Resume For The Post of Tank /welding / Piping Inspector.

August 7, 2024 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download Resume For The Post of Tank /welding / Piping Inspector....

Description

CV FOR MECHANICAL / WELDING INSPECTOR. CONSTRUCTION, MAINTENANCE & SHUTDOWN WORK

PAL ANAND KUMAR NEKRAM (API-653, API 510, API 570, CSWIP 3.1, DFT, NDT LEVEL-II- (RT, UT, MT, PT & RTFI) 

EXPERIENCE IN: -

Inspection of:- Above ground storage tanks, AG/UG Piping, Welding activities. 

OBJECTIVES & GOALS. Aspiring, challenging and dynamic career in Mechanical Engineering like Above Ground Storage Tanks (Single/Double deck floating roof, Fixed dome roof, Internal floating roof), AG/UG Piping (Metallic & Nonmetallic), various Welding methods & procedures, Quality controls & Quality assurance, where I can apply and improve my knowledge and experience in new construction projects & rehabilitation work.



PROFILE 



SKILLS AND STRENGTH        



I have More than 15 years of progressive experience for new construction projects & in maintenance field in inspection of Above Ground Storage Tanks, vessels, AG/UG piping in various projects Like Oil & Gas, Petrochemicals & hydro carbon project as well as welding and related activities,.

Adequate knowledge of Inspection at Construction, workshop, and at vendors place. Adequate knowledge of NDT activities. Adequate knowledge in preparation of Hydro test Packages. Adequate knowledge in preparation & implementation of ITP, WPS, PQR & WQT. Adequate knowledge of ASME, API & other International Standards. Capable of handling group of Inspectors and Workmen. Capable to check integrity of above ground storage tank, AG/UG piping & vessels in maintenance field. Rectification work inspection as per ASSET INTEGRITY / Client Recommendation.

EDUCATIONAL & TECHNICAL QUALIFICATIONS      

Diploma in Fabrication Technology from Sir B.P.T.I. (2002-2006) ASNT Level II in UT, RT, PT , MT & RTFI. CSWIP 3.1 (Certificate No. – 80352 - August 2013) API 653 (Certificate No. – 67259 – August 2016) API 510 (Certificate No. – 87879 – February 2019) API 570 (Certificate No. – 90996 – July 2019)



PROFESSIONAL EXPERIENCE:-



CURRENT EMPLOYER: -

TRADING AND AGENCY SERVICES LTD. W.L.L.

    

CLIENT: PROJECT: DESIGNATION: JOBS HANDLED: WORKING PERIOD:

Qatar Petroleum (DUKHAN, ,QATAR) Tank REHABILITATION. Tank Inspector. (Q.P. approved) Above ground storage tanks maintenance. 13th October 2018 to 30th April 2019

    

CLIENT: PROJECT: DESIGNATION: JOBS HANDLED: WORKING PERIOD:

Ras Lafan Oil Company RLOC (RASLAFAN,QATAR) CRACKING FURNACE Rehabilitation on call basis. Mechanical Inspector. Coil Replacement & maintenance. 1st May’ 2019 to 30th Sept’ 2019.

1



    

CLIENT: PROJECT: DESIGNATION: JOBS HANDLED: WORKING PERIOD:

Qatex (Maiseed, QATAR) Tank REHABILITATION. Tank Inspector. Above ground storage tanks Integrity Inspection & maintenance. 1st October 2019 to 30th November 2019.

    

CLIENT: PROJECT: DESIGNATION: JOBS HANDLED: WORKING PERIOD:

Oryx GTL (Raslafan, QATAR) piping & check valve replacement. Welding Inspector (Oryx GTL. approved). piping and check valve replacement & maintenance. 1st December 2019 to 20th April 2020.

ROLES AND RESPONSIBILITIES:  Incoming material inspection.  Stage wise inspection like bevel, joint and final inspection for fabricated items for replacement.  Annealing all old joints for Inconel material coil in furnace before welding.  Inspection of Erection process & material,  Ensuring work done as per client recommendation.  Co-ordinate with NDE parties for RT, PT, and MPI & UT.  RT Film interpretation.  Installation of primary seal & secondary seal of floating roof as per drawing & specification in tanks.  Co-ordinate with clients & TPI for stage & final inspection.  Preparing documents stage wise.  Final inspection.  Leak test/Hydro Pneumatic Test.  Box-up & Hand Over.  Final Dossier submission.

 EMPLOYER: -

Punjlloyd Oil and Gas. PETRONAS. R.A.P.I.D. (PENGRANG, MALASIYA) Mechanical Sr. QA/QC Engineer (Tanks). Above ground storage tanks. 9th January 2017 to 4 February 2018.

