KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 1 of 26
Offshore Platform HAZID/ENVID Report
Table of Contents 1. Introduction......................................................................................................................... 2 1.1. Document Purpose and Scope ................................................................................. 2 1.2. Objective ................................................................................................................... 2 1.3. Scope ........................................................................................................................ 3 1.4. Abbreviations ............................................................................................................ 3 2. Methodology ....................................................................................................................... 4 2.1. Overview ................................................................................................................... 4 2.2. HAZID/ENVID Nodes ................................................................................................ 4 2.3. HAZID/ENVID Process ............................................................................................. 4 2.4. Reference Materials .................................................................................................. 5 2.5. Meeting Attendees .................................................................................................... 5 3. Main Findings and Actions Arising ..................................................................................... 6 4. Supporting References....................................................................................................... 7 Appendix List of Appendices ................................................................................................... 8 Appendix A: HAZID/ENVID Guidewords ................................................................................. 9 Appendix B: HAZID/ENVID Reference Materials .................................................................. 13 Appendix C: Completed HAZID/ENVID Worksheets ............................................................ 21 Table of Tables Table 2.1 List of HAZID/ENVID Reference Materials ............................................................. 5 Table 2.2 List of HAZID/ENVID Attendees ............................................................................. 5 Table 3.1 HAZID/ENVID Actions ............................................................................................ 6 Table of Figures Figure 1-1: Outline System Schematic ................................................................................... 2
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 2 of 26
1. Introduction 1.1. Document Purpose and Scope E.ON UK has commissioned Genesis Oil and Gas Consultants Ltd. (GOGC) to perform the Front End Engineering Design (FEED 1a) for the pipeline and offshore facility associated with the E.ON Kingsnorth Carbon Capture and Storage (CCS) development project. An outline system schematic of the development is presented in Figure 1-1.
Kingsnorth Power Station
Meter
Kingsnorth Platform
Compressor
ESDV Landfall Valve
ESDV
CCS Pig Receiver
CCS Pig Launcher
Onshore Pipeline
Landfall
Offshore Pipeline
Figure 1-1: Outline System Schematic As required by both E.ON UK and GOGC risk management processes, the potential hazards associated with the system require identification by a hazard and environmental identification (HAZID/ENVID) process. This document details the output from a HAZID/ENVID meeting that took place on the 21st September at GOGC Aberdeen Offices. 1.2.
Objective The purpose of the meeting was to identify key safety, health and environmental (SHE) hazards that have the potential to significantly impact upon or influence the subsequent project design phases. Where such hazards were identified, the proposed measures to prevent, control or mitigate them were reviewed. Where necessary, further or alternative measures were actioned.
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 3 of 26
The overall objective of the HAZID/ENVID was to, wherever possible; ensure that the inherent safety, health and environmental principles are applied to the project design and to prescribe philosophies or controls to manage residual risks. 1.3.
Scope The HAZID/ENVID meeting covered both the Kingsnorth Platform structure as well as the process equipment. The scope of the process equipment review started at the riser base connection, through the filters, meters and heaters and ended at the CO2 injection master well valve. Due to the lack of detail design definition at the time of the meeting, decommissioning of the platform was outside of the HAZID/ENVID review scope. SHE issues not impacting upon or influencing the FEED 1a design or its operating philosophy were outside the scope of the HAZID/ENVID meeting.
1.4.
