
30,000.00 =
Rp
9,180.000
Perbaikan dan Pareparts
=
0.6
x
x
Rp
61,987.52 =
Rp
37,192.51
=
Rp
87,172.510
( 60 % x depresiasi ) SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL A +
B
=
Rp
73,427.282
+
Rp
87,172.510 =
DIREKTORAT BINA PROGRAM JALAN
BIAYA ALAT UNTUK PERHITUNGAN
SUBDIT. PERENC. JALAN LOKAL
ANALISA BIAYA PEKERJAAN
Rp
160,599.79 / Jam
KODE
DAN KABUPATEN PROPINSI
E
KODE
SUMATERA UTARA
1
KABUPATEN 2
: WATER TANK TRUCK
HARGA
:
UMUR KERJA :
0
DISIAPKAN TANGGAL
6
TENAGA
115 HP
169,982,800.00
8 Year
:
9,600
1 Thn
:
300
:
1 Hari
Atau
KODE
ASAHAN
JENIS ALAT
Jam Hari Kerja 5
Jam Kerja :
1,200 jam
FAKTOR (CRF) :
0.20483
A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )
1. Despresiasi
:
90
%
x
Alat
(CRF) x
1 Jam /Tahun
=
2. Lain-lain
0.9
x
169,982,800.00
0.20483
x
x
1,200.00
1
=
Rp
26,113.18
=
Rp
4,249.57
=
Rp
30,362.75
: 3.3 %
Asuransi 3% Thn + PPN 10%
x
Harga Jam/Tahun
0.03
169,982,800.00
x 1,200.00 SUB TOTAL
B. BIAYA OPERASI (OPERATING COST) :
( Rp / Jam )
Kebutuhan Bahan Bakar d an Pelumas tiap : Diesel
=
0.160
Liter/HP/Jam
Bensin
=
1.170
Liter/HP/Jam
Pelumas
=
0.006
Liter/HP/Jam
182
Harga
:
Solar / Minyak Diesel
=
Rp.
5,000.00
/ Liter
Bensin
=
Rp.
4,500.00
/ Liter
Pelumas
=
Rp.
30,000.00
/ Liter
Bahan Bakar
=
0.160
x
115
x Rp
5,000.00 =
Rp
92,000.000
Pelumas
=
0.006
x
115
x Rp
30,000.00 =
Rp
20,700.000
Perbaikan dan Pareparts
=
0.6
x
26,113.18 =
Rp
15,667.91
( 60 % x depresiasi )
= =
Rp
128,367.910
128,367.91 =
Rp
SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL A +
B
=
Rp
30,362.75
+
Rp
DIREKTORAT BINA PROGRAM JALAN
BIAYA ALAT UNTUK PERHITUNGAN
SUBDIT. PERENC. JALAN LOKAL
ANALISA BIAYA PEKERJAAN
158,730.66 / Jam
KODE
DAN KABUPATEN PROPINSI
E
KODE
SUMATERA UTARA
1
KABUPATEN 2
: ASPHALT SPRAYER TOWED 200 L
HARGA
:
UMUR KERJA :
KODE
ASAHAN
JENIS ALAT
0
DISIAPKAN TANGGAL
9
TENAGA
25 HP
FAKTOR (CRF) :
0.23668
396,000,000.00
6 Year
:
7,200
1 Thn
:
300
Atau
:
1 Hari
Jam Hari Kerja 5
Jam Kerja :
1,200 jam
A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )
1. Despresiasi
:
90
%
x
Alat
(CRF) x
1 Jam /Tahun
=
2. Lain-lain
0.9
x
396,000,000.00
x
0.23668
x
750.00
1
=
:
Asuransi 3% Thn + PPN 10%
3.3 %
x
Harga Jam/Tahun
0.033
x
153
396,000,000.00
=
Rp
112,470
,
750.00 =
SUB TOTAL
B. BIAYA OPERASI (OPERATING COST) :
Rp
129,894
( Rp / Jam )
Kebutuhan Bahan Bakar d an Pelumas tiap :
Harga
:
Diesel
=
0.160
Liter/HP/Jam
Bensin
=
1.170
Liter/HP/Jam
Pelumas
=
0.006
Liter/HP/Jam
Solar / Minyak Diesel
=
Rp.