    

CLIENT: PROJECT: DESIGNATION: JOBS HANDLED: WORKING PERIOD:

    

EMPLOYER: CLIENT: PROJECT: DESIGNATION: JOBS HANDLED:



WORKING PERIOD:

L & T Hydrocarbon Ltd. RELIANCE. RIL-J3 (JAMNAGAR, INDIA) Mechanical Sr. QA/QC Engineer. Inspection of Fabrication & Erection. Of above ground and Underground Plant piping. 30thDecember 2013 to 30th Sept’2016

     

EMPLOYER: CLIENT: PROJECT: DESIGNATION: JOBS HANDLED: WORKING PERIOD:

Gussat Construction Co Limited. DAELIM. SADARA ISOCYANATES PROJECT. (K.S.A) Mechanical QC Inspector. Fabrication & Erection of above ground tanks. 05th Nov 2011 TO 7th Sept 2013.

2

  

EMPLOYER: Designation: Jobs handled:

Link Middle East (RasalKhama, UAE). QUALITY ENGINEER. High Defence fencing System & Structures like Columns. Tie beams, Bracings for piping platform, Chiller piping at A3 JLT, Replacement of Expansion bellows etc. 29th July 2010 TO 6 Sept 2011.



Working Period:

   

EMPLOYER: PROJECT: Designation: Jobs handled:



Working Period:

Hindustan Dorr-Oliver Ltd. NALCO & VEDANTA Project. QUALITY ENGINEER Columns, Heat Exchangers, Pressure Vessels, Filters, Storage tanks, Chimneys, Ducts, HRD & DCAW tanks etc. 6th October 2007 to 21st July 2010.

   

EMPLOYER: Designation: Jobs handled: Working Period:

Inox India Ltd. QUALITY JUNIOR ENGINEER Cryogenic Vessels. 16th July 2006 TO 19th August 2007.

   

EMPLOYER: Designation: Jobs handled: Working Period:

Suzlon Structures Pvt. Ltd. Junior Tr. Engineer.(QA/QC) Tabular Towers for wind mills 23rd December 2005 TO 08th July’ 2006.

WORKED AND EXPERIENCED IN:

Preparation & implementation of QAP/ITP, WPS, PQR & WPQ.



Conduct Welder Qualification Test.



Well conversant with NDT Technique like: - RT, UT, MPT, PT, VT.



Incoming Inspection of the plates, Pipes, Forgings & fittings as per standards.



Stage wise inspection of fabricated items like marking, cutting, bending of the tank parts Like Annular plate, Sketch plate, bottom plate, shell plate, roof plate, nozzles, Manholes, spiral stairways, roof platform, “V” preparation of plates where required, and Raise FIR/RFI as per QAP,Drawings & Standards



Stage wise inspection of erection of Tanks and piping like fit-up,



Material identification, Peaking, bending, plumbing, Straightness etc.



Making Stage wise quality Reports and get signed by client/TPI.



Arrange Client Inspections/TPI inspection as per ITP (QAP).



Stage wise inspection as per ITP from initial TO final stage.



Inspection at site for structure, piping & tanks fabrication & erection.



Worked in materials like: - C.S, S.S, duplex, Inconel, Monel, GRVP(Glass reinforced Vinyl), HDPE & alloy steels Like P5, P22, and P11 Etc.



HDPE line fusion welding & GRVP line rapping, coating & hydro test.



Inspection & Expediting at vendors for various vessels, dished ends, valves, conveyor systems, Magnetic cranes, Rubber Lining works & for tank material Cutting etc.



Tank Maintenance activities as per client recommendations.

3



PERSONAL INFORMATION. 

Name

: PAL ANAND KUMAR NEKRAM.



Address

: PLOT No - 68/B, Dwarkesh Nagar, Chhani, Baroda, Gujarat, India. Pin:- 391740.



Contact No

: +91 8849496873.



E-Mail Address

: [email protected].



Birth Date / Birth Place

: 5th JUNE 1984 / Utter Pradesh, INDIA.



Passport No.

:P 4989177 ISSUE DATE: - 29/09/2016 //EXP DATE: -28/09/2026



Nationality

: INDIAN.



Language Proficiency

:Able to communicate via verbal & written in 1. English 2. Hindi3. Gujarati



Hobby

: Travelling, Reading, Net-surfing, visiting good places.



Computer Knowledge

: Familiar with MS word, Excel, Power point, AutoCAD. & as required.



I have working experience in INDIA, MALAYSIYA, K.S.A, U.A.E, QATAR)

 I hereby declare that the above information is true and correct to the best of my knowledge and belief.

