Description

JHS #12/10

RAM Rating Rank

8.

Probability

7.

DESCRIPTION OF JOB TASK

Severity P / A / E/ R

JOB STEP NO.

6.22 Slippery hand tools P 2

A

L

HAZARD / THREAT

BARRIER / CONTROL MEASURE

CONSEQUENCES

ACTION PARTIES

RECOVERY MEASURE

To wear semi leather or leather hand gloves (no * cotton gloves)

DISMANTLING OF SCAFFOLDING TANK NDT (RADIOGRAPHY, VACUUM BOX, PENETRANT TEST) & HYDROTESTING (WATER FILLING)

RESPONSIBLE PARTY

(REFER TO ITEMS # 5 : ERECTION / DISMANTLING OF SCAFFOLDING) 8.1

Leakage of radioactive source

P 3 / R

C M

To ensure only competent operator for the work

Inform SMDS

To wear proper apparel & PPE for radiography

Send to Medic

To perform pre-inspection for the tools & the * equipments

Perform investigation

* To inform in the Toolbox Talk / control room To barricade & install signage i.e.'CAUTION. * RADIOGRAPHIC TESTING WORK.

Inform in Toolbox talk

*

Kerosmi - BET HSE Officer

*

Johnny - BET Site Supervisor SMDS Personnel

* To perform pre inspection for the tools To monitor the site closely with collimater (as to * reduce / minimize the source strength from being absorbed by the public) * To equip the machine with warning system * To issue survey meter within the surroundings

Reminder : Workingat-height (height > 1.8mtrs)

To switch off the projector when not in use (i.e. * cover the source with lead shots bags) To follow Radiographic Testing emergency * response plan

BET Supervisor

Accidents / Minor Injury / damage to assest / Stop work

To ensure the souce is closely monitored & * guarded (to prevent lost) To check the enclosed source regularly with survey * meter Reminder : Hot Work

8.2

Chemical & Fume

P

1

B

L * To wear chemical rubber gloves * To wash the apparel or hand gloves after work * To refer to MSDS/CSDS of the product * To use dust mask (cartridge)

8.3

Electrocution

P 4 / A / R

C M

*

Perform investigation Inform in Toolbox talk

*

Johnny - BET Site Supervisor

To pre-inspect on the condition of the equipment

* To perfrom proper earthing comply with SMDS Hot Work Procedure welding) To provide rack for the(for cables (avoid lying on the * ground)

BET SMDS - JHA. Tank Erection. 100810 Page 11 of Page 18

JHS #12/10

RAM Rating BARRIER / CONTROL MEASURE

Rank

HAZARD / THREAT

Probability

DESCRIPTION OF JOB TASK

Severity P / A / E/ R

JOB STEP NO.

RESPONSIBLE PARTY

CONSEQUENCES

RECOVERY MEASURE

Send to Medic

BET Supervisor

Accidents / Minor Injury / damage to assest / Stop work

ACTION PARTIES

To follow SMDS electrical procedure (i.e. only use * low voltage equipment, 1.8mtrs)

To ensure access manhole is not blocked (i.e no * cable air hoses)

Reminder : Confined Space Area

9.2 Insufficient oxygen P 2 supply / A

9.3 Fa lli ng R

P / A

Perform investigation Inform in Toolbox talk BET Supervisor

Accidents / Minor Injury / damage to assest / Stop work

*

Kerosmi - BET HSE Officer

*

Johnny - BET Site Supervisor SMDS Personnel

To monitor & control the movement of personnel * working inside the tank (by the Confined Space Standby) C M To check the breathing apparatus, the air line * system before use To inform both the operator & the Confined Space * standby person on proper communication signal

2C M *

To wear body harness with 2 lanyards & clip to the fix structure while working

* To allow only authorized personnel entering

BET SMDS - JHA. Tank Erection. 100810 Page 13 of Page 18