5,000.00
/ Liter
Bensin
=
Rp.
4,500.00
/ Liter
Pelumas
=
Rp.
30,000.00
/ Liter
Bahan Bakar
=
0.160
x
7
x Rp
4,500.00 =
Rp
5,040.000
Pelumas
=
0.006
x
7
x Rp
30,000.00 =
Rp
1,260.000
Perbaikan dan Pareparts
=
0.6
x
Rp
112,470.34 =
Rp
67,482.20
( 60 % x depresiasi )
= =
Rp
73,782.202
73,782.202 =
Rp
203,676.54 / Jam
SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL A +
B
=
Rp
129,894
+
Rp
DIREKTORAT BINA PROGRAM JALAN
BIAYA ALAT UNTUK PERHITUNGAN
SUBDIT. PERENC. JALAN LOKAL
ANALISA BIAYA PEKERJAAN
KODE
DAN KABUPATEN PROPINSI
E
KODE
SUMATERA UTARA
1
KABUPATEN 2
ASAHAN
JENIS ALAT
: DUMP TRUCK
HARGA
:
UMUR KERJA :
:
7,800
1 Thn
:
300
Atau
:
1 Hari
:
90
%
x
0
9
DISIAPKAN TANGGAL
TENAGA
115 HP
Jam Hari Kerja 5
Jam Kerja :
1300 jam
A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )
1. Despresiasi
KODE
258,900,500.00
6 Year
Alat
(CRF) x
1
211
FAKTOR (CRF) :
0.24668
Jam /Tahun 0.9
=
2. Lain-lain
258,900,500.00
x
0.24668
x
x
1
1,300.00
=
Rp
44,215
=
Rp
6,572
=
Rp
50,787
: 3.3 %
Asuransi 3% Thn + PPN 10%
x
Harga Jam/Tahun
0.033
258,900,500.00
x 1,300.00 SUB TOTAL
B. BIAYA OPERASI (OPERATING COST) ( Rp / Jam ) Kebutuhan Bahan Bakar d an Pelumas tiap :
Harga
:
Diesel
=
0.160
Liter/HP/Jam
Bensin
=
1.170
Liter/HP/Jam
Pelumas
=
0.006
Liter/HP/Jam
Solar / Minyak Diesel
=
Rp.
5,000.00
/ Liter
Bensin
=
Rp.
4,500.00
/ Liter
Pelumas
=
Rp.
30,000.00
/ Liter
Bahan Bakar
=
0.160
x
106
x Rp
4,500.00 =
Rp
76,320.000
Pelumas
=
0.006
x
106
x Rp
30,000.00 =
Rp
19,080.000
Perbaikan dan Pareparts
=
0.6
x
Rp
44,214.63 =
Rp
26,528.78
( 60 % x depresiasi )
= =
Rp
121,928.777
121,928.777 =
Rp
SUB TOTAL
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL A +
B
=
Rp
50,787
+
Rp
172,715.50 / Jam
Rp
160,599.79
Rp
158,730.66
Rp
203,676.54
Rp
172,715.50
DAFTAR HARGA DASAR PERALATAN PEKERJAAN JALAN KABUPATEN ASAHAN TAHUN ANGGARAN 2012
No
NAMA ALAT DAN KAPASITAS
UMUR DAN KAFASITAS ALAT
TOTAL BIAYA MODAL ( Rp )
KODE
TOTAL TAHUN
JAM PER TAHUN
TOTAL JAM
KAPASITAS ALAT (HORSE POWER)
CRF
1
Grader
115 HP
E 010
1,200,000,000
8
1,500
12,000
100
0.20483
2
Roller 3 Wheel
8-10 ton
E 080
571,988,300
10
1,500
15,000
37
0.18062
3
Roller Tandem
6-8 ton
E 081
532,200,000
10
1,500
15,000
40
0.18062
4
Roller Preumatic
8-15 ton
E 084
1,056,000,000
10
1,500
15,000
95
0.18062
5
Concrete Vibrator
E 089
55,200,000
5
600
3,000
4
0.28085
6
Asphalt Finisher
1,820 mm/ 30 HP
E 157
481,000,000
7
1,200
8,400
30
0.22600
7
Asphall Sprayer Towed
200 ltr
E 154
94,434,200
6
1,200
7,200
25
0.23668
8
Water Tank Truck
E 182
169,982,800
8
700
5,600
115
0.20483