Abbreviations CCS ENVID GOGC HAZID SHE TOR
Carbon Capture and Storage Environmental Hazard Identification Genesis Oil and Gas Consultants Ltd Hazard Identification Safety, Health and Environmental Terms of Reference
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 4 of 26
2. Methodology 2.1. Overview The HAZID/ENVID Terms of Reference (TOR) [Ref. S1] was used as the methodology basis for the meeting. 2.2. HAZID/ENVID Nodes The study scope was divided into the following nodes to facilitate appropriate examination: Node 1: The Kingsnorth Platform including the civil structure, process equipment, riser and CO2 injection lines. Node 1.1: Construction; Node 1.2: Commissioning and Operation, including drilling activities. The TOR detailed Node 2 as the onshore and offshore pipeline. Node 2 was not examined during the HAZID/ENVID due to insufficient time remaining after studying the aforementioned nodes. 2.3. HAZID/ENVID Process The HAZID/ENVID guidewords were systematically applied to each of the study nodes to identify hazards that have the potential to give rise to safety, health or environmental consequences of concern. The proposed prevention, control and associated mitigation measures were explored for each hazard that has the potential to give rise to consequences of concern. Further or alternative measures were proposed where the team were of the opinion that the proposed prevention, control or mitigation measures are not sufficient to reduce the associated risks to as low as is reasonably practicable levels. Meeting attendees were reminded that the project was in FEED 1A. The focus of the meeting was therefore upon the identification of key safety, health and environmental hazards that had the potential to significantly impact upon or influence the subsequent design phases. An E.ON UK provided HAZID/ENVID worksheet was used to record the minutes of the meeting. The worksheet was projected on a screen such that all participants could see its development during the meeting. Worksheet entries were made by exception, i.e. only HAZID/ENVID guidewords that gave rise to consequence of concern were recorded. Several drawings were referenced during the meeting and are listed in Table 2.1.
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 5 of 26
2.4. Reference Materials The materials referenced during the meeting are summarised in Table 2.1 and presented in Appendix B. Document /Drawing Title Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 1 Layout Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 2 Layout Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 3 Layout Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 4 Layout Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Weather Deck Layout Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Elevation Looking East Kingsnorth Carbon Capture And Storage – PFD Platform & Pipeline Material Selection Diagram (Gaseous Phase) Table 2.1 List of HAZID/ENVID Reference Materials
Document Reference
Rev
J71584-A/ L-DW-sk1
A1
J71584-A/ L-DW-sk2
A1
J71584-A/ L-DW-sk3
A1
J71584-A/ L-DW-sk4
A1
J71584-A/ L-DW-sk5
A1
J71584-A/ L-DW-sk6
A1
KCP-GNS-PCD-PFD0010
01
2.5. Meeting Attendees Table 2.2 details the meeting attendees. The range of personnel ensured that the necessary skills, knowledge and experience were available to perform a thorough and accurate HAZID/ ENVID. Role
Name
Company
Name Deleted Name Deleted
HAZID/ ENVID Meeting Chairman
GOGC
Safety Lead and Meeting Secretary
GOGC
Name Deleted
Safety Consultant
E.ON UK
Name Deleted
Process Lead
GOGC
Name Deleted
Facilities Lead Civil and Structural
GOGC
Name Deleted
Environmental Lead
GOGC
Name Deleted
Environmental Consultant
E.ON NT
Name Deleted
Production Technologist
Baker RDS
Name Deleted
Completion Engineer
Baker RDS
Name Deleted
Client Representative
E.ON
Table 2.2 List of HAZID/ENVID Attendees #
Part time.
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 6 of 26
3. Main Findings and Actions Arising The completed HAZID/ENVID worksheets are presented in Appendix C. The HAZID/ENVID did not raise any issues that were likely to significantly affect the design of the Kingsnorth topsides process or structure. The six actions that arose during the HAZID/ENVID are detailed in Table 3.1.
Action No. 1
Action
Actionee
Action Due Date
Take cognisance of environmental report KCP-GNS-SHE-REP-0007 when determining the pile size
Name Deleted
End FEED 1B
2
Devise security philosophy for construction and NUI operation
Name Deleted
End FEED 2
3
Provide justification of a temperature lower than -50C will not be experienced at the wellhead during depressurisation of the topsides facilities
Name Deleted
31 Oct 2010
4
Confirm onshore compression has pressure protection to prevent exceeding 60 barg during gas phase operation
Name Deleted
30 Sept 2010
5
Reconfigure well arrangement to minimise distance between tree and wellhead valves and provide ready access to both
Name Deleted
30 Sept 2010
6
Produce integrated plan, to ensure drilling schedule identifies this hazard [drilling after pressurisation of topsides] and safeguard to manage risks
Name Deleted
End FEED 2
Table 3.1 HAZID/ENVID Actions
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 7 of 26
4. Supporting References [S1]
Kingsnorth Carbon Capture & Storage Project - Kingsnorth Platform and Pipeline HAZID/ENVID Meeting Terms of Reference - KCP-GNS-SHE-TOR-0001 Draft.