Signed, Pal Anand Kumar N

4

API Individual Certification Programs verifies that

Pal Nekram Anand Kumar has met the requirements for API certification

API-653 Aboveground Storage Tank Inspector 67259

Certification Number Original Certification Date

August 31, 2016

Current Certification Date

August 31, 2019

Expiration Date

August 31, 2022

API Individual Certification Programs verifies that

Pal Nekram Anand Kumar has met the requirements for API certification

API-570 Piping Inspector 90996

Certification Number Original Certification Date

July 31, 2019

Current Certification Date

July 31, 2019

Expiration Date

July 31, 2022

API Individual Certification Programs verifies that

Pal Nekram Anand Kumar has met the requirements for API certification

API-510 Pressure Vessel Inspector 87879

Certification Number Original Certification Date

February 28, 2019

Current Certification Date

February 28, 2019

Expiration Date

February 28, 2022

Scanned by CamScanner

Name

:

PAL ANANDKUMAR NEKRAM

PSNo

:

20065113

Date of joining the Company

:

31-Dec-2013

Date of leaving

:

30-SEP-2016

Entity

:

L&T HYDROCARBON ENGINEERING LIMITED

Unit/IC

:

CONSTRUCTION SERVICES HYDROCARBON ENGINEERING

Department

:

LE130446

Location

:

AHMEDABAD

Grade at the Time of Separation

:

FTC

Designation at the time of Separation

:

SR.ENGINEER (MECH)-QA & QC

Reason For Separation

:

