KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 1 of 26

Offshore Platform HAZID/ENVID Report

Table of Contents 1. Introduction......................................................................................................................... 2 1.1. Document Purpose and Scope ................................................................................. 2 1.2. Objective ................................................................................................................... 2 1.3. Scope ........................................................................................................................ 3 1.4. Abbreviations ............................................................................................................ 3 2. Methodology ....................................................................................................................... 4 2.1. Overview ................................................................................................................... 4 2.2. HAZID/ENVID Nodes ................................................................................................ 4 2.3. HAZID/ENVID Process ............................................................................................. 4 2.4. Reference Materials .................................................................................................. 5 2.5. Meeting Attendees .................................................................................................... 5 3. Main Findings and Actions Arising ..................................................................................... 6 4. Supporting References....................................................................................................... 7 Appendix List of Appendices ................................................................................................... 8 Appendix A: HAZID/ENVID Guidewords ................................................................................. 9 Appendix B: HAZID/ENVID Reference Materials .................................................................. 13 Appendix C: Completed HAZID/ENVID Worksheets ............................................................ 21 Table of Tables Table 2.1 List of HAZID/ENVID Reference Materials ............................................................. 5 Table 2.2 List of HAZID/ENVID Attendees ............................................................................. 5 Table 3.1 HAZID/ENVID Actions ............................................................................................ 6 Table of Figures Figure 1-1: Outline System Schematic ................................................................................... 2

    

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 2 of 26

1. Introduction 1.1. Document Purpose and Scope E.ON UK has commissioned Genesis Oil and Gas Consultants Ltd. (GOGC) to perform the Front End Engineering Design (FEED 1a) for the pipeline and offshore facility associated with the E.ON Kingsnorth Carbon Capture and Storage (CCS) development project. An outline system schematic of the development is presented in Figure 1-1.

Kingsnorth Power Station

Meter

Kingsnorth Platform

Compressor

ESDV Landfall  Valve

ESDV

CCS Pig  Receiver

CCS Pig Launcher

Onshore  Pipeline

Landfall

Offshore  Pipeline

Figure 1-1: Outline System Schematic As required by both E.ON UK and GOGC risk management processes, the potential hazards associated with the system require identification by a hazard and environmental identification (HAZID/ENVID) process. This document details the output from a HAZID/ENVID meeting that took place on the 21st September at GOGC Aberdeen Offices. 1.2.

Objective The purpose of the meeting was to identify key safety, health and environmental (SHE) hazards that have the potential to significantly impact upon or influence the subsequent project design phases. Where such hazards were identified, the proposed measures to prevent, control or mitigate them were reviewed. Where necessary, further or alternative measures were actioned.

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 3 of 26

The overall objective of the HAZID/ENVID was to, wherever possible; ensure that the inherent safety, health and environmental principles are applied to the project design and to prescribe philosophies or controls to manage residual risks. 1.3.

Scope The HAZID/ENVID meeting covered both the Kingsnorth Platform structure as well as the process equipment. The scope of the process equipment review started at the riser base connection, through the filters, meters and heaters and ended at the CO2 injection master well valve. Due to the lack of detail design definition at the time of the meeting, decommissioning of the platform was outside of the HAZID/ENVID review scope. SHE issues not impacting upon or influencing the FEED 1a design or its operating philosophy were outside the scope of the HAZID/ENVID meeting.

1.4.

Abbreviations CCS ENVID GOGC HAZID SHE TOR

Carbon Capture and Storage Environmental Hazard Identification Genesis Oil and Gas Consultants Ltd Hazard Identification Safety, Health and Environmental Terms of Reference