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 8 of 26
Appendix List of Appendices Appendix A
HAZID/ENVID Guidewords
Appendix B
HAZID/ENVID Reference Materials
Appendix C
Completed HAZID/ENVID Worksheets
Appendix D
HAZID/ENVID Action Sheets
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 9 of 26
Appendix A: HAZID/ENVID Guidewords 1
2
Process Parameters Temperature
Pressure
Flow
Level
Inventory
Compositions
Flash point
Toxicity
Corrosivity
Solid deposition
Wax / hydrates
Chemical reaction
Materials of construction/compatibility
Kinetic Energy
Potential Energy
Black start
Start up
Shutdown
Normal operation
SIMOPS
Sampling
Calibrating
Testing
Service failure (air, water, etc)
Emergency shutdown
Blowdown
Isolation
Draining / venting
Purging / filling
Winterisation
Operational access
Maintenance access
Confined spaces
Means of escape
Means of evacuation
Life saving appliances
Liquid effluent
Solid effluent
Venting
Noise level
Flaring
Air intakes / exhausts
Ventilation
Pressurisation
Gas / Oxygen enrichment
Extreme weather
Humidity
Illumination
Discharges to Air
Discharges to Water
Odour
Environmental Receptors (including Population).
Energy Efficiency
Lightening
Smoke / gas detection
Active fire protection
Operating methods
Maintenance 3
4
5
Access / egress
Environment
Loss prevention Fire / head detection Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
6
7
8
9
10
Page 10 of 26
Fire areas
Area classification
Passive fire protection
Blast overpressure
HP / LP interfaces
Deluge drains
Ignition sources
Leak sources
Plant and equipment Design pressure
Design temperature
Materials of construction
Vibration
Thermal stress
Pressure cycling
Hydraulic shock
Static electricity
Ionising radiation
Mechanical seals
Liquid seals
Vacuum protection
Galvanic corrosion
By-pass valves
Hazardous areas
Structures Loads on / strength of
Structure / foundations / equipment supports
Type of loads
Static / dynamic / environmental
Creep
Scour
Fire / blast walls
Impact protection
Weights limits
Platforms
Handrails
Bunds / Drains
Stairs / Ladders
Walkways
Airlocks / doors
Floors / Hatches
ESD, F+G logic
Control software
DCS failure
Failure modes
System reliability
Alarms and trips
High integrity systems
Overrides and resets
Control room ergonomics
Power supplies
DC supplies
Battery supplies / UPS
Distribution boards
Cable routes
Inductive effects
Load shedding
Overload protection
Heat tracing
Motor start frequency
Emergency lighting
EMC
PA system
Signs
Control systems
Electrical systems
Communication Radios Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Beacons / klaxons 11
12
13
14
15
Page 11 of 26
Nav Aids
Installation Temporary supports
Sequence of events
Rigging
Lifting points
Scaffolding
Hot work
Hot tap / line freeze
Specialist welding
Tie-in points
Personnel / Occupational Hazards Slips / trips / falls
Electrocution
Hot / cold environment
Hand tools
Manual handling
Equipment failure
Hazardous chemicals
Machine tools
High level working
Rigging lines
Ionising radiation
Toxic gases / fume
Inert gases
Smoke
Steam
Asbestos
Crew change
Roles and responsibilities
Overboard working
Human Factors
Dropped objects Containers
Gas bottle
Swinging loads
Small overhead objects
Drill pipe / casing
Drill collars
Scaffolding
Anchors
Special lifts
Shuttle tanker
Supply vessel
Standby boat
Shipping lanes
Drilling rig
Diving support vessel
Anchor handling vessel
Helicopter
Fishing vessel
DP System
Anchors
Pipelines
Chains / cables
Work < 500 m
Buoys
Temporary Refuge
Command Structure
Special procedures
Fire and Explosion
H2S Gas
TEMPSC
EER
Helicopters
Vessels
Marine
Emergency Response
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 12 of 26
Isolation 16
17
18
Drilling Drilling
Workover
Wirelining
Mechanical problems
Well control problems
Drillstring problems
Formation problems
Shallow gas
Mud weight
Dropped objects
Life support
DSV
Breaking containment
Process operation
Maintenance
Security access
Vehicles
Drains
Cranes
Excavations
Earth moving
Temporary facilities
Third party contractors
Diving
Site operations
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 13 of 26
Appendix B: HAZID/ENVID Reference Materials
Appendix
Document Reference
Rev