RESIGNATION

for LARSEN & TOUBRO LIMITED

NIRAJ D JAIN (HEAD - RETIREMENT BENEFITS AND F&A, SSC) ͩͪͪͪͪͪͩͩͭͭͪͭͭͪͩͭͪͪͩͭͩͩͭͭͭͩͪͪͭͩͪͭͪͪͩͩͩͭͩͪͪͪͭͩͪͪͪͪͪͩ ͩͩͩͩͩͩͪͭͭͩͭͪͪͩͪͩͪͪͪͭͩͭͪͪͪͪͩͩͪͩͭͭͪͪͩͩͪͪͩͪͩͪͩͭͪͩͩͩͩͩ ͩͪͪͪͩͭͪͪͩͭͪͪͭͪͪͭͩͪͪͭͩͪͪͪͩͪͭͩͪͪͭͪͩͩͩͩͩͭͩͩͭͪͩͪͪͪͩ ͪͪͪͪͪͪͪͪͭͩͭͩͩͭͪͭͪͪͭͪͩͭͪͪͩͪͩͪͪͭͪͪͭͪͪͭͪͭͩͭͩͪͭͩͪͪͪͪͪͪͪ ͩͪͭͭͩͪͪͭͭͩͪͩͩͪͪͩͪͩͩͪͭͩͪͪͪͪͩͩͪͩͭͭͩͪͭͪͩͩͩͩͩͩͩͭͭͩͭͪͪͪͪ ͭͩͩͪͪͪͪͪͪͩͩͭͩͪͩͭͭͭͭͩͩͩͪͩͭͭͭͪͭͭͭͭͪͪͭͩͭͪͩͩͭͭͩͪͪ ͩͪͪͪͭͩͪͭͪͭͭͪͪͭͩͩͭͩͭͪͩͩͪͩͩͪͪͩͩͩͪͩͩͩͭͪͪͪͪͩͪͩͩͪͩͩͪͪͩ ͪͭͪͩͪͪͪͭͪͪͭͪͭͩͪͪͪͭͩͪͩͪͭͪͪͩͭͩͭͩͭͩͩͪͭͪͩͩͭͩͪͩͭͪͩͭͩ ͪͪͪͭͪͪͭͭͭͪͭͩͭͪͪͩͪͭͩͭͩͭͪͪͩͩͪͩͪͩͪͭͭͭͪͭͩͪͩͪͭͩͪͩͩͪͩͪͪ ͩͩͩͭͭͪͭͩͭͪͪͭͭͪͪͭͪͩͪͩͪͩͪͪͪͩͩͭͭͭͭͩͩͩͩͩͭͩͭͪͪͩͩͩͩͭͪͭͪ ͩͭͩͪͩͭͩͭͩͩͩͪͭͩͪͩͭͭͩͩͪͭͭͪͪͪͩͩͩͩͭͩͭͪͩͪͪͩͪͩͩͩͭͭͩͪͩͭͪͩͩͩͪͪ ͪͭͩͭͭͪͭͪͪͩͩͭͭͩͭͭͪͭͩͭͭͭͭͪͪͪͩͪͪͭͭͭͪͭͩͪͪͭͭͭͩͪͩͩͩͩͭͪ ͪͪͭͭͭͭͪͪͭͪͩͩͭͩͩͭͭͪͩͭͩͪͪͭͪͭͪͪͩͪͭͩͭͭͭͭͪͩͪͪͩͪͭͭͪͩͩͪͩͩͭͩ ͪͩͪͭͩͪͪͪͩͩͪͩͪͪͭͪͭͩͩͪͪͪͭͭͭͪͪͩͭͭͭͭͩͩͩͩͪͩͭͪͪͪͪͭͪͩͪͪ ͪͩͪͭͭͪͪͪͭͪͩͩͭͭͪͪͪͩͭͪͩͭͩͭͪͪͪͩͪͩͪͭͩͩͩͭͩͩͭͩͩͪͩͩͪͪͩͪͩ ͩͩͪͪͪͩͭͭͭͪͪͩͩͭͩͪͭͪͩͪͭͩͩͪͪͪͩͭͩͭͭͪͭͭͪͪͩͩͪͩͪͪͪͩͩͪͩ ͩͩͭͪͩͪͩͩͪͪͭͭͭͩͩͪͩͪͭͩͩͭͭͩͪͩͪͪͩͩͭͭͭͩͩͪͩͩͭͭͪͩͪͩͭͩͪͪ ͩͩͭͩͪͪͪͪͭͪͭͩͪͩͭͩͭͭͩͩͭͩͩͪͪͪͩͩͩͪͭͭͩͩͭͩͪͩͪͭͭͭͩͩͩͩͪͪͩͩͩ ͭͪͪͪͪͭͪͩͪͭͪͪͩͪͭͪͩͪͪͭͩͩͪͭͭͪͩͩͪͪͩͭͪͪͩͪͩͭͪͪͩͭͭͭͩͭͪͪͪͩͭͩͩͭͪ ͭͭͩͪͭͩͪͪͭͪͭͩͪͭͭͪͭͪͩͭͭͪͪͭͩͭͩͩͪͩͪͭͭͪͪͩͭͩͭͩͭͭͪͭͭͩͪͩͭͪͭͩ ͩͭͭͪͪͭͪͪͪͩͩͭͭͭͭͪͩͩͪͭͩͪͪͪͭͭͭͪͩͩͩͩͩͩͪͭͩͪͩͪͩͩͪͪͩͩͩͩͩͪ ͪͪͪͪͪͩͩͪͪͭͪͪͭͭͪͩͭͪͪͭͭͩͪͪͪͭͩͩͪͪͭͩͭͪͩͩͭͭͪͪͩͩͪͩͭͩͩͩͩͭͪ ͭͩͪͭͩͪͩͪͩͪͩͪͪͭͩͪͩͩͭͪͩͪͩͭͩͩͩͭͭͩͪͭͪͭͩͪͩͩͭͭͩͪͭͩͭͩͭ ͭͪͪͪͪͪͭͭͪͩͭͪͭͩͪͭͪͪͩͩͪͭͪͩͪͪͭͪͪͭͪͭͭͭͭͪͩͩͭͩͩͩͩͪͭͩͪͩͭͪͩ ͪͭͭͩͩͭͪͭͭͭͭͪͭͩͩͩͪͩͭͩͭͪͩͩͭͩͭͩͩͩͭͩͭͪͪͭͭͭͭͩͪͭͩͪ ͩͩͭͩͪͩͭͭͩͩͪͩͪͪͪͪͩͭͩͪͩͭͪͩͪͩͩͩͭͭͩͭͪͪͪͩͩͭͭͩͩͪͩͪ ͩͩͪͪͪͩͩͭͩͪͪͪͭͭͩͩͭͩͩͩͩͭͪͪͩͪͪͭͭͪͭͪͩͪͩͪͪͪͪͪͭͪͭͩͩͩͭͩͭͭͩͩͩͪ ͭͪͩͪͪͩͪͩͩͭͭͩͩͩͪͭͩͭͪͩͩͩͩͭͩͭͪͪͪͩͭͭͪͪͭͩͭͭͪͭͪͭͭͩͩͭͪͩ ͪͪͪͪͪͭͭͭͭͪͩͪͩͩͪͪͭͩͪͪͪͭͩͪͪͪͩͪͪͪͭͪͩͭͪͭͪͩͩͭͭͭͭͪͩͪͪͪͩͩͩͭͪ ͩͪͪͪͪͪͩͭͪͩͭͩͪͪͪͭͩͭͩͭͭͭͩͪͩͭͭͩͭͭͩͭͭͭͪͪͭͭͩͩͭͩͪͩͭͪͭͩ ͩͩͩͩͩͪͭͩͭͩͩͭͭͪͪͪͩͩͭͩͭͭͪͪͪͩͩͭͩͭͭͭͪͩͩͪͭͩͩͩͩͩͩͩͪͩͩͩͪͩͩͪ ͩͪͪͪͩͭͪͪͩͪͭͪͩͭͭͩͭͭͭͭͩͭͭͪͭͩͭͭͩͩͩͭͪͩͩͩͩͭͭͭͩͭͪͭͪͩͩ ͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪͪ

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF