BTS 3900 ATP 27_4_2011_v1.1 IDU

November 11, 2017 | Author: Abubakar Ayub | Category: Electrical Wiring, Cable, Electrical Connector, Battery (Electricity), Electricity
Share Embed Donate


Short Description

Download BTS 3900 ATP 27_4_2011_v1.1 IDU...

Description

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

1-38

BTS 3900 ATP Site Id and Name: BTS 3900 ATP Snags Classification ATP Date

Snag Details

Workma nship Factor( WM) *

Product Factor (PrF)

Note: * WF: Means Snags reported due to Workmanship /Human Factor.(Technical Expertise , Skills lacking. Poor Workmanship etc) PrF: Means Snags reported due to Product Factor/Issues (Product & Design issues/flaws, High fault rate etc) PF: Means Snags reported due to Planning factor/Issues (Poor planning and Management etc).

Plannin g Factor (PF)

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

2-38

ATP Summary

S. No.

Test Items

Total

Status Pass

T01

Hardware Acceptance Items

T01-01

Cabinet Installation

8

T01-02

Antenna System Installation

6

T01-03

Module Installation

2

T01-04

Trunk Cable & Signal Cable Installation

13

T01-05

Power Cables & PGND Cables

5

T02

Power ON Test

T02-01

Power Distribution

8

T02-02

Board Indicators

3

T02-03

Charging & Discharging of Storage Batteries

17

T01

O&M Function

T01-01

Logging in to the Site Maintenance Terminal

15

System T01-0701

Site Reset in levels

1

T01-0803

Channel Status Check

5

T01-11

Boards Operations

2

T03

RF Specification

Fail

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01 VSWR of the Antenna T03-0101

3-38 3

System

29 T03-0102

DRFU Antenna Power

T02

Service Items

T02-01

Basic Services

3 T02-02

Switching on an MS

1 T02-01

Voice & Data Calls Test

1 T01-0803

Call Status on DRFU

T02-0103

Synchronous Handover

3

T02-0104

BCCH TRU Mutual Aiding

1

T02-0105

Frequency Hopping

4

Function

T03-02

External Alarms

16

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

4-38

Part I: OFF-LINE TEST

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

5-38

T01 Acceptance Items for Hardware Installation T01-01 Acceptance Items for the Installation of BTS3900 GSM Cabinet T01-0101 Acceptance Items for BTS3900 GSM Installation Purpose Verify that the installation of integrated equipment of BTS3900 indoor cabinet complies with the corresponding engineering specifications. Prerequisite The BTS3900 cabinet is already installed. Test Procedure

Expectation

Result

1.

Check the position of cabinet.

The placement of the BTS3900 cabinet complies with the engineering design.

Pass Fail Not Run Zapped

2.

Check the installation position.

When installed against the wall, the back of the cabinet must be 0 mm to 98 mm away from the wall. The cabinet is located near the feeder encapsulation window to minimize the length of the feeder. A height of at least 200 mm is spared for routing the feeder on the top of cabinet. The BTS cabinet can be installed side by side with the cabinet of other equipment.

Pass Fail Not Run Zapped

3.

Check all bolts, flat washers, and spring washers.

All bolts are fastened. The spring washer is installed between the bolt and the flat washer. The base (anchor) fits into the expansion bolt holes properly.

Pass Fail Not Run Zapped

4.

Check the connection between the cabinet and the base.

The cabinets are securely connected to the bases and are stable.

Pass Fail Not Run Zapped

5.

Check the horizontal error and vertical error.

The horizontal error of the cabinets is less than 3 mm and the vertical error is not more than 3 mm.

Pass Fail Not Run Zapped

6.

Check the installation of the base.

If no ESD floor is equipped to the equipment room, install the base. If the ESD floor is equipped to the equipment room, install the support and the base. The surface for laying the ESD floor must not be higher than the lower surface of the base; otherwise, the heat dissipation of the base is affected.

Pass Fail Not Run Zapped

7.

Check the cleanness and labels.

Clean both inside and outside surface of the cabinet. The surface of cabinet is clean. The paint is intact. The labels are correct, clear, and intact.

Pass Fail Not Run Zapped

8.

Check the front door of the cabinet.

The front door of the cabinet opens and closes easily. .

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

6-38

Remarks None.

T01-0102 Acceptance Items for BTS3900 GSM Antenna Installation Purpose Verify that the antenna system installation meets the engineering requirements. The engineering parameters of antenna are as follows: Prerequisite The antenna system is already installed Test Procedure

Expectation

Result

1. Check the feeders.

1) The feeders are correctly connected and arranged in the right sectors. (2) The feeders are arranged orderly and neatly. (3) The labels are attached in compliance

Pass Fail Not Run Zapped

Connection Grounding Arrangement label

with the engineering specifications.

2. Check the grounding bar. (1) Grounding (2) Insulation

3. Check the antenna installation.

4. Check the jumpers. Connector Bending

5. Check whether antenna tilt and orientation mechanical clamps available 6. Check RF Antenna type along with TMA installed as per RF nominal Plan.

The outdoor grounding bar is connected to the underground grounding grid through a dedicated route. The indoor grounding bar is connected to the outdoor grounding bar or is directly grounded nearby. The grounding bar is insulated from the wall. The grounding cable is as short as possible. The antenna is installed in compliance with the engineering specifications, such as the position, azimuth, and down tilt. The connectors of all the outdoor jumpers are waterproofed. Waterproof curves are made for the jumpers. The bending radius of the jumper should be 20 times larger than its diameter. The antenna mechanical clamps are installed properly. Antenna tilt and orientation can be done.

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped Check whether Antenna type is installed as per RF Nominal Plan. Mention Antenna make and model below: Sector 1:

Sector 2:

Sector 3:

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

7-38

Remarks None.

T01-0103 Acceptance Items for Module Installation Purpose Verify that the installation of the module complies with the corresponding engineering specifications. Prerequisite All the modules are installed. The ends of all power cables are coated with protective sleeves. Test Procedures

Expectation

Result

1.