E 222
196,400,000
8
700
5,600
115
0.20483
E 251
73,700,000
4
1,500
6,000
6
0.33271
9
Truck Picp Up
10
Concrete Mixer 125 L
11
Compressor
12
Water Pump Ø 5 cm
13
Dump Truck
39 HP 210 m3 / jam 3,5 T / 115 HP
E 301
126,000,000
8
750
6,000
35
0.20483
E 341
37,380,000
4
750
3,000
8
0.20483
E 211
258,900,500
6
1,300
7,800
115
0.23668
Kisaran, 11 Ju Penawar, CV. DUA WA
FERRY SYA Direktur
HARGA ALAT Rp / Jam
Rp / Hari
372,665.00
1,863,325.00
160,599.79
802,998.96
146,926.00
734,630.00
308,726.00
1,543,630.00
44,366.00
88,732.00
173,510.00
694,040.00
203,676.54
1,018,382.69
158,730.66
793,653.31
191,730.00
440,979.00
30,893.00
154,465.00
76,592.00
191,480.00
33,213.00
83,032.50
172,715.50
863,577.48
HARGA ALAT Rp / Jam
Rp / Hari
372,665.00
1,863,325.00
160,599.79
802,998.96
146,926.00
734,630.00
308,726.00
1,543,630.00
44,366.00
88,732.00
173,510.00
694,040.00
203,676.54
1,018,382.69
158,730.66
793,653.31
191,730.00
440,979.00
30,893.00
154,465.00
76,592.00
191,480.00
33,213.00
83,032.50
172,715.50
863,577.48
li 2012 NA
PUTRA NASUTION
JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE ) PEKERJAAN
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
NO
URAIAN KEGIATAN
BULAN I
HARGA TOTAL BOBOT ( Rp ) (%)
M1
1 Pembuatan / Sewa Kantor Direksi Keet + Gudang
2,000,000.00
1.01
1.01
2 Pengukuran dan Pemasangan Patok Kembali
1,200,000.00
0.61
0.61
3 Tanda Pengaman Lalu Lintas
850,000.00
0.43
0.43
4 Mobilisasi dan Demobilisasi
5,282,000.00
2.68
1.34
I
M2
M3
BULAN II M4
M1
M2
M3
BULAN III M4
M1
M2
M3
BULAN IV M4
M1
M2
M3
M4
PEKERJAAN PERSIAPAN
63.88
II
PEKERJAAN LAPEN SEPANJANG 450 M X 3 M'
1 Pengupasan Tanah dan Pembersihan Semak
55.19
1,406,250.00
0.71
2 Perbaikan Existing dengan Telford / Penambahan Lebar
31,317,911.58
15.89
3 Lapisan Penetrasi Macadam ( Lapen )
153,994,680.69
78.15
0.36
0.35
46.50
1.99
1.99
1.99
1.99
1.99
1.98
1.98
1.98
37.81
8.69 20.43
III
1 Photo Dokumentasi
400,000.00
0.20
0.07
2 Plank Proyek
600,000.00
0.30
0.30
JUMLAH 197,050,842.27
100.00
RENCANA MINGGUAN
8.45 4.47
3.76
0
3.76
12.43
0.36
0.35
1.99
1.99
8.69
8.69
8.69
8.69
8.69
18.38
0.07
14.42 10.44
6.46
4.12
8.69
29.12
16.40
PEKERJAAN LAIN-LAIN
8.69
1.99
1.99
1.99
1.98
1.98
2.05
8.69
8.69
JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE ) PEKERJAAN
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
NO
URAIAN KEGIATAN
BULAN I
HARGA TOTAL BOBOT ( Rp ) (%)
M1
1 Pembuatan / Sewa Kantor Direksi Keet + Gudang
2,000,000.00
1.01
1.01
2 Pengukuran dan Pemasangan Patok Kembali
1,200,000.00
0.61
0.61
3 Tanda Pengaman Lalu Lintas