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 4 of 26

2. Methodology 2.1. Overview The HAZID/ENVID Terms of Reference (TOR) [Ref. S1] was used as the methodology basis for the meeting. 2.2. HAZID/ENVID Nodes The study scope was divided into the following nodes to facilitate appropriate examination: Node 1: The Kingsnorth Platform including the civil structure, process equipment, riser and CO2 injection lines. Node 1.1: Construction; Node 1.2: Commissioning and Operation, including drilling activities. The TOR detailed Node 2 as the onshore and offshore pipeline. Node 2 was not examined during the HAZID/ENVID due to insufficient time remaining after studying the aforementioned nodes. 2.3. HAZID/ENVID Process The HAZID/ENVID guidewords were systematically applied to each of the study nodes to identify hazards that have the potential to give rise to safety, health or environmental consequences of concern. The proposed prevention, control and associated mitigation measures were explored for each hazard that has the potential to give rise to consequences of concern. Further or alternative measures were proposed where the team were of the opinion that the proposed prevention, control or mitigation measures are not sufficient to reduce the associated risks to as low as is reasonably practicable levels. Meeting attendees were reminded that the project was in FEED 1A. The focus of the meeting was therefore upon the identification of key safety, health and environmental hazards that had the potential to significantly impact upon or influence the subsequent design phases. An E.ON UK provided HAZID/ENVID worksheet was used to record the minutes of the meeting. The worksheet was projected on a screen such that all participants could see its development during the meeting. Worksheet entries were made by exception, i.e. only HAZID/ENVID guidewords that gave rise to consequence of concern were recorded. Several drawings were referenced during the meeting and are listed in Table 2.1.

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 5 of 26

2.4. Reference Materials The materials referenced during the meeting are summarised in Table 2.1 and presented in Appendix B. Document /Drawing Title Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 1 Layout Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 2 Layout Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 3 Layout Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 4 Layout Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Weather Deck Layout Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Elevation Looking East Kingsnorth Carbon Capture And Storage – PFD Platform & Pipeline Material Selection Diagram (Gaseous Phase) Table 2.1 List of HAZID/ENVID Reference Materials

Document Reference

Rev

J71584-A/ L-DW-sk1

A1

J71584-A/ L-DW-sk2

A1

J71584-A/ L-DW-sk3

A1

J71584-A/ L-DW-sk4

A1

J71584-A/ L-DW-sk5

A1

J71584-A/ L-DW-sk6

A1

KCP-GNS-PCD-PFD0010

01

2.5. Meeting Attendees Table 2.2 details the meeting attendees. The range of personnel ensured that the necessary skills, knowledge and experience were available to perform a thorough and accurate HAZID/ ENVID. Role

Name

Company

Name Deleted Name Deleted

HAZID/ ENVID Meeting Chairman

GOGC

Safety Lead and Meeting Secretary

GOGC

Name Deleted

Safety Consultant

E.ON UK

Name Deleted

Process Lead

GOGC

Name Deleted

Facilities Lead Civil and Structural

GOGC

Name Deleted

Environmental Lead

GOGC

Name Deleted

Environmental Consultant

E.ON NT

Name Deleted

Production Technologist

Baker RDS

Name Deleted

Completion Engineer

Baker RDS

Name Deleted

Client Representative

E.ON

Table 2.2 List of HAZID/ENVID Attendees #

Part time.

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 6 of 26

3. Main Findings and Actions Arising The completed HAZID/ENVID worksheets are presented in Appendix C. The HAZID/ENVID did not raise any issues that were likely to significantly affect the design of the Kingsnorth topsides process or structure. The six actions that arose during the HAZID/ENVID are detailed in Table 3.1.

Action No. 1

Action

Actionee

Action Due Date

Take cognisance of environmental report KCP-GNS-SHE-REP-0007 when determining the pile size

Name Deleted

End FEED 1B

2

Devise security philosophy for construction and NUI operation

Name Deleted

End FEED 2

3

Provide justification of a temperature lower than -50C will not be experienced at the wellhead during depressurisation of the topsides facilities

Name Deleted

31 Oct 2010

4

Confirm onshore compression has pressure protection to prevent exceeding 60 barg during gas phase operation

Name Deleted

30 Sept 2010

5

Reconfigure well arrangement to minimise distance between tree and wellhead valves and provide ready access to both

Name Deleted

30 Sept 2010

6

Produce integrated plan, to ensure drilling schedule identifies this hazard [drilling after pressurisation of topsides] and safeguard to manage risks

Name Deleted

End FEED 2

Table 3.1 HAZID/ENVID Actions

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 7 of 26

4. Supporting References [S1]

Kingsnorth Carbon Capture & Storage Project - Kingsnorth Platform and Pipeline HAZID/ENVID Meeting Terms of Reference - KCP-GNS-SHE-TOR-0001 Draft.