Check whether the BBU, the GRFU/DRFU modules are correctly installed.

They are correctly installed.

Pass Fail Not Run Zapped

2.

Check whether the screws for fastening the modules are secured on the cabinet.

The screws for fastening the modules are secured on the cabinet.

Pass Fail Not Run Zapped

Remarks None

T01-0104 Acceptance Items for Installation of Trunk Cables and Signal Cables Purpose Verify that the installation of the trunk cables and signal cables complies with the corresponding engineering specifications. Prerequisite The trunk cables and the signal cables are installed. Test Procedures

Expectation

Results

1.

Check the cabling.

The cabling meets the engineering specifications, without cable crossover and damage. The cabling facilitates maintenance and further capacity expansion. The trunk cables and power cables are placed respectively.

Pass Fail Not Run Zapped

2.

Checking the trunk cables:

(3)

Pass Fail Not Run Zapped

(1)

Connector

(2)

Bending

The connectors of trunk cables are intact. The connectors of E1 cable are reliable and intact.

(4)

The turning radius of coaxial cables is kept no less than 40 mm to prevent the wire core

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

8-38

from being damaged. 3.

4.

Checking the cable ties

Check the cables on the cable rack.

(1)

The cables ties face the same direction. The cable ties in the equivalent position must be in a horizontal level.

(2)

The extra part of the cable ties is evenly cut off and the cut surface does not have any sharp edges.

(3)

No cable tie is wounded up.

(4)

In the outdoor environment, each cable tie has a reserved length ranging from 3 mm to 5 mm.

(1)

The cables on the cable rack are neatly bound.

(2)

The cables are bound neatly and tightly. The cable ties are evenly spaced.

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

5.

Check the cables in the cabling trough.

The cables laid in a cabling trough may be bundled or not. If the cables are laid in a cabling trough, they are laid neatly without crossover and do not overrun the trough. The cables are tied when led into and out of the trough or when converting into another direction.

Pass Fail Not Run Zapped

6.

Check the margin of trunk cable.

When trunk cables are laid in overhead and under floor cabling mode, a little margin is left at turns at the bottom of racks.

Pass Fail Not Run Zapped

7.

Check the cable labels.

Both ends of trunk cables are stuck with standard engineering labels to identify the position of the cables. The labels are clear.

Pass Fail Not Run Zapped

8.

Check RF cables:

(3)

Pass Fail Not Run Zapped

(1)

Installation

(2)

Cabling

The connectors of the RF cables are fixed in position to avoid false connection that may cause an abnormal voltage standing wave ratio (VSWR). The RF cables are intact.

(4)

The horizontal RF cables are clamped into the cable trough.

(1)

The cables are neatly connected to the power port of each module.

(2)

Cables with an extra length are reserved at the connectors.

(1)

The two ends of the CPRI cable is neatly connected.

(2)

The CPRI cables neatly and tightly bound. The cable ties are evenly spaced and face the

9.

10.

Check power cables.

Check the CPRI cable

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

9-38

same direction. (3)

Proper surplus length is reserved for the CPRI cables near connectors for easy inserting and pulling of the connectors.

11.

Check the ports of modules.

The unused ports are covered with dust-proof covers and matching plugs.

Pass Fail Not Run Zapped

12.

Check the installation of indoor jumpers.

(1)

The indoor 1/2-inch jumpers are distributed according to the layer and sector.

Pass Fail Not Run Zapped

(2)

The indoor 1/2-inch jumpers are kept straight for 300 mm at their joints with the cabinet.

13.

Check the environment monitoring cables.

The environment monitoring cables are securely and neatly installed.

Pass Fail Not Run Zapped

Remarks None.

T01-0105 Acceptance Items for Power Cables and PGND Cables Purpose Verify that the power cables and PGND cables are correctly processed and installed. Prerequisite None. Test Procedures

Expectation

1.

(1)

The PGND cable is green and yellow.

(2)

The –48 V power cable is blue.

(3)

The connectors in use on the power cables are capped with protective sleeves.

(4)

All the power cables and grounding cables are copper-core cables. The outer diameter of the external power cables and grounding cables is about 11 mm.

(1)

Labels are attached to ends of the power cables and PGND cables.

(2)

The power cables or grounding cables are not short-circuited or connected reversely.

(3)

The power cables or grounding cables are not damaged or broken.

(4)

There are no connectors or

2.

Check the specifications of power cables and PGND cables.

Check the labels and power cables.

Result Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

10-38

joints on the power cables or grounding cables. 3.

4.

5.

Check the connectors and wiring terminals of power cables and PGND cables.

Check the layout of power cables and PGND cables.

Check system grounding requirements.

(1)

Pass Fail Not Run Zapped The lugs at both ends of the power cable or the PGND cable are securely soldered or crimped.

(2)

The bare wires and lug handles at the wiring terminals are tightly wrapped up with insulation tapes or heat-shrinkable tubes.

(3)

Flat washers and spring washers are securely and closely mounted on wiring terminals.

(1)

The power cables and PGND cables are bound separately from other cables. The extra part of cables are trimmed rather than coiled up.

(2)

Breaking devices such as switches and fuses are not included in the electric connection of the grounding system.

(1)

The diameter of the positive pole of the primary power supply connected to the earth complies with the engineering specifications.

(2)

The working grounding and protection grounding of the BTS and the surge protection grounding of the building share one group of grounding

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

Remarks None.

T01-02 Acceptance Items for Power-on Test T01-0201 Acceptance Items for Power Distribution Purpose Verify that the power distribution of the BTS3900 works properly. Prerequisite The external –48 V DC power supply system works properly. Test Procedures

Expectation

1.

(1)

Check the -48 V DC power cables of

The -48 V DC power cable (blue) is connected to the

Result Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01 cabinet.

11-38

NEG(-) terminal on the DCDU-01 power input terminal block. (2)

The PGND cable (black) is connected to the RTN(+) terminal on the DCDU-01 power input terminal block.