850,000.00
0.43
0.43
4 Mobilisasi dan Demobilisasi
5,282,000.00
2.68
1.34
I
M2
BULAN II
M3
M4
M1
M2
M3
BULAN III M4
M1
M2
M3
BULAN IV M4
M1
M2
M3
M4
PEKERJAAN PERSIAPAN
63.88
II
PEKERJAAN LAPEN SEPANJANG 450 M X 3 M'
1 Pengupasan Tanah dan Pembersihan Semak
55.19
1,406,250.00
0.71
2 Perbaikan Existing dengan Telford / Penambahan Lebar
31,317,911.58
15.89
3 Lapisan Penetrasi Macadam ( Lapen )
153,994,680.69
78.15
0.36
0.35
46.50
1.99
1.99
1.99
1.99
1.99
1.98
1.98
1.98
37.81
8.69 20.43
III
1 Photo Dokumentasi
400,000.00
0.20
0.07
2 Plank Proyek
600,000.00
0.30
0.30
JUMLAH 197,050,842.27
100.00
12.43
8.45 4.47
3.76
0
8.69
8.69
18.38
0.07
14.42 10.44
6.46
4.12
8.69
29.12
16.40
PEKERJAAN LAIN-LAIN
8.69
RENCANA MINGGUAN
3.76
0.36
0.35
1.99
1.99
1.99
1.99
1.99
1.98
1.98
2.05
8.69
8.69
8.69
8.69
8.69
RENCANA KUMULATIF MINGGUAN
0 3.76
4.12
4.47
6.46
8.45
10.44
12.43
14.42
16.40
18.38
20.43
29.12
37.81
46.50
55.19
63.88
Kisara PENAWAR, CV. DUA WARNA
Dibuat
FERRY SYAHPUTRA NASUTION Direktur
SARIA Tenag
BULAN V M1
M2
M3
M4
KEMAJUAN PEKERJAAN
100.00 100
89.92
81.24
80
1.34
72.56
60
40
8.68
8.68
8.68
8.68
20
0.06 -
8.68
8.68
8.68
10.08
KET
BULAN V M1
M2
M3
M4
KEMAJUAN PEKERJAAN
KET
100.00 100
89.92
81.24
80
1.34
72.56
60
40
8.68
8.68
8.68
8.68
20
0.06 -
8.68
8.68
8.68
10.08
72.56
81.24
89.92 100.00
n, 11 Juli 2012 Oleh,
GINTING a Teknis
JADWAL PENGGUNAAN BAHAN PEKERJAAN
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
NO
URAIAN KEGIATAN
II
PEKERJAAN LAPEN SEPANJANG 450 M X 3 M'
1
Perbaikan Existing dengan Telford / Penambahan Lebar
2
VOL
SAT
BULAN I M1
M2
BULAN II
M3
M4
M1
M2
BULAN III
M3
M4
M1
M2
BULAN IV
M3
M4
M1
M2
M3
Batu Padas 10 - 15 cm
53.56
M3
6.69
6.69
6.69
6.69
6.70
6.70
6.70
6.70
Batu Pecah 5 - 7 cm
21.42
M3
2.68
2.68
2.68
2.68
2.68
2.68
2.67
2.67
Pasir Urug
32.13
M3
4.02
4.02
4.02
4.02
4.02
4.01
4.01
4.01
Batu Pecah 3 - 5 cm
54.00
M3
6.00
6.00
6.00
6.00
Batu Pecah 2 - 3 cm
30.00
M3
3.33
3.33
3.33
3.33
Batu Pecah 1 - 2 cm
14.99
M3
1.67
1.67
1.67
1.67
3.38
M3
0.38
0.38
0.38
0.38
5,940.00 433.93
Kg Ltr
660.00
660.00
660.00
660.00
48.21
48.21
48.21
48.21
Lapisan Penetrasi Macadam ( Lapen )
Pasir Beton Aspal Minyak Bakar
JADWAL PENGGUNAAN BAHAN PEKERJAAN
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
NO
URAIAN KEGIATAN
II
PEKERJAAN LAPEN SEPANJANG 450 M X 3 M'
1
Perbaikan Existing dengan Telford / Penambahan Lebar
2
VOL
BULAN I
SAT
M1
M2
BULAN II
M3
M4
M1
M2
BULAN III
M3
M4
M1
M2
BULAN IV
M3
M4
M1
M2
M3
Batu Padas 10 - 15 cm
53.56
M3
6.69
6.69
6.69
6.69
6.70
6.70
6.70
6.70
Batu Pecah 5 - 7 cm