J71584-A/ L-DW-sk1
A1
J71584-A/ L-DW-sk2
A1
B3
Kingsnorth Offshore Platform Level 1 Layout Kingsnorth Hewitt Offshore Platform Level 2 Layout Kingsnorth Offshore Platform Level 3 Layout
J71584-A/ L-DW-sk3
A1
B4
Kingsnorth Offshore Platform Level 4 Layout
J71584-A/ L-DW-sk4
A1
B5
Kingsnorth Platform Weather Deck Layout Kingsnorth Offshore Platform Elevation Looking East Kingsnorth Platform & Pipeline Material Selection Diagram (Gaseous Phase)
J71584-A/ L-DW-sk5
A1
J71584-A/ L-DW-sk6
A1
KCP-GNS-PCD-PFD0010
01
B1 B2
B6 B7
Document /Drawing Title
Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 14 of 26
Appendix B1 - Kingsnorth Offshore Platform Level 1 Layout
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 15 of 26
Appendix B2 - Kingsnorth Offshore Platform Level 2 Layout
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 16 of 26
Appendix B3 - Kingsnorth Offshore Platform Level 3 Layout
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 17 of 26
Appendix B4 - Kingsnorth Offshore Platform Level 4 Layout
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 18 of 26
Appendix B5 - Kingsnorth Offshore Platform Level 5 Layout
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 19 of 26
Appendix B6 - Kingsnorth Offshore Platform Elevation Looking East
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
Page 20 of 26
Appendix B7 - Kingsnorth PFD Platform & Pipeline Material Selection Diagram (Gaseous Phase)
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZID-ENV D Report.doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title: Document Title:
Kingsnorth Carbon Capture & Storage Project
Page 21 of 26
Offshore Platform HAZID/ENVID Report
Appendix C: Completed HAZID/ENVID Worksheets HAZARD SCENARIO
CAUSES
CONSEQUENCES
POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE
POTENTIAL IMPACT TO THE ENVIRONMENT
RECOMMENDED SAFEGUARDS
ACTIONS/ COMMENTS (No)
Node 1.1: Kingsnorth Platform (construction) – including civil structures, process equipment, riser and CO2 injection 1
Operational access – potential diver access required during installation
Design requires diver intervention
Potential for diver injury/incident
Diver injury
Design jacket for installation without diver intervention (pipeline connection to riser to be considered as part of pipeline HAZID)
2
Construction access – working at height and overside working.
Necessity to complete jacket-topsides connection
Requirement for access to potentially elevated or difficult to reach areas including overside working
Potential for personnel injury
Provision of temporary access structures for completion of jacket- topsides connection, Access from ESDV deck may be considered as an option..
3
Noise/v bration
Piliing activities
Potential requirement for Disturbance Licence.
Occupational noise in excess of first action limit
Potential effect on protected species – possible damage or hearing loss.
Minimise size of pile consistent with platform structural integrity and stability. See KCP-GNS-SHEREP-0007
4
Nav Aids – vessel collision due to absence of navigational aids
Marine obstruction – unmarked by Nav Aids
Increased risk of passing vessel collision
Potential for personnel injury on both vessel and platform
Potential loss of containment of vessel cargo or fuel.
Nav Aids to be installed in accordance with regulatory requirements – at the installation stage of jacket and topsides. Note that temporary support for Nav Aids on the jacket will be required if it is to be left without topsides after installation.
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
(1) Take cognisance of environmental report KCP-GNSSHE-REP-0007 when determining the pile size – ?? FEED 1B
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
HAZARD SCENARIO
CAUSES
CONSEQUENCES
5
Third Party intervention
Unauthorised third party gaining access to platform (possibly when unattended)
Potential project delay
Potential personnel injury (to third parties or any personnel onboard)
6
Decommissioning
Inability to remove completely the facility during decommissioning
Delay to project due to rejection of FDP because of inadequate decommissioning plans. Risk to shipping as a result of structures left subsea.