2.

Check the input voltage.

Measure the input voltage by using a multimeter. The input power complies with the standard.

Pass Fail Not Run Zapped

3.

Set the switch to ON to enable the power module.

The power module runs properly.

Pass Fail Not Run Zapped

4.

Check the DCDU voltage.

The output voltage of the DCDU-01 module ranges from -38.4 V DC to -57 V DC.

Pass Fail Not Run Zapped

5.

Check the power-on of modules.

Set the BBU switch on the DCDU-01 module to ON.

Pass Fail Not Run Zapped

The power-on of each module is normal. 6.

Power off the BBU and then power on it

The states of the RUN indicators on the GTMU module change from off to on (including the state of blinking). All the modules work properly.

Pass Fail Not Run Zapped

7.

Power off the GRFU/DRFU module and then power on it

The LED works properly: the RUN LED blinks, the ALM LED is off steady, the ACT LED is on steady, the VSWR LED is off steady, and the green LED labeled CPRI0 and CPRI1 are on.

Pass Fail Not Run Zapped

8.

Power off the FAN and then power on it

The RUN LED on the panel blinks normally to indicate the normal running of the board. The board is in normal operation.

Pass Fail Not Run Zapped

Remarks Test engineers must wear ESD wrist straps or ESD gloves.

T01-0202 Acceptance Items for Board Indicators

Purpose Verify that the indicators on each board work properly. Prerequisite The BTS is powered on or running. Test Procedures

Expectation

1.

Check the board indicators.

2.

Running

The board indicators display the running status of boards. For example, the generation and clearance of alarms are displayed

Result

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01 3.

Status

exactly and in time during power-on and loading.

12-38 Pass Fail Not Run Zapped

The indicators work properly when the boards run properly. Remarks Pay attention to the running status of the indicators on the GTMU, GRFU/DRFU when the BTS is powered on or reset.

T01-0203 Charging & Discharging of Storage Batteries Purpose Verify that the storage batteries can be normally charged and discharged after the mains power supply for the BTS3009 cabinet is switched on.

Prerequisite The BTS is powered on or running. Test Procedures

Expectation

1. Check the current of the

Start the Site Maintenance Terminal System. Query the current of the storage battery (1) Select the target module and double-click View Resource. The View Resource dialog box is displayed. (2) Select Current of battery from the Select Resource Type drop-down list box. The current of the battery is a positive value,

storage battery

Result

Pass Fail Not Run Zapped

indicating that the battery is being charged. 2. Switch off the mains power supply and query the Current of battery again. 3. Switch on the mains power supply. 4. Check the inter-connection of battery

5. Check the labeling of battery cables 6. Check the voltage of battery. 7. Battery bank specs & BOQ

8. Quantity of banks 9. Batteries physical condition

10. Capacity & Rating of banks

The current of the battery is a negative value, indicating that the battery is being discharged. The current of the battery can be queried. The inter-connection of each battery is proper. The three 50AH bank is connected in loading sharing mode. The total capacity is 150AH. The label of battery cables are marked properly. The detail will be filled in the table as follows: Check that battery banks specs as provided as per approved BOQ. i.e. (12V/Cell, 150Ah & 155Ah) Check that battery banks are provided for cabinet site as per approved BOQ Check that the batteries condition is good i.e. batteries are not damaged/swollen Check that all the battery banks and cells are provided of same capacity rating i.e. (Voltages, Amp Hour)

Pass Fail Not Run Zapped Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped Pass Fail Not Run Zapped Pass Fail Not Run Zapped Pass Fail Not Run Zapped Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01 11 Health check of battery banks 12. Voltage measurement of batteries 13. Battery heath check 14. Battery heath check 15. Battery heath check 16. Battery heath check 17. Battery heath check REMARKS:

PTML standard battery health check template (attached) is attached with ATP documents for battery testing. Take the complete cell by cell voltage readings before commencing battery test. Shutdown the AC Input supply of Rectifier to take batteries on load Check the batteries feeding power to load after disconnection of AC power Take the complete bank & cell voltage readings after every 30 mins Check that tested battery backup for cabinet is as per designed backup Is tested battery backup is up to/greater than designed backup

13-38

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped Pass Fail Not Run Zapped Pass Fail Not Run Zapped Pass Fail Not Run Zapped Pass Fail Not Run Zapped Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

14-38

Huawei Representative

PTML Representative

Name:_____________________

Name:_____________________

Signature:__________________

Signature:__________________

Date:______________________

Date:______________________

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

15-38

Part II: ON-LINE TEST

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

16-38

T01 O&M Function Acceptance Items T01-01 Login T01-02 Logging In to the Site Maintenance Terminal System Objective Verify that you can log in to the Site Maintenance Terminal System and implement O&M operations through the system. Prerequisites 

The BTS operates normally.

The Ethernet cable between the Site Maintenance Terminal System and the BTS is connected properly. Procedure

Expected result

Result

Start and log in to the Site Maintenance Terminal System.

You can log in to the Site Maintenance Terminal System and implement O&M operations.

Pass Fail Not Run Zapped

(1)

Choose User Management > Login to display the Log in dialog box.

(2)

Enter your user name and password and click OK.

Remarks None

T01-03 Site Management Right T01-0301 Site Management Right Objective Verify that you can obtain and release site management right through the Site Maintenance Terminal System. Prerequisites 

The Site Maintenance Terminal System and the BTS communicate normally.

You have logged in to the Site Maintenance Terminal System successfully. Procedure

Expected result

1.

Obtain the site management right.

1.

The site management right is obtained.

(1)

Click Site and then double-click Site management right in the right pane.

(1)

The system prompts that the site management right is obtained successfully.

(2)

(2)

Click Get in the Site Management Right

One minute after the serial port cable is removed .the site management right is released.

Result Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

17-38

dialog box. (3)

Remove the Ethernet cable between your PC and the BTS and wait for one minute, and then check whether the site management right is released.

2.

Release the site management right.

(1)

Click Site and then double-click Site management right in the right pane.

(2)

Click Release in the Site Management Right dialog box.

(3)

Check whether the site management right is released.

The system prompts that the site management right is released successfully.

Pass Fail Not Run Zapped

Remarks 

After obtaining the site management right, you can perform operations and maintenance on the BTS through the Site Maintenance Terminal System, but you cannot write data to the BTS through the remote Site Maintenance System.

After releasing the site management right, you cannot carry out operations such as resetting of the BTS, but can only read data from the BTS through the Site Maintenance Terminal System.

T01-04 Logout T01-0401 Normal Logout Objective Verify that you can log out of the Site Maintenance Terminal System under normal conditions. Prerequisites 

The BTS operates normally.

The Site Maintenance Terminal System and the BTS communicate normally. Procedure

Expected result

1.

Choose Maintenance > Quit to log out of the Site Maintenance Terminal System.

The Site Maintenance Terminal System window is closed.

Pass Fail Not Run Zapped

2.

Change the site management state through the remote Site Maintenance System.

You can change the attributes of the operation objects through the remote Site Maintenance System.

Pass Fail Not Run Zapped

Remarks

Result

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

18-38

After you log out of the Site Maintenance Terminal System, the site management right is handed over to the remote Site Maintenance System automatically.

T01-05 Topology Management T01-0501 Topology Management Objective Verify that you can view the Topology Management through the Site Maintenance Terminal System. Prerequisites 

The Site Maintenance Terminal System and the BTS communicate normally.

Procedure

Expected result

Result

3.

Click Board. Double-click Board Management.

The Board Management window is displayed.

Pass Fail Not Run Zapped

4.

In the Board Management window, double-click GTMU.

The Topology Management window is displayed, ensure the consistency between the hardware installation and the data configuration.

Pass Fail Not Run Zapped

Remarks None.

T01-06 Resource Viewing T01-0601 Resource viewing Objective Verify that you can view the resources through the Site Maintenance Terminal System. Prerequisites The Site Maintenance Terminal System and the BTS communicate normally. Procedure

Expected result

5.

Click Site and then double-click View Resource in the right pane of the Site Maintenance Terminal System window.

The View Resource dialog box is displayed.

Pass Fail Not Run Zapped

6.

Choose a resource item in Select Resource Type.

The status of the resource can be refreshed in the View Resource dialog box in a real time manner.

Pass Fail Not Run Zapped

Remarks None

Result

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

19-38

T01-07 Equipment Management T01-0701 Site Reset Hierarchically Objective Verify that the site can be reset hierarchically through the Site Maintenance Terminal System. Prerequisites 

The Site Maintenance Terminal System and the BTS communicate normally.

You have obtained the site management right through the Site Maintenance Terminal System. Procedure

Expected result

Result

1.

Click Site and then double-click Site Reset Hierarchically in the right pane of the Site Maintenance Terminal System window.

(1)

The Site Reset Hierarchically dialog box is displayed.

Pass Fail Not Run Zapped

(2)

The system prompts that the hierarchical reset is successful.

(3)

The Site Reset Hierarchically dialog box is displayed.

2.

Select Third Level Reset and then click OK.

(4)

The system prompts that the hierarchical reset is successful.

3.

Click Site and then double-click Site Reset Hierarchically in the right pane of the Site Maintenance Terminal System window.

4.

Select Forth Level Reset and then click OK.

Remarks 

After the site is reset, it is re-initialized. During the re-initialization course, no operations on the site can be carried out. When the Site Maintenance Terminal System window is refreshed, it means the re-initialization is complete.

During the third level reset, only the data is loaded while program is not.

T01-0702 Cell Management State Changes Objective Verify that the cell management state can be changed through the Site Maintenance Terminal System. Prerequisites 1.

The Site Maintenance Terminal System and the BTS communicate normally.

You have obtained the site management right through the Site Maintenance Terminal System. Procedure

Expected result

1.

Block the cell

(1)

(1)

Click Cell and then double-click Change Cell Management

The Change Cell Management State dialog box is displayed.

(2)

A prompt "Changing state

Result

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01 State in the right pane of the Site Maintenance Terminal System window. (2)

Choose LOCKED and then click OK.

(3)

Obtain the cell attributes and the attributes of the objects under this cell. Check the management state of the objects.

(4)

Observe the color of each GRFU/DRFU under this cell and check the board information.

2.

Unlock the cell

(1)

Click Cell and then double-click Change Cell Management State in the right pane of the Site Maintenance Terminal System window.

(2)

Choose UNLOCKED and then click OK.

(3)

Obtain the cell attributes and the attributes of the objects under this cell. Check the management state of the objects.

(4)

Observe the color of each GRFU/DRFU under this cell and check the board information.

20-38

successfully" is displayed on the status bar. (3)

The management state of each object is LOCKED.

(4)

The color of each GRFU/DRFU is dark green. The board information shows “Manual block."

(1)

The Change Cell Management State dialog box is displayed.

(2)

A prompt "Changing state successfully" is displayed on the status bar.

(3)

The management state of each object is UNLOCKED.

(4)

The color of each GRFU/DRFU is dark green. The board information shows “Normal.”

Pass Fail Not Run Zapped

Remarks 

When the cell management state is changed to LOCKED, the calls of the subscribers in this cell are interrupted.

Before the cell management state is change to UNLOCKED, the MS in this cell cannot access to the network.

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

21-38

T01-0703 Cell Performance Objective Verify that the cell performance test can be carried out through the Site Maintenance Terminal System. Prerequisites 

The Site Maintenance Terminal System and the BTS communicate normally.

You have obtained the site management right through the Site Maintenance Terminal System. Procedure

Expected result

3.

Click a cell and then double-click Cell Performance Test in the right pane of the Site Maintenance Terminal System window.

(1)

The Cell Test dialog box is displayed.

(2)

The test results of the GRFU/DRFU are displayed.