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 8 of 26

Appendix List of Appendices Appendix A

HAZID/ENVID Guidewords

Appendix B

HAZID/ENVID Reference Materials

Appendix C

Completed HAZID/ENVID Worksheets

Appendix D

HAZID/ENVID Action Sheets

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 9 of 26

Appendix A: HAZID/ENVID Guidewords 1

2

Process Parameters Temperature

Pressure

Flow

Level

Inventory

Compositions

Flash point

Toxicity

Corrosivity

Solid deposition

Wax / hydrates

Chemical reaction

Materials of construction/compatibility

Kinetic Energy

Potential Energy

Black start

Start up

Shutdown

Normal operation

SIMOPS

Sampling

Calibrating

Testing

Service failure (air, water, etc)

Emergency shutdown

Blowdown

Isolation

Draining / venting

Purging / filling

Winterisation

Operational access

Maintenance access

Confined spaces

Means of escape

Means of evacuation

Life saving appliances

Liquid effluent

Solid effluent

Venting

Noise level

Flaring

Air intakes / exhausts

Ventilation

Pressurisation

Gas / Oxygen enrichment

Extreme weather

Humidity

Illumination

Discharges to Air

Discharges to Water

Odour

Environmental Receptors (including Population).

Energy Efficiency

Lightening

Smoke / gas detection

Active fire protection

Operating methods

Maintenance 3

4

5

Access / egress

Environment

Loss prevention Fire / head detection Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

6

7

8

9

10

Page 10 of 26

Fire areas

Area classification

Passive fire protection

Blast overpressure

HP / LP interfaces

Deluge drains

Ignition sources

Leak sources

Plant and equipment Design pressure

Design temperature

Materials of construction

Vibration

Thermal stress

Pressure cycling

Hydraulic shock

Static electricity

Ionising radiation

Mechanical seals

Liquid seals

Vacuum protection

Galvanic corrosion

By-pass valves

Hazardous areas

Structures Loads on / strength of

Structure / foundations / equipment supports

Type of loads

Static / dynamic / environmental

Creep

Scour

Fire / blast walls

Impact protection

Weights limits

Platforms

Handrails

Bunds / Drains

Stairs / Ladders

Walkways

Airlocks / doors

Floors / Hatches

ESD, F+G logic

Control software

DCS failure

Failure modes

System reliability

Alarms and trips

High integrity systems

Overrides and resets

Control room ergonomics

Power supplies

DC supplies

Battery supplies / UPS

Distribution boards

Cable routes

Inductive effects

Load shedding

Overload protection

Heat tracing

Motor start frequency

Emergency lighting

EMC

PA system

Signs

Control systems

Electrical systems

Communication Radios Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Beacons / klaxons 11

12

13

14

15

Page 11 of 26

Nav Aids

Installation Temporary supports

Sequence of events

Rigging

Lifting points

Scaffolding

Hot work

Hot tap / line freeze

Specialist welding

Tie-in points

Personnel / Occupational Hazards Slips / trips / falls

Electrocution

Hot / cold environment

Hand tools

Manual handling

Equipment failure

Hazardous chemicals

Machine tools

High level working

Rigging lines

Ionising radiation

Toxic gases / fume

Inert gases

Smoke

Steam

Asbestos

Crew change

Roles and responsibilities

Overboard working

Human Factors

Dropped objects Containers

Gas bottle

Swinging loads

Small overhead objects

Drill pipe / casing

Drill collars

Scaffolding

Anchors

Special lifts

Shuttle tanker

Supply vessel

Standby boat

Shipping lanes

Drilling rig

Diving support vessel

Anchor handling vessel

Helicopter

Fishing vessel

DP System

Anchors

Pipelines

Chains / cables

Work < 500 m

Buoys

Temporary Refuge

Command Structure

Special procedures

Fire and Explosion

H2S Gas

TEMPSC

EER

Helicopters

Vessels

Marine

Emergency Response

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 12 of 26

Isolation 16

17

18

Drilling Drilling

Workover

Wirelining

Mechanical problems

Well control problems

Drillstring problems

Formation problems

Shallow gas

Mud weight

Dropped objects

Life support

DSV

Breaking containment

Process operation

Maintenance

Security access

Vehicles

Drains

Cranes

Excavations

Earth moving

Temporary facilities

Third party contractors

Diving

Site operations

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03 Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 13 of 26