21.42
M3
2.68
2.68
2.68
2.68
2.68
2.68
2.67
2.67
Pasir Urug
32.13
M3
4.02
4.02
4.02
4.02
4.02
4.01
4.01
4.01
Batu Pecah 3 - 5 cm
54.00
M3
6.00
6.00
6.00
6.00
Batu Pecah 2 - 3 cm
30.00
M3
3.33
3.33
3.33
3.33
Batu Pecah 1 - 2 cm
14.99
M3
1.67
1.67
1.67
1.67
3.38
M3
0.38
0.38
0.38
0.38
5,940.00 433.93
Kg Ltr
660.00
660.00
660.00
660.00
48.21
48.21
48.21
48.21
Lapisan Penetrasi Macadam ( Lapen )
Pasir Beton Aspal Minyak Bakar
PENAWAR, CV. DUA WARNA
FERRY SYAHPUTRA NASUTION Direktur
BULAN V M4
M1
M2
M3
M4
6.00
6.00
6.00
6.00
6.00
3.33
3.33
3.34
3.34
3.34
1.67
1.66
1.66
1.66
1.66
0.38
0.37
0.37
0.37
0.37
660.00
660.00
660.00
660.00
660.00
48.21
48.21
48.21
48.21
48.21
Kisaran, 11 Juli 2012
KET
BULAN V M4
M1
M2
M3
M4
6.00
6.00
6.00
6.00
6.00
3.33
3.33
3.34
3.34
3.34
1.67
1.66
1.66
1.66
1.66
0.38
0.37
0.37
0.37
0.37
660.00
660.00
660.00
660.00
660.00
48.21
48.21
48.21
48.21
48.21
KET
Kisaran, 11 Juli 2012 Dibuat Oleh,
SARIA GINTING Tenaga Teknis
JADWAL PENGGUNAAN ALAT PEKERJAAN KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
NO
II
1
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
URAIAN KEGIATAN
TOTAL WAKTU (JAM)
3
BULAN II
BULAN III
BULAN IV
M1
M2
M3
M4
M1
M2
M3
M4
M1
M2
M3
M4
M1
M2
M3
PEKERJAAN LAPEN SEPANJANG 450 X 3 M'
Pengupasan Tanah dan Pembersihan Semak Alat Bantu
2
BULAN I SAT
0.72
set
5.36
jam
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.43 0.43
0.43
0.43
0.43
0.42
0.36
0.36
Perbaikan Existing dengan Telford / Penambahan Lebar Mesin Gilas 3 Roda 6 - 8 T
Truck Tangki Air
5.36
jam
0.67
0.67
Alat Bantu
3.43
set
0.43
0.43
Mesin Gilas 3 Roda 6 - 8 T
14.46
jam
1.61
1.61
1.61
1.61
Aspal Sprayer 200 L
14.46
jam
1.61
1.61
1.61
1.61
Dump Truck 3,5 T
14.46
jam
1.61
1.61
1.61
1.61
7.87
set
0.87
0.87
0.87
0.87
Lapisan Penetrasi Macadam ( Lapen )
Alat Bantu
JADWAL PENGGUNAAN ALAT PEKERJAAN KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
NO
II
1
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
URAIAN KEGIATAN
TOTAL WAKTU (JAM)
3
BULAN II
BULAN III
BULAN IV
M1
M2
M3
M4
M1
M2
M3
M4
M1
M2
M3
M4
M1
M2
M3
PEKERJAAN LAPEN SEPANJANG 450 X 3 M'
Pengupasan Tanah dan Pembersihan Semak Alat Bantu
2
BULAN I SAT
0.72
set
5.36
jam
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.43 0.43
0.43
0.43
0.43
0.42
0.36
0.36
Perbaikan Existing dengan Telford / Penambahan Lebar Mesin Gilas 3 Roda 6 - 8 T
Truck Tangki Air
5.36
jam
0.67
0.67
Alat Bantu
3.43
set
0.43
0.43
Mesin Gilas 3 Roda 6 - 8 T
14.46
jam
1.61
1.61
1.61
1.61
Aspal Sprayer 200 L
14.46
jam
1.61
1.61
1.61
1.61