If the board is normal, the result shows that the test succeeded.

Click Start.



If the board is abnormal, the result shows that the test failed.

4.

Result

Pass Fail Not Run Zapped

Remarks None.

T01-08 BT Management T01-0801 BT Management State Change Objective Verify that the BT management state can be changed trough the Site Maintenance Terminal System. Prerequisites 

The Site Maintenance Terminal System and the BTS communicate normally.



You have obtained the site management right through the Site Maintenance Terminal System.

The BT management state is UNLOCKED before the BT is locked. The BT management state is LOCKED before the BT is unlocked. Procedure

Expected result

1.

Lock the BT

(1)

(1)

Click Cell > BT and then double-click Change BT Management State in the Site Maintenance Terminal System window.

The Change BT Management State dialog box is displayed.

(2)

The system prompts that the BT management state is changed successfully.

(3)

The management state of each object is LOCKED.

(4)

The color of each GRFU/DRFU is dark green. The board information shows “Manual block.”

(2)

Check Current BT and LOCKED, and then click OK.

(3)

Obtain the BT attributes and the attributes of the objects under this BT. Check the

Result

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

22-38

management state of the objects. (4)

Observe the color of each GRFU/DRFU under this BT and check the board information.

2.

Unlock the BT

(1)

Click Cell > BT and then double-click Change BT Management State in the Site Maintenance Terminal System window.

(2)

Check Current BT and UNLOCKED, and then click OK.

(3)

Obtain the BT attributes and the attributes of the objects under this BT. Check the management state of the objects.

(4)

Observe the color of each GRFU/DRFU under this BT and check the board information.

(1)

The Change BT Management State dialog box is displayed.

(2)

The system prompts that the BT management state is changed successfully.

(3)

The management state of each object is UNLOCKED.

(4)

The color of each GRFU/DRFU is dark green. The board information shows “Normal.” Pass Fail Not Run Zapped

Remarks 

When the BT management state is changed to LOCKED, the calls of the subscribers in this BT are interrupted.

Before the BT management state is change to UNLOCKED, the MS in this BT cannot access the network.

T01-0802 BT Re-Initialization Objective Verify that the BT can be reinitialized through the Site Maintenance Terminal System. Prerequisites 

The Site Maintenance Terminal System and the BTS communicate normally.

You have obtained the site management right through the Site Maintenance Terminal System. Procedure

Expected result

1.

Click Cell > BT and then double-click BT Reinitialization.

(1)

The BT Reinitialization dialog box is displayed.

(2)

2.

Click OK.

The prompt saying "BT reinitialize successfully" is displayed.

Remarks

Result

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

23-38

After the BT is reinitialized, the GRFU/DRFU is out of service for a short time.

T01-0803 Viewing Channel State Objective Verify that the channel attribute management function is normal. Prerequisites The Site Maintenance Terminal System and the BTS communicate normally. Procedure

Expected result

3.

Click BT. Double-click View Channel State.

(1)

4.

Make a call on the GRFU/DRFU. Check the channel state.

The View Channel State dialog box displayed, showing the channel type and status.

(2)

Value I means the channel is idle; Value A means the channel is occupied.

Result

Pass Fail Not Run Zapped

Remarks To avoid blocking cells, choose single-GRFU/DRFU cells

T01-09 RC Maintenance T01-0901 RC Attribute Management Objective Verify that the RC attribute management through the Site Maintenance Terminal System is functional. Prerequisites 

The Site Maintenance Terminal System and the BTS communicate normally.

You have obtained the site management right through the Site Maintenance Terminal System. Procedure

Expected result

5.

Click an RC. Double-click RC Attributes Management.

(1)

The RC Attributes Management dialog box is displayed.

(2)

6.

Check that the RC attributes shown in the RC Attributes Management dialog box is consistent with the BSC data.

The RC attributes on local end and remote end are consistent.

(3)

A prompt "Setting RC attributes successful" is displayed on the status bar.

(4)

The parameter value is the set value.

7.

Change the parameter value. Click Set. Then click OK.

8.

Close the RC Attributes Management dialog box. Then open it again to check the

Result

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

24-38

parameters. Remarks 

The change of parameters in RC Attributes Management is only valid in the GTMU. To change the parameters in the GRFU/DRFU, perform RC Opstart.

This test may change the initial RC attributes and interrupt the operations on the BTS; therefore, Huawei recommends that you initialize the BTS after the test.

T01-0902 Changing RC Management State Objective Verify that the system can change RC management state through the Site Maintenance Terminal System. Prerequisites 

The Site Maintenance Terminal System and the BTS communicate normally.



You have obtained the site management right through the Site Maintenance Terminal System.

Before locking the RC, ensure that the RC is in UNLOCKED state. Before unlocking the RC, ensure that the RC is in LOCKED state. Procedure

Expected result

1.

Lock the RC

(1)

(1)

Click RC. Double-click Change RC Management State.

The Change RC Management State window appears.

(2)

Select Current RC. Then select LOCKED. Click OK.

Operational result indicates that changing the RC management state succeeded.

(3)

The management state of each object is LOCKED.

(4)

The color of each GRFU/DRFU is dark green. The boards are locked.

(2)

(3)

Obtain the attributes of RC and each channel on this RC through the Site Maintenance Terminal System. Check the management state.

(4)

Check the color of GRFU/DRFU s and the board information.

2.

Unlock the RC

(1)

(1)

Click RC. Double-click Change RC Management State.

The Change RC Management State dialog box is displayed.

(2)

Operational result indicates that changing the RC management state succeeded.

(3)

The management state of each object is UNLOCKED.

(4)

The color of each GRFU/DRFU is light green. The board information is Normal.

(2)

(3)

Select Current RC. Then select UNLOCKED. Click OK. Obtain the attributes of RC and each channel on this RC through the Site Maintenance Terminal System. Check the management state.

Result

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01 (4)

25-38

Check the color of GRFU/DRFU s and the board information.