Potential;impact to vessel crew
POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE
Page 22 of 26
POTENTIAL IMPACT TO THE ENVIRONMENT
RECOMMENDED SAFEGUARDS
Consideration of standby vessel during construction phase and CCTV on topsides.
Potential loss of containment of vessel cargo or fuel.
ACTIONS/ COMMENTS (No) (2) Devise security philosophy for construction and NUI operation – ?? – FEED 2.
Installation is designed to be removed, as a reversal of installation.
All guidewords checked: Y Base case and variation considered: N
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
HAZARD SCENARIO
CAUSES
CONSEQUENCES
POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE
Page 23 of 26
RECOMMENDED SAFEGUARDS
POTENTIAL IMPACT TO THE ENVIRONMENT
ACTIONS/ COMMENTS
Node 1.2: Kingsnorth Platform (Commissioning and operation) – including drilling activities, operational process equipment, riser and CO2 injection 1
Low Temperature
Heater failure during early dense phase operations (low reservoir pressure)
Potential Xmas tree failure causing loss of containment. Loss of tubing integrity
Toxic/asphyxiation impact of CO2
Wellhead specification (-50 C) is adequate to deal with heater failure and JT effect with maximum upstream pressure – during dense phase Ref KCPGNS-PCD-REP-0007. Low temperature trip downstream of heaters isolates the well stream. Isolation of loss of containment – DHSV and flowline SDV. Gaseous operation to continue long enough for wellhead pressure to be sufficiently high to obviate this scenario.
2
Low Temperature
Blowdown of topsides results in low temperature in topsides pipework, up to Xmas trees – minimum achievable temperature is -79C.
Brittle failure to pipework due low temperature, leading to loss of containment
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
Toxic/asphyxiation impact of CO2
Material specification is rated for the lowest temperature likely to occur.
(3) Provide justification of a temperature lower than -50C will not be experienced at the wellhead during depressurisation of the topsides facilities – ?? – Oct 10
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Page 24 of 26
Document Title:
Offshore Platform HAZID/ENVID Report
HAZARD SCENARIO
CAUSES
CONSEQUENCES
3
Low Temperature
Pipework failure on topsides
Low temperature CO2 release (gas and dry ice), ultimately causing structural failure and large temperatures gradients leading to buckling and failure.
Toxic/asphyxiation impact of CO2 plus personnel injury resulting from structural failure.
Material specification is rated for the lowest temperature likely to occur. Construction to reduce flanges and use all welded design where possible. Orientation of tappings, flanges etc . to minimise the effects of LOC incidents. Shielding (for structure and escapeways) to be provided where needed. Covered in layout review report.
4
High temperature
Continued heating of trapped inventory (gaseous and dense phases)
Exceedence of pressure/temperature rating of pipework.
Toxic/asphyxiation impact of CO2
Multiple high temperature trips – gaseous phase.
CO2 leak detection to be installed and executive action to isolate topsides and curtail leak.
POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE
5
High Pressure
Pipeline/topsides packing due to continued CO2 compression with wells closed in (no other topsides isolations closed)
Topsides heaters rated at 60 barg, so will fail when pressure exceeds this. Other equipment is rated to 150 barg.
Toxic/asphyxiation impact of CO2
6
Composition
High water content in CO2
Increased rate of corrosion – topsides is stainless steel so main effect is on riser/pipelines and wellheads. Increased risk of hydrate formation
Toxic/asphyxiation impact of CO2
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
POTENTIAL IMPACT TO THE ENVIRONMENT
RECOMMENDED SAFEGUARDS
ACTIONS/ COMMENTS
Dense phase includes pressure relief to provide adequate protection.
Possible CO2 release into sea
(4) Confirm onshore compression has pressure protection to prevent exceeding 60 barg during gas phase operation – ?? 30 Sept 10.