Appendix B: HAZID/ENVID Reference Materials

Appendix

Document Reference

Rev

J71584-A/ L-DW-sk1

A1

J71584-A/ L-DW-sk2

A1

B3

Kingsnorth Offshore Platform Level 1 Layout Kingsnorth Hewitt Offshore Platform Level 2 Layout Kingsnorth Offshore Platform Level 3 Layout

J71584-A/ L-DW-sk3

A1

B4

Kingsnorth Offshore Platform Level 4 Layout

J71584-A/ L-DW-sk4

A1

B5

Kingsnorth Platform Weather Deck Layout Kingsnorth Offshore Platform Elevation Looking East Kingsnorth Platform & Pipeline Material Selection Diagram (Gaseous Phase)

J71584-A/ L-DW-sk5

A1

J71584-A/ L-DW-sk6

A1

KCP-GNS-PCD-PFD0010

01

B1 B2

B6 B7

Document /Drawing Title

Kingsnorth CCS Demonstration Project The information contained in this document (the Information) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 14 of 26

Appendix B1 - Kingsnorth Offshore Platform Level 1 Layout

KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 15 of 26

Appendix B2 - Kingsnorth Offshore Platform Level 2 Layout

KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 16 of 26

Appendix B3 - Kingsnorth Offshore Platform Level 3 Layout

KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 17 of 26

Appendix B4 - Kingsnorth Offshore Platform Level 4 Layout

KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 18 of 26

Appendix B5 - Kingsnorth Offshore Platform Level 5 Layout

KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 19 of 26

Appendix B6 - Kingsnorth Offshore Platform Elevation Looking East

KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1-Offshore Platform HAZ D-ENVID Report doc

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

Page 20 of 26

Appendix B7 - Kingsnorth PFD Platform & Pipeline Material Selection Diagram (Gaseous Phase)

KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZID-ENV D Report.doc

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title: Document Title:

Kingsnorth Carbon Capture & Storage Project

Page 21 of 26

Offshore Platform HAZID/ENVID Report

Appendix C: Completed HAZID/ENVID Worksheets HAZARD SCENARIO

CAUSES

CONSEQUENCES

POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE

POTENTIAL IMPACT TO THE ENVIRONMENT

RECOMMENDED SAFEGUARDS

ACTIONS/ COMMENTS (No)

Node 1.1: Kingsnorth Platform (construction) – including civil structures, process equipment, riser and CO2 injection 1

Operational access – potential diver access required during installation

Design requires diver intervention

Potential for diver injury/incident

Diver injury

Design jacket for installation without diver intervention (pipeline connection to riser to be considered as part of pipeline HAZID)

2

Construction access – working at height and overside working.

Necessity to complete jacket-topsides connection

Requirement for access to potentially elevated or difficult to reach areas including overside working

Potential for personnel injury

Provision of temporary access structures for completion of jacket- topsides connection, Access from ESDV deck may be considered as an option..

3

Noise/v bration

Piliing activities

Potential requirement for Disturbance Licence.

Occupational noise in excess of first action limit

Potential effect on protected species – possible damage or hearing loss.

Minimise size of pile consistent with platform structural integrity and stability. See KCP-GNS-SHEREP-0007

4

Nav Aids – vessel collision due to absence of navigational aids

Marine obstruction – unmarked by Nav Aids

Increased risk of passing vessel collision

Potential for personnel injury on both vessel and platform

Potential loss of containment of vessel cargo or fuel.

Nav Aids to be installed in accordance with regulatory requirements – at the installation stage of jacket and topsides. Note that temporary support for Nav Aids on the jacket will be required if it is to be left without topsides after installation.

KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc

(1) Take cognisance of environmental report KCP-GNSSHE-REP-0007 when determining the pile size – ?? FEED 1B

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

HAZARD SCENARIO

CAUSES

CONSEQUENCES

5

Third Party intervention

Unauthorised third party gaining access to platform (possibly when unattended)

Potential project delay

Potential personnel injury (to third parties or any personnel onboard)

6

Decommissioning

Inability to remove completely the facility during decommissioning

Delay to project due to rejection of FDP because of inadequate decommissioning plans. Risk to shipping as a result of structures left subsea.

Potential;impact to vessel crew

POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE

Page 22 of 26

POTENTIAL IMPACT TO THE ENVIRONMENT

RECOMMENDED SAFEGUARDS

Consideration of standby vessel during construction phase and CCTV on topsides.

Potential loss of containment of vessel cargo or fuel.

ACTIONS/ COMMENTS (No) (2) Devise security philosophy for construction and NUI operation – ?? – FEED 2.

Installation is designed to be removed, as a reversal of installation.

All guidewords checked: Y Base case and variation considered: N

KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

HAZARD SCENARIO

CAUSES

CONSEQUENCES

POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE

Page 23 of 26

RECOMMENDED SAFEGUARDS

POTENTIAL IMPACT TO THE ENVIRONMENT

ACTIONS/ COMMENTS

Node 1.2: Kingsnorth Platform (Commissioning and operation) – including drilling activities, operational process equipment, riser and CO2 injection 1

Low Temperature

Heater failure during early dense phase operations (low reservoir pressure)

Potential Xmas tree failure causing loss of containment. Loss of tubing integrity

Toxic/asphyxiation impact of CO2

Wellhead specification (-50 C) is adequate to deal with heater failure and JT effect with maximum upstream pressure – during dense phase Ref KCPGNS-PCD-REP-0007. Low temperature trip downstream of heaters isolates the well stream. Isolation of loss of containment – DHSV and flowline SDV. Gaseous operation to continue long enough for wellhead pressure to be sufficiently high to obviate this scenario.

2

Low Temperature

Blowdown of topsides results in low temperature in topsides pipework, up to Xmas trees – minimum achievable temperature is -79C.

Brittle failure to pipework due low temperature, leading to loss of containment

KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc

Toxic/asphyxiation impact of CO2

Material specification is rated for the lowest temperature likely to occur.

(3) Provide justification of a temperature lower than -50C will not be experienced at the wellhead during depressurisation of the topsides facilities – ?? – Oct 10

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Page 24 of 26

Document Title:

Offshore Platform HAZID/ENVID Report

HAZARD SCENARIO

CAUSES

CONSEQUENCES

3

Low Temperature

Pipework failure on topsides

Low temperature CO2 release (gas and dry ice), ultimately causing structural failure and large temperatures gradients leading to buckling and failure.

Toxic/asphyxiation impact of CO2 plus personnel injury resulting from structural failure.

Material specification is rated for the lowest temperature likely to occur. Construction to reduce flanges and use all welded design where possible. Orientation of tappings, flanges etc . to minimise the effects of LOC incidents. Shielding (for structure and escapeways) to be provided where needed. Covered in layout review report.

4

High temperature

Continued heating of trapped inventory (gaseous and dense phases)

Exceedence of pressure/temperature rating of pipework.

Toxic/asphyxiation impact of CO2

Multiple high temperature trips – gaseous phase.

CO2 leak detection to be installed and executive action to isolate topsides and curtail leak.

POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE

5

High Pressure

Pipeline/topsides packing due to continued CO2 compression with wells closed in (no other topsides isolations closed)

Topsides heaters rated at 60 barg, so will fail when pressure exceeds this. Other equipment is rated to 150 barg.

Toxic/asphyxiation impact of CO2

6

Composition

High water content in CO2

Increased rate of corrosion – topsides is stainless steel so main effect is on riser/pipelines and wellheads. Increased risk of hydrate formation

Toxic/asphyxiation impact of CO2

KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc

POTENTIAL IMPACT TO THE ENVIRONMENT

RECOMMENDED SAFEGUARDS

ACTIONS/ COMMENTS

Dense phase includes pressure relief to provide adequate protection.

Possible CO2 release into sea

(4) Confirm onshore compression has pressure protection to prevent exceeding 60 barg during gas phase operation – ?? 30 Sept 10.

Water content monitoring at onshore dehydration. (automatic with manual back-up) PIMS and wellheads integrity management system. Hydrate inhibition package to protect against topsides choke blockage.

Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

HAZARD SCENARIO

CAUSES

CONSEQUENCES

7

Extraneous matter in pipeline

Contamination of well, leading to decreased injectivity. Filter blinding, requiring frequent filter changes.

Potential need for additional workovers, resulting in increased personnel risk exposure

Composition

POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE

Increased personnel presence on platform.

Page 25 of 26

POTENTIAL IMPACT TO THE ENVIRONMENT Environmental footprint due to the need to drill additional well.

RECOMMENDED SAFEGUARDS

Rigorous cleaning programme for pipeline during commissioning. Water content monitoring at onshore dehydration. Filters installed topsides as final layer of protection for wells with differential pressure monitoring.

8

Flash point

Methanol storage and use

Potential flammable atmosphere and fire if ignited

Potential for personnel injury – fire invisible to personnel

Hazardous area classification process and selection of appropriate ATEX equipment. Nitrogen blanket on storage. Fire detection provided and portable AFFF for firefighting.

9

Reverse flow

Fractured flowline results in backflow from well, potentially containing hydrocarbons.

Potential fire if concentration of hydrocarbon above LFL.

Potential for personnel injury from fire and from release.

Head of CO2 in well column inhibits flow of hydrocarbon gas up to the wellhead. Check valve on flowline linlet. Xmas tree valve and DHSV to isolate reservoir and mitigate release.

Fractured flowline results in backflow from well.

Release of CO2 from well

10

Reverse flow

ACTIONS/ COMMENTS

During well completion, base of production tubing would contain completion fluid and brine, with low top hole pressure. Perforation into the reservoir would result in completion fluid flowing into the reservoir. Some hydrocarbons may flow into the production tubing, but with low pressure at the top of the tubing. Once CO2 injection commences, any fluid in the well column and in the near wellbore section of the reservoir would be displaced. Any well startup would be with a positive pressure into the welll (2.5 bar or more) thus ensuring no reverse flow case is credible during startup.

KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc

Toxic CO2 impact on personnel

CO2 leak detection to be installed and executive action to isolate topsides and curtail leak, along with Xmas tree valves and DHSV. Print Date: 25 March 2011

KCP-GNS-IFS-HAZ-0001 Revision: 03

Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Offshore Platform HAZID/ENVID Report

HAZARD SCENARIO

CAUSES

CONSEQUENCES

11

Startup

Initial startup results filters requiring frequent changeout.

Personnel presence on platform increased for changeout operations, resulting in increased associated risk

Personnel injury, manual handling and potential impact of CO2 release if inadequately isolated.

12

Well Arrangement

Operational access to wellhead and tree valving with minimised conductor riser height to allow direct connection at a low a level as can be achieved. Spool piece section introduces additional leak path

Ready access to wellhead valves for pressure monitoring and for workover activities.

Increased risk of loss of containment events

POTENTIAL IMPACT TO PEOPLE ON AND OFFSITE

Page 26 of 26

POTENTIAL IMPACT TO THE ENVIRONMENT

RECOMMENDED SAFEGUARDS

ACTIONS/ COMMENTS

Filter replacement will include positive isolation, venting and pressure confirmation, with safe system of work to control operations.

(5) Reconfigure well arrangement to minimise distance between tree and wellhead valves and provide ready access to both- ?? – 30 Sept 10.

Increased risk of loss of containment events

Additional leak path introduced by use of spool piece below tree.

13

Drilling

Drilling activity results in dropped object that damages process pipework

Potential loss of containment resulting in CO2 release should the topsides be pressured.

Potential harm to personnel in the event of a LOC, including impact to drilling rig and crew.

Undertake initial drilling of wells prior to pressurisation of topsides process.

14

Vehicles (fishing and other vessels)

Concurrent significant CO2 release and vessels within effect radii.

Build-up of cold CO2 at sea surface around platform.

Potential for harm to vessel crew.

CO2 detection with appropriate executive action maybe combined with warning of shipping in vicinity by radio and/or General Alarm.

(6) Integrated Plan, to ensure drilling schedule identifies this hazard and safeguard to manage risks – E.ON FEED 2.

All guidewords checked: Y Base case and variation considered: N

KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc

Print Date: 25 March 2011