Remarks 

When the RC management state is changed to LOCKED, the calls on this BT will be affected.

Before the RC management state is changed to UNLOCKED, the connections and conversations on this BT are disabled.

T01-0903 RC Re-initialization Objective Verify that the RC re-initialization through the Site Maintenance Terminal System is normal. Prerequisites 

The Site Maintenance Terminal System and the BTS communicate normally.

You have obtained the site management right through the Site Maintenance Terminal System. Procedure

Expected result

1.

Click BT. Double-click RC Reinitialization.

(1)

The RC Reinitialization dialog box is displayed.

2.

Click OK.

(2)

A prompt "RC reinitialize successfully" is displayed in the Operational result list box.

Result

Pass Fail Not Run Zapped

Remarks After the RC re-initialization, the GRFU/DRFU is out of service for a short time.

T01-10 Channel Management T01-1001 Channel Attribute Management Objective Verify that the channel attributes management through the Site Maintenance Terminal System is normal. Prerequisites 

The Site Maintenance Terminal System and the BTS communicate normally.

You have obtained the site management right through the Site Maintenance Terminal System. Procedure

Expected result

3.

Click a channel. Double-click Channel Attributes Management.

(1)

The Channel Attributes Management dialog box is displayed.

(2)

4.

Check whether the parameters are consistent with BSC data.

The channel attributes at remote end and local end are consistent.

5.

Change the parameter value and channel

(3)

A prompt "Set channel attributes successfully." is displayed on the status bar.

(4)

The parameter value is the set

Result

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01 type. Click Set. Then click OK. 6.

26-38

value.

Close the Channel Attributes Management dialog box. Then open it again to check the parameters.

Remarks 

The change of parameters in Channel Attribute Management is only valid in the GTMU. To change the parameters of the GRFU/DRFU, perform Channel opstart.

This test may change the initial RC attributes and interrupt the normal running of BTS. Therefore, the initialization of BTS after the test is recommended.

T01-11 Board Management T01-1101 Board Operation Objective Verify that the operation of each board through the Site Maintenance Terminal System is functional. Prerequisites 

The BTS operates normally.



The Site Maintenance Terminal System and the BTS communicate normally.



You have obtained the site management right through the Site Maintenance Terminal System.

The test board is configured and functional. Procedure

Expected result

1.

Board resetting, self-test, and opstart

(1)

The Board Management dialog box is displayed.

(1)

Click Board. Double-click Board Management.

(2)

The success information is displayed.

(2)

Result

Pass Fail Not Run Zapped

Right-click the board, Choose Reset, Self-test, or Opstart

Remarks 

Board operation includes board reset, board self-test, and board opstart.



GTMU and GRFU/DRFU support resetting and self-test.

GRFU/DRFU support the opstart

T01-1102 Board Alarm Objective Check the functions used to query board alarms through the Site Maintenance Terminal System. Prerequisites 

The BTS operates normally.

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

27-38



The Site Maintenance Terminal System and the BTS communicate normally.



The operated board is configured and running normally.

The sensors operate normally and connect correctly. Procedure

Expected result

2.

Make the board generate an equipment alarm.

(1)

The alarm is generated.

(2)

The Board Management dialog box is displayed.

Click Board and then double-click Board Management in the Site Maintenance Terminal System window.

(3)

The Board Alarm Information dialog box is displayed, showing the alarm information about the current board.

3.

4.

Result

Pass Fail Not Run Zapped

Right-click a board and choose Board Alarm on the shortcut menu

Remarks None

T02 Service Items T02-01 Basic Services T02-0101 Switching On an MS Objective Verify that an MS can be switched on and registered normally. Prerequisites 

The BTS operates normally.



An MS is available for a test.



The SIM card in the MS is valid.

The Abis interface messages of indicated cells on the BSC Maintenance System can be traced. Procedure

Expected result

5.

Switch on the MS.

The MS is registered in the network.

6.

View the Abis interface tracing messages of indicated cells on the BSC Maintenance System.

The "Location Updating Accept" message can be seen in the Abis interface messages. The location updating of the MS is successful.

Remarks None.

Result Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

28-38

T02-0102 Calls Objective Verify that MS communicate normally. Prerequisites 

The BTS operates normally.



Two MS are available for a test.

The SIM card is inserted into the testing MS. Procedure

Expected result

Result

Use one MS to call the other.

The MS communicate successfully, and the speech quality is good.

Pass Fail Not Run Zapped

Remarks None.

T02-0103 Synchronous Handover Objective: Verify that the system can perform synchronous handovers. Result: Pass

Fail

Not Run

Zapped

Comment & Remark: Synchronous handovers refer to the handovers between cells in one site.

Prerequisites 

The BTS has multiple neighboring cells.



The BTS operates normally.



An MS is available for a test.



The SIM card in the test MS is valid, and the MS has logged in to the network. Procedure

Expected result

7. Use the MS to set up a call on a

The handover is successful and the

certain frequency in the cell of the

call is not interrupted.

site. Then hand over the call to a

Result

Pass Fail Not Run Zapped

neighboring cell of this site 8. Hand over the call back to the

The handover is successful and the

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01 previous cell and keep calling.

29-38 call is not interrupted.

9. Repeat steps 1 to 2 with other cells.

Pass Fail Not Run Zapped

The same as steps 1 and 2.

T02-0104 BCCH TRU Mutual Aiding Objective Verify that the BTS can provide the BCCH TRU mutual aiding function. Prerequisites 

The BCCH mutual aiding function is enabled.



At least one cell is configured with more than one GRFU..



The BTS operates normally and the GRFU. Carrying the BCCH also operates normally

The SIM cards inserted in the testing MS are valid and the MS have accessed the network. Procedure

Expected result

10.

Block the BT that the primary BCCH on the Site Maintenance System.

(1)

The state of all the channels under the BT carrying the primary BCCH is 0.

(2)

11.

Start the local or remote site maintenance system 15 minutes later. Select BT and double-click View Channel State. Check whether the GRFU, carrying the BCCH switches to another GRFU of the cell.