Water content monitoring at onshore dehydration. (automatic with manual back-up) PIMS and wellheads integrity management system. Hydrate inhibition package to protect against topsides choke blockage.
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
HAZARD SCENARIO
CAUSES
CONSEQUENCES
7
Extraneous matter in pipeline
Contamination of well, leading to decreased injectivity. Filter blinding, requiring frequent filter changes.
Potential need for additional workovers, resulting in increased personnel risk exposure
Composition
POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE
Increased personnel presence on platform.
Page 25 of 26
POTENTIAL IMPACT TO THE ENVIRONMENT Environmental footprint due to the need to drill additional well.
RECOMMENDED SAFEGUARDS
Rigorous cleaning programme for pipeline during commissioning. Water content monitoring at onshore dehydration. Filters installed topsides as final layer of protection for wells with differential pressure monitoring.
8
Flash point
Methanol storage and use
Potential flammable atmosphere and fire if ignited
Potential for personnel injury – fire invisible to personnel
Hazardous area classification process and selection of appropriate ATEX equipment. Nitrogen blanket on storage. Fire detection provided and portable AFFF for firefighting.
9
Reverse flow
Fractured flowline results in backflow from well, potentially containing hydrocarbons.
Potential fire if concentration of hydrocarbon above LFL.
Potential for personnel injury from fire and from release.
Head of CO2 in well column inhibits flow of hydrocarbon gas up to the wellhead. Check valve on flowline linlet. Xmas tree valve and DHSV to isolate reservoir and mitigate release.
Fractured flowline results in backflow from well.
Release of CO2 from well
10
Reverse flow
ACTIONS/ COMMENTS
During well completion, base of production tubing would contain completion fluid and brine, with low top hole pressure. Perforation into the reservoir would result in completion fluid flowing into the reservoir. Some hydrocarbons may flow into the production tubing, but with low pressure at the top of the tubing. Once CO2 injection commences, any fluid in the well column and in the near wellbore section of the reservoir would be displaced. Any well startup would be with a positive pressure into the welll (2.5 bar or more) thus ensuring no reverse flow case is credible during startup.
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
Toxic CO2 impact on personnel
CO2 leak detection to be installed and executive action to isolate topsides and curtail leak, along with Xmas tree valves and DHSV. Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title:
Kingsnorth Carbon Capture & Storage Project
Document Title:
Offshore Platform HAZID/ENVID Report
HAZARD SCENARIO
CAUSES
CONSEQUENCES
11
Startup
Initial startup results filters requiring frequent changeout.
Personnel presence on platform increased for changeout operations, resulting in increased associated risk
Personnel injury, manual handling and potential impact of CO2 release if inadequately isolated.
12
Well Arrangement
Operational access to wellhead and tree valving with minimised conductor riser height to allow direct connection at a low a level as can be achieved. Spool piece section introduces additional leak path
Ready access to wellhead valves for pressure monitoring and for workover activities.
Increased risk of loss of containment events
POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE
Page 26 of 26
POTENTIAL IMPACT TO THE ENVIRONMENT
RECOMMENDED SAFEGUARDS
ACTIONS/ COMMENTS
Filter replacement will include positive isolation, venting and pressure confirmation, with safe system of work to control operations.
(5) Reconfigure well arrangement to minimise distance between tree and wellhead valves and provide ready access to both- ?? – 30 Sept 10.
Increased risk of loss of containment events
Additional leak path introduced by use of spool piece below tree.
13
Drilling
Drilling activity results in dropped object that damages process pipework
Potential loss of containment resulting in CO2 release should the topsides be pressured.
Potential harm to personnel in the event of a LOC, including impact to drilling rig and crew.
Undertake initial drilling of wells prior to pressurisation of topsides process.
14
Vehicles (fishing and other vessels)
Concurrent significant CO2 release and vessels within effect radii.
Build-up of cold CO2 at sea surface around platform.
Potential for harm to vessel crew.
CO2 detection with appropriate executive action maybe combined with warning of shipping in vicinity by radio and/or General Alarm.
(6) Integrated Plan, to ensure drilling schedule identifies this hazard and safeguard to manage risks – E.ON FEED 2.
All guidewords checked: Y Base case and variation considered: N
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011