Dump Truck 3,5 T
14.46
jam
1.61
1.61
1.61
1.61
7.87
set
0.87
0.87
0.87
0.87
Lapisan Penetrasi Macadam ( Lapen )
Alat Bantu
Kisar PENAWAR, CV. DUA WARNA
Dibua
FERRY SYAHPUTRA NASUTION Direktur
SARI Tena
BULAN V KET M4
M1
M2
M3
M4
1.61
1.61
1.60
1.60
1.60
1.61
1.61
1.60
1.60
1.60
1.61
1.61
1.60
1.60
1.60
0.87
0.88
0.88
0.88
0.88
BULAN V KET M4
M1
M2
M3
M4
1.61
1.61
1.60
1.60
1.60
1.61
1.61
1.60
1.60
1.60
1.61
1.61
1.60
1.60
1.60
0.87
0.88
0.88
0.88
0.88
n, 11 Juli 2012 t Oleh,
GINTING a Teknis
JENIS BAHAN KERJA YANG DIGUNAKAN
PEKERJAAN
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
NO
1 2 3 4 5 6 7
JENIS BAHAN
VOLUME
Batu Padas 10 - 15 cm Batu Pecah 5 - 7 cm
50.00 20.00
Pasir Urug Batu Pecah 3 - 5 cm
30.00 56.00
Batu Pecah 2 - 3 cm
31.11
Batu Pecah 1 - 2 cm
15.55
SATUAN
KETERANGAN
M3 M3 M3 M3 M3 M3 M3
Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri B h d l N i
JENIS BAHAN KERJA YANG DIGUNAKAN
PEKERJAAN
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
JENIS BAHAN
NO
1 2 3 4 5 6 7 8 9
VOLUME
Batu Padas 10 - 15 cm Batu Pecah 5 - 7 cm
50.00 20.00
Pasir Urug Batu Pecah 3 - 5 cm
30.00 56.00
Batu Pecah 2 - 3 cm
31.11
Batu Pecah 1 - 2 cm Pasir Beton
15.55 3.50
Aspal
6,160.00
Minyak Bakar
450.00
SATUAN
KETERANGAN
M3 M3 M3 M3 M3 M3 M3 Kg Ltr
Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri Bahan dalam Negeri
Kisaran, 11 Juli 2012 Diketahui Oleh; CV. DUA WARNA
Dibuat Oleh;
FERRY SYAHPUTRA NASUTION Direktur
SARIA GINTING Tenaga Teknis
DAFTAR DAN HARGA PERALATAN UTAMA
PEKERJAAN
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
NO
NAMA PERALATAN
TAHUN PEMBUATAN
JUMLAH ALAT
MERK ALAT
HARGA
1
MESIN GILAS 3 RODA 6 - 8 Ton
2002
1
SAKAI R25-3
571,988,300
2
WATER TANK TRUCK
2003
1
MITSUBISHI
169,982,800
3
ASPAL SPRAYER 200 L
2000
1
SAKAI AS 155
94,434,200
4
DUMP TRUCK
2007
5
MITSUBISHI
258,900,500
Kisaran, 11 Juli 2012 Diketahui Oleh; CV. DUA WARNA
Dibuat Oleh;
FERRY SYAHPUTRA NASUTION Direktur
SARIA GINTING Tenaga Teknis
DAFTAR PERALATAN YANG DIPAKAI / UTAMA
PEKERJAAN
: LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT
KECAMATAN
: KISARAN BARAT
KABUPATEN
: ASAHAN
NAMA PERALATAN
NO
TAHUN PEMBUATAN
JUMLAH ALAT
MERK ALAT
KETERANGAN
1
MESIN GILAS 3 RODA 6 - 8 Ton
2002
1
SAKAI R25-3
DUKUNGAN
2
WATER TANK TRUCK
2003
1
MITSUBISHI
DUKUNGAN
3
ASPAL SPRAYER 200 L
2000
1
SAKAI AS 155
DUKUNGAN
4
DUMP TRUCK
2007
5
MITSUBISHI
DUKUNGAN
5
ALAT BANTU
2010
3 set
variasi
MILIK
Kisaran, 11 Juli 2012 Diketahui Oleh; CV. DUA WARNA
Dibuat Oleh;
FERRY SYAHPUTRA NASUTION Direktur
SARIA GINTING Tenaga Teknis