The primary BCCH is switched to another BT through a TRU mutual aid.

(3)

The call is successful and the speech quality is good.

12.

Result

Pass Fail Not Run Zapped

Use the MS to initiate a call after the state of the new primary BCCH changes to I.

Remarks 

Enable the TRU mutual aid function during the system initialization.

Perform the BCCH TRU mutual aid function 15 minutes after the system initialization.

T02-0105 Frequency Hopping Function Objective: Verify that the frequency hopping function of the BTS is normal. Result: Pass

Fail

Not Run

Comment & Remark:

Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

30-38

Prerequisites 

The specified cell of the BTS is configured with the RF frequency hopping function.



The BTS operates normally.



An MS is available for test.



The SIM card in the MS is valid. Procedure

Expected result

13. Block the TCHs on the DRFU carrying the non-primary BCCH.

Result

Unblocking success is displayed on

the

Site

Maintenance

Pass Fail Not Run Zapped

Terminal System. 14. Use the testing MS to initiate a call on the

In RF hopping mode, the DRFU

DRFU carrying the BCCH and maintain

carrying the primary BCCH uses

the call. Observe the frequency hopping

non-hopping mode. The speech

mode through the MS.

quality is good.

15. Unblock the TCHs on the DRFU carrying

Blocking success is displayed on

the non-primary BCCH. Block the TCHs

the Site Maintenance Terminal

on the DRFU carrying the primary BCCH.

System.

16. Use the MS to initiate a call on the DRFU

The

DRFU

carrying

Pass Fail Not Run Zapped

Pass Fail Not Run Zapped

the

carrying the non-primary BCCH and

non-primary BCCH uses hopping

maintain the call. Observe the frequency

mode. The speech quality is

hopping mode through the MS.

good.

Pass Fail Not Run Zapped

T03 RF Specifications Test Items T03-01 RF Specifications T03-0101 VSWR of the Antenna System Objective: Verify that the voltage standing wave ratio (VSWR) of the antenna system complies with the requirements. Result: Pass

Fail

Not Run

Zapped

Comment & Remark: The VSWR of each feeder must be no more than 1.3 but for the sites which with shorter feeder (less than 20

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

31-38

M) or the site with combiner, the VSWR should no more than 1.4.

It is recommended that the Sitemaster (ANRITSU or Bird) is the instrument for VSWR test. Prerequisites The BTS operates normally. Procedure A 1.

Expected result

Take the jumper off and test the VSWR with

SiteMaster.

Antenna VSWR Test result: Cell

Feeder

VSWR

Result

Cell1A

Pass Fail Not Run Zapped

Cell1B

Pass Fail Not Run Zapped

Cell1C

Pass Fail Not Run Zapped

Cell1D

Pass Fail Not Run Zapped

Cell1E

Pass Fail Not Run Zapped

Cell1F

Pass Fail Not Run Zapped

Cell2A

Pass Fail Not Run Zapped

Cell2B

Pass Fail Not Run Zapped

Cell2C

Pass Fail Not Run Zapped

Cell2D

Pass Fail Not Run Zapped

Cell2E

Pass Fail Not Run Zapped

Cell2F

Pass Fail Not Run Zapped

Cell3A

Pass Fail Not Run Zapped

Cell3B

Pass Fail Not Run Zapped

Cell3C

Pass Fail Not Run Zapped

Cell3D

Pass Fail Not Run Zapped

Cell3E

Pass Fail Not Run Zapped

Cell3F

Pass Fail Not Run Zapped

Cell1

Cell2

Cell3

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

32-38

T03-0102 DRFU Transmit Power Objective: Verify that the actual transmit power of the DRFUs meets the requirements. Result: Pass

Fail

Not Run

Zapped

Prerequisites 

The BTS operates normally, and the calls of the DRFUs are normal.

. Procedure A 1.

Expected result

Measure the transmit power by Power meter.

The criteria for the RF transmit power : As per ETSI EN 300 910 V7.4.0 (European Stadard Telecommunication Series) “The tolerance of the actual maximum output power of the BTS shall be ±2 dB under normal conditions and ±2,5 dB under extreme conditions”. DRFU

BAND

Carrier

Coupling

ToC Output

ToC Output

TYPE

System

Power(W)

Power(dBm)

900M

DRFU

900M

DRFU

1800M

DRFU

1800M

DRFU

No combining Combining No combining Combining

Power Output

Power Output

Range(Normal)

Range(Extreme)

± 2.0 dB

± 2.5 dB

45W

46.53

44.53 ~ 48.53

44.03 ~ 49.03

20W

43.01

41.01 ~ 45.01

40.51 ~ 45.51

40W

46.02

44.02 ~ 48.02

43.52 ~ 48.52

18W

42.55

40.55 ~ 44.55

40.05 ~ 45.05

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

TRX No.

Measured value

33-38

Result

0

(

)dBm

Pass Fail Not Run Zapped

1

(

)dBm

Pass Fail Not Run Zapped

2

(

)dBm

Pass Fail Not Run Zapped

3

(

)dBm

Pass Fail Not Run Zapped

4

(

)dBm

Pass Fail Not Run Zapped

5

(

)dBm

Pass Fail Not Run Zapped

6

(

)dBm

Pass Fail Not Run Zapped

7

(

)dBm

Pass Fail Not Run Zapped

8

(

)dBm

Pass Fail Not Run Zapped

9

(

)dBm

Pass Fail Not Run Zapped

10

(

)dBm

Pass Fail Not Run Zapped

11

(

)dBm

Pass Fail Not Run Zapped

24

(

)dBm

Pass Fail Not Run Zapped

25

(

)dBm

Pass Fail Not Run Zapped

26

(

)dBm

Pass Fail Not Run Zapped

27

(

)dBm

Pass Fail Not Run Zapped

28

(

)dBm

Pass Fail Not Run Zapped

29

(

)dBm

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

34-38

Huawei Representative

PTML Representative

Name:_____________________

Name:_____________________

Signature:__________________

Signature:__________________

Date:______________________

Date:______________________

T03-02 External alarm Objective: Verify that all external alarms can be reported to OMC normally. Result: Pass

Fail

Not Run

Zapped

Comment & Remark: There are 16 external environment alarms on site. All of alarms are Boolean values. If the alarm appears, the alarm can be displayed normally on OMC. When the alarm recovers, the corresponding alarm will disappear on OMC. Procedure Check the Intruder alarm

Expected result

Result

Intruder sensor properly installed & terminated till BTS. Open & close BTS Room Door to generate & clear the

Pass Fail Not Run Zapped

intruder alarm respectively & verify from OMCR Check the Fire Panel alarm

Fire Panel properly installed & terminated till BTS. As a precaution, the “Gas Activation Switch” is switched off and after the activity changed back to “ON”. Open the main equipment room’s “AC Distribution Box” and turn the MCB for the “Fire Panel Alarm” to the "OFF" position. After few seconds an audible alarm should be heard

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

35-38

from the “Fire Alarm Panel”. Check with OMC-R that they can see this alarm. In the “AC Distribution Box” switch ON the “Fire Alarm Panel – MCB”. Check with the OMC-R that the alarm has gone. Check the Smoke Detector alarm

Smoke sensors are properly installed & terminated till BTS. As a precaution, the “Gas Activation Switch” is switched off and after the activity changed back to “ON”. Open the “Fire Alarm Control Panel” front cover. Pull down the fire alarm "Pull Down Switch" located on the “Equipment Room Wall”, the “Fire Alarm Bell” should start to ring. Silence the bell with the "Silence Bell" soft key located on the “Fire Alarm Control

Pass Fail Not Run Zapped

Panel”. Check with the OMC-R that they can see this alarm. Reset the “Fire Alarm Control Panel” by pressing the "Reset Alarm" soft key on the “Fire Alarm Control Panel”. Check with the OMC-R that the alarm has gone. Close the “Fire Alarm Control Panel” front cover. Check the Over temp alarm

Over temp sensor properly installed &

terminated till BTS. On A/C Panel, Set the over temperature threshold below 28 °C. Over Temperature

Pass Fail Not Run Zapped

alarm will be reported at the OMCR. Verify from OMCR & set over temperature threshold back to 28 °C. Check the Humidity alarm

Humidity sensor properly installed & terminated till BTS. Locate the “Humidity Sensor”, which is installed on one of the “Equipment Room Walls”.

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

36-38

Set the humidity upper limit at 20% with OMCR. After few seconds, Check with OMC-R that they can see this alarm. Set the humidity upper limit back to 85%, Check with the OMC-R that the alarm has gone. Check the Water leakage alarm

Water leakage sensor properly installed & terminated till BTS. Locate the “Water Leakage Sensor”, located on one of the “Equipment Room Walls” at floor level. Immerse the Water

Pass Fail Not Run Zapped

Leakage Sensor into water. After few seconds, Check with OMC-R that they can see this alarm. Take out the Water Leakage Sensor from the water, Check with the OMC-R that the alarm has gone. Check the Gas release alarm

FSS properly installed & terminated till BTS. As a precaution, the “Gas Activation Switch” is switched off and after the activity changed back to “ON”. The Test will be done by using “LOOP Test

Pass Fail Not Run Zapped

Method”. Remove the [Jumper] cables of “Gas Released” on EMU, the alarm of “Gas Released” will be reported to OMCR. Reconnect the [Jumper] cables; the alarm should be cleared in OMCR Check the Generator Running alarm

Open the “Main Switch DB” in Genset Room. Disconnect the WAPDA supply from the Main Switch. Genset will be started. Generator Running alarm will be

Pass Fail Not Run Zapped

reported at the OMCR. Verify from OMCR & Switch ON the MCB. Check the Tower light alarm

Tower light sensor properly installed & terminated till BTS. Cover the sun switch with a cloth. Tower

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

37-38

lights will turn on. Now remove one bulb from the holder & Tower light failure alarm will be reported at OMCR. Clear the alarm once bulb is installed back & verify from OMCR. Check Air Conditioner Failure Alarm

Air Con Panel properly installed & terminated till BTS. Alarm to be actuated

Pass Fail Not Run Zapped

when both Air Conditioners are operating

Check Mains Failure Alarm

Alarm to be actuated when Input Commercial Supply for Rectifier has

Pass Fail Not Run Zapped

suspended / failed Check Low Battery Voltage alarm Check the Rectifier Major alarm Check the Rectifier Minor Alarm

Alarm to be actuated when Battery Bank discharge voltage 1, Pass Fail Not Run Zapped

Condition: Alarm to be actuated when lightning surge has affected the system

Check the Generator

Open the “Main Switch DB” in Genset

Failure alarm

Room. Disconnect the WAPDA supply

Pass Fail Not Run Zapped

from the Main Switch. Genset will be started. Wait for consistent response of the Genset, for some time. Locate the “OutPut Switch” on the Front Panel of Genset. Change the Output Switch to “OFF” position. The Output supply of the Genset will be disconnected.

Pass Fail Not Run Zapped

The alarm of “Generator Failure” (Alarm – 15) will be reported in OMCR. Change the position of “Output Switch” to “ON” position. The supply of Genset will be again commenced. Reconnect the WAPDA supply by changing position of Main Switch to “ON” position.

Check the Gen Low Fuel alarm

Take the fuel float with the cover out of the tank. Check with OMC-R that they can see

Pass Fail Not Run Zapped

ATP Items HUAWEI BTS3900

Ufone/Technical/ANO/DOC/01/01

38-38

this alarm. At the fuel float with cover inserted to the tank. Check with the OMC-R that the alarm has gone.

Huawei Representative

PTML Representative

Name:_____________________

Name:_____________________

Signature:__________________

Signature:__________________

Date:______________________

Date:______________________

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF